Linked Data API

Show Search Form

Search Results

1729317
registered interest false more like this
date less than 2024-09-12more like thismore than 2024-09-12
answering body
Ministry of Housing, Communities and Local Government more like this
answering dept id 7 more like this
answering dept short name Housing, Communities and Local Government more like this
answering dept sort name Housing, Communities and Local Government more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Housing, Communities and Local Government, what data her Department holds on the number of buildings over (a) 11 and (b) 18 metres in Gateshead Central and Whickham constituency that have aluminium composite material cladding. more like this
tabling member constituency Gateshead Central and Whickham more like this
tabling member printed
Mark Ferguson more like this
uin 5712 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-10-08more like thismore than 2024-10-08
answer text <p>The department collects data on the number of residential buildings over 18 metres in height in England with unsafe aluminium composite material (ACM) cladding. In the Gateshead Central and Whickham constituency, fewer than 10 such buildings have been identified, but the exact number cannot be disclosed to protect the privacy of individual buildings.</p><p>Leaseholders in buildings over 11 metres or five storeys are protected from paying for remediation of safety defects if the developer has signed the developer remediation contract. Additionally, the Government has made £5.1 billion available through the Building Safety Fund and Cladding Safety Scheme to cover cladding repairs for buildings over 18 metres where no responsible developer can be identified.</p><p>Furthermore, Remediation Contribution Orders provide leaseholders with a means to recover historical safety remediation costs from those responsible, such as developers.</p><p>The Leasehold Advisory Service (LEASE), funded by the department, offers free legal advice to leaseholders.</p><p>Developers who have signed the remediation contract are responsible for funding assessments and completing all fire safety work, including non-cladding issues, in line with PAS9980 standards for external works and relevant standards for internal works, all at their own expense.</p>
answering member constituency Bethnal Green and Stepney more like this
answering member printed Rushanara Ali more like this
grouped question UIN
5713 more like this
5714 more like this
question first answered
less than 2024-10-08T10:00:21.67Zmore like thismore than 2024-10-08T10:00:21.67Z
answering member
4138
label Biography information for Rushanara Ali more like this
tabling member 5031
1727627
registered interest false more like this
date less than 2024-09-05more like thismore than 2024-09-05
answering body
Ministry of Housing, Communities and Local Government more like this
answering dept id 7 more like this
answering dept short name Housing, Communities and Local Government more like this
answering dept sort name Housing, Communities and Local Government more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Housing, Communities and Local Government, what recent steps her Department has taken to identify buildings affected by (a) dangerous cladding and (b) other fire safety issues. more like this
tabling member constituency Ashfield more like this
tabling member printed
Lee Anderson more like this
uin 4416 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-09-13more like thismore than 2024-09-13
answer text <p>The Government has been clear that more must be done to accelerate the pace of remediation of unsafe buildings across the country.</p><p>After the Grenfell Tower tragedy, the Government prioritised identifying and providing funding for the highest risk buildings with unsafe cladding. Fire and rescue services and local authorities conducted a risk review of high-rise buildings over 18 metres in height, and building owners were required to register high-rise buildings with the department and apply for government funding to remove dangerous cladding.</p><p>The Building Safety Act 2022 establishes a new regulatory regime for high-rise buildings, which requires all residential buildings above 18m to be registered with the Building Safety Regulator by October 2023. The regulator has powers to pursue any building owner who fails to comply, including prosecuting for non-compliance.</p><p>In 2022, the Cladding Safety Scheme (CSS) was launched, to meet the cost of addressing life safety fire risks associated with cladding in buildings over 11 metres. We estimate that there may be as many as 7,000 buildings that need remediation that have not yet applied for the scheme. Eligible building owners must apply for this scheme, and leaseholders can utilise ‘Tell us tool’ to self-refer their building. <a href="https://gbr01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.gov.uk%2Fguidance%2Ftell-us-about-life-safety-fire-risks-on-the-external-wall-system-of-your-building&amp;data=05%7C02%7CPatrick.Kelly%40communities.gov.uk%7Cb5b3bf3b9b8f46e694aa08dcd34145f5%7Cbf3468109c7d43dea87224a2ef3995a8%7C0%7C0%7C638617524508668633%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&amp;sdata=iNm%2FolRZrWMlVAUqoBDrtxZwtyNlP1hyhf1D178f8N4%3D&amp;reserved=0" target="_blank">Tell us about life-safety fire risks on the external wall system of your building - GOV.UK (www.gov.uk)</a> The department is working at pace to identify buildings eligible for funding that are not coming forward. We are utilising specialist data sources and AI technology tools, and the CSS is contacting owners of identified buildings to check whether they have been assessed for unsafe cladding.</p><p>The Government has pressed the need for urgent action by local regulators to identify and assess buildings for unsafe cladding and other defects. The Government is supporting local authorities to boost their inspection and enforcement action by providing training, guidance and over £14 million in new burdens funding to date. We are writing to all metro mayors in England to ask for their support in driving forward local remediation acceleration plans to ensure buildings are identified and remediated at pace. We will set out further steps on plans to accelerate remediation this autumn.</p>
answering member constituency Bethnal Green and Stepney more like this
answering member printed Rushanara Ali more like this
question first answered
less than 2024-09-13T13:57:23.027Zmore like thismore than 2024-09-13T13:57:23.027Z
answering member
4138
label Biography information for Rushanara Ali more like this
tabling member
4743
label Biography information for Lee Anderson more like this
1725628
registered interest false more like this
date less than 2024-08-30more like thismore than 2024-08-30
answering body
Ministry of Housing, Communities and Local Government more like this
answering dept id 7 more like this
answering dept short name Housing, Communities and Local Government more like this
answering dept sort name Housing, Communities and Local Government more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Housing, Communities and Local Government, how many units of accommodation in the (a) private and (b) social housing sector have combustible cladding; on how many such units is work under way to remove such cladding; and how many such units have no such work planned. more like this
tabling member constituency Sheffield South East more like this
tabling member printed
Mr Clive Betts more like this
uin 2743 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-09-05more like thismore than 2024-09-05
answer text <p>The latest data on remediation progress of 11m+ buildings identified with unsafe cladding is available at: <a title="https://gbr01.safelinks.protection.outlook.com/?url=https%3a%2f%2fwww.gov.uk%2fgovernment%2fpublications%2fbuilding-safety-remediation-monthly-data-release-july-2024&amp;data=05%7c02%7cparliamentary%40communities.gov.uk%7ca13726dfc9ac40233f2808dccdc22d82%7cbf3468109c7d43dea87224a2ef3995a8%7c0%7c0%7c638611481081795901%7cunknown%7ctwfpbgzsb3d8eyjwijoimc4wljawmdailcjqijoiv2lumziilcjbtii6ik1hawwilcjxvci6mn0%3d%7c0%7c%7c%7c&amp;sdata=jkjuv3wucgmshoawelmdrhb648c23cllnmbon21xece%3d&amp;reserved=0" href="https://gbr01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.gov.uk%2Fgovernment%2Fpublications%2Fbuilding-safety-remediation-monthly-data-release-july-2024&amp;data=05%7C02%7CParliamentary%40communities.gov.uk%7Ca13726dfc9ac40233f2808dccdc22d82%7Cbf3468109c7d43dea87224a2ef3995a8%7C0%7C0%7C638611481081795901%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&amp;sdata=JkJuv3WUCgMSHOawELMDRHb648C23clLNmbon21xecE%3D&amp;reserved=0" target="_blank">https://www.gov.uk/government/publications/building-safety-remediation-monthly-data-release-july-2024</a>.</p><p>This shows that as of 31 July 2024, in the private housing sector, 2,127 buildings have been identified as having combustible cladding. Of these, 416 buildings have remediation works underway, and works have not started on 1,119 buildings. In the social housing sector, 2,405 buildings have been identified as having combustible cladding. Of these, 528 buildings have remediation works underway, and works have not started on 1,210 buildings.</p><p> </p>
answering member constituency Bethnal Green and Stepney more like this
answering member printed Rushanara Ali more like this
question first answered
less than 2024-09-05T16:02:39.407Zmore like thismore than 2024-09-05T16:02:39.407Z
answering member
4138
label Biography information for Rushanara Ali more like this
tabling member
394
label Biography information for Mr Clive Betts more like this
1723562
registered interest false more like this
date less than 2024-07-25more like thismore than 2024-07-25
answering body
Ministry of Housing, Communities and Local Government more like this
answering dept id 7 more like this
answering dept short name Housing, Communities and Local Government more like this
answering dept sort name Housing, Communities and Local Government more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Housing, Communities and Local Government, what steps she plans to take to help those impacted by high insurance premiums in properties affected by (a) cladding and (b) remediation issues. more like this
tabling member constituency North West Essex more like this
tabling member printed
Mrs Kemi Badenoch more like this
uin 1759 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-08-02more like thismore than 2024-08-02
answer text <p>We will review how to better protect leaseholders from costs and take steps to accelerate the pace of remediation across the country. We will put a renewed focus on ensuring those responsible for the building safety crisis pay to put it right.</p> more like this
answering member constituency Greenwich and Woolwich more like this
answering member printed Matthew Pennycook more like this
question first answered
less than 2024-08-02T12:40:34.613Zmore like thismore than 2024-08-02T12:40:34.613Z
answering member
4520
label Biography information for Matthew Pennycook more like this
tabling member
4597
label Biography information for Kemi Badenoch more like this
1722260
registered interest false more like this
date less than 2024-07-19more like thismore than 2024-07-19
answering body
Ministry of Housing, Communities and Local Government more like this
answering dept id 7 more like this
answering dept short name Housing, Communities and Local Government more like this
answering dept sort name Housing, Communities and Local Government more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Housing, Communities and Local Government, whether she plans to speed up cladding remediation programmes. more like this
tabling member constituency North West Essex more like this
tabling member printed
Mrs Kemi Badenoch more like this
uin 815 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-07-29more like thismore than 2024-07-29
answer text <p>The pace of remediation through Government funded schemes is not fast enough and we are committed to ensuring pace increases. We will continuously monitor the system, identify opportunities to increase speed, and intensify efforts to bring all remaining buildings into remediation schemes. We will address barriers within the system, including enforcing actions against uncooperative parties. We will empower regulators and local authorities to act, continue taking direct Government action, and consider new legislation as necessary.</p> more like this
answering member constituency Nottingham North and Kimberley more like this
answering member printed Alex Norris more like this
question first answered
less than 2024-07-29T14:05:10.783Zmore like thismore than 2024-07-29T14:05:10.783Z
answering member
4641
label Biography information for Alex Norris more like this
tabling member
4597
label Biography information for Kemi Badenoch more like this
1717960
registered interest false more like this
date less than 2024-05-14more like thismore than 2024-05-14
answering body
Department for Levelling Up, Housing and Communities more like this
answering dept id 211 more like this
answering dept short name Levelling Up, Housing and Communities more like this
answering dept sort name Levelling Up, Housing and Communities more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Levelling Up, Housing and Communities, with reference to his Department's publication entitled Building Safety Remediation: monthly data release - March 2024, published on 18 April 2024, for what reason the number of buildings assessed and found to require remediation has decreased compared to the quarterly report for (a) Crest Nicholson and (b) McCarthy and Stone. more like this
tabling member constituency Weaver Vale more like this
tabling member printed
Mike Amesbury more like this
uin 26220 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-17more like thismore than 2024-05-17
answer text <p>In our most recent publication, the department provided guidance that a building is only defined as requiring remediation if a work assessment has been completed. We understand there may be other buildings requiring remediation, and we are urgently requesting that buildings complete these work assessments. Should they determine work is required, future statistical releases will reflect that.</p><p>We expect developers to remediate the buildings for which they are contractually responsible as quickly as reasonably practicable, in line with the terms of the developer remediation contract. The time it may reasonably take to assess buildings will vary depending on factors including when third parties grant the developer access to the building and how the developer prioritises work to assess buildings across its portfolio, taking into account the relative safety risk likely to be associated with each building.</p><p>The department meets with developers regularly and closely monitors the performance of each developer against its contractual obligations, including progress on assessments. The developer remediation contract and the Government’s statutory Responsible Actors Scheme mean that developers face significant consequences if they fail to comply with their contractual obligations.</p>
answering member constituency North East Derbyshire more like this
answering member printed Lee Rowley more like this
grouped question UIN
26221 more like this
26222 more like this
question first answered
less than 2024-05-17T14:22:45.173Zmore like thismore than 2024-05-17T14:22:45.173Z
answering member
4652
label Biography information for Lee Rowley more like this
tabling member
4667
label Biography information for Mike Amesbury more like this
1717961
registered interest false more like this
date less than 2024-05-14more like thismore than 2024-05-14
answering body
Department for Levelling Up, Housing and Communities more like this
answering dept id 211 more like this
answering dept short name Levelling Up, Housing and Communities more like this
answering dept sort name Levelling Up, Housing and Communities more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Levelling Up, Housing and Communities, with reference to his Department's publication entitled Building Safety Remediation: monthly data release - March 2024, published on 18 April 2024, whether his Department has made an assessment of the adequacy of the pace of building assessments conducted by (a) Bellway, (b) Crest Nicholson and (c) Taylor Wimpey. more like this
tabling member constituency Weaver Vale more like this
tabling member printed
Mike Amesbury more like this
uin 26221 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-17more like thismore than 2024-05-17
answer text <p>In our most recent publication, the department provided guidance that a building is only defined as requiring remediation if a work assessment has been completed. We understand there may be other buildings requiring remediation, and we are urgently requesting that buildings complete these work assessments. Should they determine work is required, future statistical releases will reflect that.</p><p>We expect developers to remediate the buildings for which they are contractually responsible as quickly as reasonably practicable, in line with the terms of the developer remediation contract. The time it may reasonably take to assess buildings will vary depending on factors including when third parties grant the developer access to the building and how the developer prioritises work to assess buildings across its portfolio, taking into account the relative safety risk likely to be associated with each building.</p><p>The department meets with developers regularly and closely monitors the performance of each developer against its contractual obligations, including progress on assessments. The developer remediation contract and the Government’s statutory Responsible Actors Scheme mean that developers face significant consequences if they fail to comply with their contractual obligations.</p>
answering member constituency North East Derbyshire more like this
answering member printed Lee Rowley more like this
grouped question UIN
26220 more like this
26222 more like this
question first answered
less than 2024-05-17T14:22:45.22Zmore like thismore than 2024-05-17T14:22:45.22Z
answering member
4652
label Biography information for Lee Rowley more like this
tabling member
4667
label Biography information for Mike Amesbury more like this
1717962
registered interest false more like this
date less than 2024-05-14more like thismore than 2024-05-14
answering body
Department for Levelling Up, Housing and Communities more like this
answering dept id 211 more like this
answering dept short name Levelling Up, Housing and Communities more like this
answering dept sort name Levelling Up, Housing and Communities more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Levelling Up, Housing and Communities, with reference to his Department's Building Safety Remediation: monthly data release, updated on 18 April 2024, for what reason London Square Development (Holdings) Limited has no start dates planned for the remediation of its buildings. more like this
tabling member constituency Weaver Vale more like this
tabling member printed
Mike Amesbury more like this
uin 26222 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-17more like thismore than 2024-05-17
answer text <p>In our most recent publication, the department provided guidance that a building is only defined as requiring remediation if a work assessment has been completed. We understand there may be other buildings requiring remediation, and we are urgently requesting that buildings complete these work assessments. Should they determine work is required, future statistical releases will reflect that.</p><p>We expect developers to remediate the buildings for which they are contractually responsible as quickly as reasonably practicable, in line with the terms of the developer remediation contract. The time it may reasonably take to assess buildings will vary depending on factors including when third parties grant the developer access to the building and how the developer prioritises work to assess buildings across its portfolio, taking into account the relative safety risk likely to be associated with each building.</p><p>The department meets with developers regularly and closely monitors the performance of each developer against its contractual obligations, including progress on assessments. The developer remediation contract and the Government’s statutory Responsible Actors Scheme mean that developers face significant consequences if they fail to comply with their contractual obligations.</p>
answering member constituency North East Derbyshire more like this
answering member printed Lee Rowley more like this
grouped question UIN
26220 more like this
26221 more like this
question first answered
less than 2024-05-17T14:22:45.267Zmore like thismore than 2024-05-17T14:22:45.267Z
answering member
4652
label Biography information for Lee Rowley more like this
tabling member
4667
label Biography information for Mike Amesbury more like this
1717542
registered interest false more like this
date less than 2024-05-13more like thismore than 2024-05-13
answering body
Department for Levelling Up, Housing and Communities more like this
answering dept id 211 more like this
answering dept short name Levelling Up, Housing and Communities more like this
answering dept sort name Levelling Up, Housing and Communities more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Levelling Up, Housing and Communities, with reference to his Department's publication entitled Building Safety Remediation: monthly data release - March 2024, published on 18 April 2024, what is the target completion date for occupied buildings over 18 metres that have not had ACM cladding removed. more like this
tabling member constituency Weaver Vale more like this
tabling member printed
Mike Amesbury more like this
uin 25923 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-16more like thismore than 2024-05-16
answer text <p>The department will continue to pursue a range of initiatives to seek remediation at the earliest date. The Honourable Gentleman will be aware, from the document he quotes in his questions, that the length of time to conclude remediation will depend upon the number of responsible entities that start remediation in a timely manner and how many will need to be compelled to do so. The Government will continue to take action to make progress on remediation.</p> more like this
answering member constituency North East Derbyshire more like this
answering member printed Lee Rowley more like this
grouped question UIN
25924 more like this
25925 more like this
25926 more like this
question first answered
less than 2024-05-16T14:10:43.607Zmore like thismore than 2024-05-16T14:10:43.607Z
answering member
4652
label Biography information for Lee Rowley more like this
tabling member
4667
label Biography information for Mike Amesbury more like this
1717547
registered interest false more like this
date less than 2024-05-13more like thismore than 2024-05-13
answering body
Department for Levelling Up, Housing and Communities more like this
answering dept id 211 more like this
answering dept short name Levelling Up, Housing and Communities more like this
answering dept sort name Levelling Up, Housing and Communities more like this
hansard heading High Rise Flats: Insulation remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Levelling Up, Housing and Communities, with reference to his Department's web page entitled Building Safety Remediation data releases, updated on 18 April 2024, what his expected completion date is for the removal of cladding from the 28 occupied buildings over 18 metres with ACM cladding. more like this
tabling member constituency Weaver Vale more like this
tabling member printed
Mike Amesbury more like this
uin 25924 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-16more like thismore than 2024-05-16
answer text <p>The department will continue to pursue a range of initiatives to seek remediation at the earliest date. The Honourable Gentleman will be aware, from the document he quotes in his questions, that the length of time to conclude remediation will depend upon the number of responsible entities that start remediation in a timely manner and how many will need to be compelled to do so. The Government will continue to take action to make progress on remediation.</p> more like this
answering member constituency North East Derbyshire more like this
answering member printed Lee Rowley more like this
grouped question UIN
25923 more like this
25925 more like this
25926 more like this
question first answered
less than 2024-05-16T14:10:43.653Zmore like thismore than 2024-05-16T14:10:43.653Z
answering member
4652
label Biography information for Lee Rowley more like this
tabling member
4667
label Biography information for Mike Amesbury more like this