Linked Data API

Show Search Form

Search Results

1402919
registered interest false more like this
date less than 2022-01-13more like thismore than 2022-01-13
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty's Government what assessment they have made of the effects on (1) the economy, and (2) connectivity, of South West England of South Western Railway's decision to cease providing through services from Exeter to London Waterloo, with trains splitting at Salisbury. more like this
tabling member printed
Lord Patten more like this
uin HL5400 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2022-01-24more like thismore than 2022-01-24
answer text <p>South Western Railway advises that its temporary timetable, which commenced on Monday 17 January 2022, comfortably retains enough capacity to meet demand whilst ensuring that many services for key workers and schools have been retained.</p><p>The impact of the latest COVID variant has led to a sharp increase in staff absenteeism and a drop in passenger demand. Consequently, as part of the overall reductions in service, direct services between Exeter to London Waterloo will not be available during the temporary timetable period, as was the case in the same period last year.</p><p>South Western Railway has assured the Department that the timetable will be kept under constant review.</p> more like this
answering member printed Baroness Vere of Norbiton more like this
question first answered
less than 2022-01-24T12:11:01.12Zmore like thismore than 2022-01-24T12:11:01.12Z
answering member
4580
label Biography information for Baroness Vere of Norbiton more like this
tabling member
1137
label Biography information for Lord Patten more like this
1383029
registered interest false more like this
date less than 2021-11-29more like thismore than 2021-11-29
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what assessment he has made of the adequacy of the performance of train services on the Salisbury to Exeter line. more like this
tabling member constituency West Dorset more like this
tabling member printed
Chris Loder more like this
uin 83489 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-12-06more like thismore than 2021-12-06
answer text <p>Department officials are challenging South Western Railway (SWR) over the performance of the West of England Line where performance has fallen below the standards required recently. The South Western Railway National Rail Contract contains provisions to incentivise the operator to ensure services are run to the agreed timetable and where this is not the case, actions be taken to rectify any causation factors.</p><p> </p> more like this
answering member constituency Daventry more like this
answering member printed Chris Heaton-Harris more like this
question first answered
less than 2021-12-06T15:06:51.23Zmore like thismore than 2021-12-06T15:06:51.23Z
answering member
3977
label Biography information for Chris Heaton-Harris more like this
tabling member
4751
label Biography information for Chris Loder more like this
1091621
registered interest false more like this
date less than 2019-03-19more like thismore than 2019-03-19
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty's Government what assessment they have made of the impact of the ability to join and split trains at Yeovil Junction on the number of services that might be run between Salisbury and Exeter Central. more like this
tabling member printed
Lord Patten more like this
uin HL14666 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-03-28more like thismore than 2019-03-28
answer text <p>Network Rail’s Wessex Route Study concluded that the forecast levels of growth did not justify the need for additional infrastructure expenditure along this section of the West of England line, including any works associated with splitting and joining trains at Yeovil Junction.</p> more like this
answering member printed Baroness Sugg more like this
question first answered
less than 2019-03-28T13:49:39.737Zmore like thismore than 2019-03-28T13:49:39.737Z
answering member
4584
label Biography information for Baroness Sugg more like this
tabling member
1137
label Biography information for Lord Patten more like this
1036926
registered interest false more like this
date less than 2019-01-07more like thismore than 2019-01-07
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty's Government what assessment they have made of the impact of the stretches of single track railway between Waterloo and Exeter on the movement of passengers and freight on that line. more like this
tabling member printed
Lord Patten more like this
uin HL12568 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-01-16more like thismore than 2019-01-16
answer text <p>Network Rail’s 2015 Wessex Route Study identified the single track sections on the route between Salisbury and Exeter and platform capacity at Salisbury as some of the factors constraining journey times, increasing the number of services and overall line resilience between Exeter and Waterloo.</p><p> </p><p>However, the Route Study concluded that the forecast levels of growth between Salisbury and Exeter did not warrant inclusion of additional sections of double track as a priority in the next Control Period (CP6).</p> more like this
answering member printed Baroness Sugg more like this
question first answered
less than 2019-01-16T12:41:45.19Zmore like thismore than 2019-01-16T12:41:45.19Z
answering member
4584
label Biography information for Baroness Sugg more like this
tabling member
1137
label Biography information for Lord Patten more like this
1036927
registered interest false more like this
date less than 2019-01-07more like thismore than 2019-01-07
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty's Government what assessment they have made of the cost of upgrading all of the railway line between Waterloo and Exeter to double track. more like this
tabling member printed
Lord Patten more like this
uin HL12569 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-01-17more like thismore than 2019-01-17
answer text <p>Network Rail’s 2015 Wessex Route Study concluded that the forecast levels of growth between Salisbury and Exeter did not justify the need for additional sections of double track. Therefore, upgrading the single track sections of the line between London Waterloo and Exeter to double track is not a priority in the next Control Period (CP6). Further consideration may be given to this matter in Network Rail’s long term planning considerations for subsequent control periods.</p> more like this
answering member printed Baroness Sugg more like this
question first answered
less than 2019-01-17T13:21:38.59Zmore like thismore than 2019-01-17T13:21:38.59Z
answering member
4584
label Biography information for Baroness Sugg more like this
tabling member
1137
label Biography information for Lord Patten more like this
776798
registered interest false more like this
date less than 2017-10-24more like thismore than 2017-10-24
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty's Government what assessment they have made of the impact of the stretches of single track railway on the Waterloo–Exeter mainline on the economy of south-western England. more like this
tabling member printed
Lord Patten more like this
uin HL2462 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-11-03more like thismore than 2017-11-03
answer text <p>The Secretary of State for Transport has made no recent assessment of the impact of the stretches of single line track on the Waterloo – Exeter mainline on the economy of South-Western England. Network Rail’s Wessex Route Study concluded that the forecast levels of growth between Salisbury and Exeter did not justify the need for additional sections of double track.</p> more like this
answering member printed Baroness Sugg more like this
question first answered
less than 2017-11-03T11:04:03.96Zmore like thismore than 2017-11-03T11:04:03.96Z
answering member
4584
label Biography information for Baroness Sugg more like this
tabling member
1137
label Biography information for Lord Patten more like this
776799
registered interest false more like this
date less than 2017-10-24more like thismore than 2017-10-24
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty's Government what assessment they have made of the impact of the stretches of single line track on the Waterloo–Exeter mainline on train punctuality. more like this
tabling member printed
Lord Patten more like this
uin HL2463 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-11-03more like thismore than 2017-11-03
answer text <p>The Secretary of State for Transport has made no recent assessment of the impact of the stretches of single line track on the Waterloo – Exeter mainline on train punctuality. Network Rail’s Wessex Route Study concluded that the forecast levels of growth between Salisbury and Exeter did not justify the need for additional sections of double track.</p> more like this
answering member printed Baroness Sugg more like this
question first answered
less than 2017-11-03T11:05:32.99Zmore like thismore than 2017-11-03T11:05:32.99Z
answering member
4584
label Biography information for Baroness Sugg more like this
tabling member
1137
label Biography information for Lord Patten more like this
750562
registered interest false more like this
date less than 2017-07-11more like thismore than 2017-07-11
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text Her Majesty's Government, further to the Written Answer by Lord Callanan on 28 June (HL8), on what basis Network Rail has decided that the scheme to double the track between Tisbury and Wilton Junction is not a priority. more like this
tabling member printed
Lord Patten more like this
uin HL694 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-07-18more like thismore than 2017-07-18
answer text <p>Network Rail’s Wessex Route Study, published in August 2015, concluded that the forecast levels of growth between Salisbury and Exeter did not justify the need for addition sections of double track along the route in the period up to 2024.</p> more like this
answering member printed Lord Callanan more like this
question first answered
less than 2017-07-18T10:44:46.46Zmore like thismore than 2017-07-18T10:44:46.46Z
answering member
4336
label Biography information for Lord Callanan more like this
tabling member
1137
label Biography information for Lord Patten more like this
730978
registered interest false more like this
date less than 2017-06-21more like thismore than 2017-06-21
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text Her Majesty's Government what is their assessment of the likely date for the doubling of the single-track railway between Tisbury, Wiltshire, and Wilton Junction, Salisbury. more like this
tabling member printed
Lord Patten more like this
uin HL8 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-06-28more like thismore than 2017-06-28
answer text <p>Network Rail have evaluated this scheme and have not identified it as a priority. The Department for Transport intends to set out the outcomes we want from the rail network in Control Period 6 (CP6 – 2019 to 2024) during the remainder of 2017, starting with the High Level Output Specification (HLOS), which is expected to be published in July.</p> more like this
answering member printed Lord Callanan more like this
question first answered
less than 2017-06-28T11:08:47.213Zmore like thismore than 2017-06-28T11:08:47.213Z
answering member
4336
label Biography information for Lord Callanan more like this
tabling member
1137
label Biography information for Lord Patten more like this
671113
registered interest false more like this
date less than 2017-01-10more like thismore than 2017-01-10
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading West of England Line remove filter
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty’s Government, following the publication in December 2016 of the report by the Office of Rail and Road into station usage, what is their assessment of the feasibility of converting the present single track railway on the Exeter to London Waterloo mainline between Tisbury and Dinton, in Wiltshire, to double track as it was previously. more like this
tabling member printed
Lord Patten more like this
uin HL4516 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-01-24more like thismore than 2017-01-24
answer text <p>Network Rail have assessed the potential growth in passenger and freight demand in the period up until 2043, including future demand on the line between London, Salisbury and Exeter as part of the Wessex Route study which was published in August 2015.</p><p> </p><p>The study identified a potential scheme to upgrade the line between Exeter and Salisbury through the creation of additional double track sections between Salisbury and Yeovil as an option for delivery in the period after 2025.</p> more like this
answering member printed Lord Ahmad of Wimbledon more like this
question first answered
less than 2017-01-24T12:20:45.413Zmore like thismore than 2017-01-24T12:20:45.413Z
answering member
4210
label Biography information for Lord Ahmad of Wimbledon more like this
tabling member
1137
label Biography information for Lord Patten more like this