1348106
registered interest false more like this
date less than 2021-07-19more like thismore than 2021-07-19
answering body
Treasury more like this
answering dept id 14 more like this
answering dept short name Treasury more like this
answering dept sort name Treasury more like this
hansard heading Environmental Impact Assessment more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Chancellor of the Exchequer, with reference to the Annual Report on Major Projects 2020-21, published on 15 July 2021, what assessment he has made of the capability of his Department to manage the (a) scope, (b) time, (c) quality and (d) cost of its 36 category A projects. more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 35534 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-22more like thismore than 2021-07-22
answer text <p>The IPA has released a Deliverability Confidence Assessment (DCA) of GMPP projects in the Transparency document which accompanies the Annual Report. [1] (see deliverability assessment on column F). These represent the IPA’s evaluation of a project’s likelihood of achieving its aims and objectives, and doing so on time and on budget. Each DCA is followed by a departmental commentary that provides further explanation behind the GMPP projects’ rating.</p><p> </p><p><strong><strong>[1]</strong></strong> <a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">https</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">://</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">assets</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">.</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">publishing</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">.</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">service</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">.</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">gov</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">.</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">uk</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">/</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">government</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">/</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">uploads</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">/</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">system</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">/</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">uploads</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">/</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">attachment</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">_</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">data</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">/</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">file</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">/1002103/</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">GMPP</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">_</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">Government</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">_</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">Major</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">_</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">Projects</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">_</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">Portofolio</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">_</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">AR</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">_</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">Data</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">_</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">March</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">_2021.</a><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1002103/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.xls" target="_blank">xls</a></p>
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman more like this
question first answered
less than 2021-07-22T15:41:29.437Zmore like thismore than 2021-07-22T15:41:29.437Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter
1348144
registered interest false more like this
date less than 2021-07-19more like thismore than 2021-07-19
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence more like this
answering dept sort name Defence more like this
hansard heading Armed Forces: Housing more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, how many complaints from service personnel his Department received on (a) damp, (b) no hot water and (c) heating issues in 2020; and what the average time was to resolve those complaints. more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 35548 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-22more like thismore than 2021-07-22
answer text <p>The number of Stage 1 Complaints raised by Service personnel living in Service Family Accommodation (SFA) and Single Living Accommodation (SLA) for issues relating to damp, no hot water and heating during 2020 is set out below, together with the average time to resolve those complaints:</p><p> </p><p><strong>SFA</strong></p><table><tbody><tr><td><p><strong>Complaint Type</strong></p></td><td><p><strong>Number of Complaints</strong></p></td><td><p><strong>Duration of time to resolve complaint (average)</strong></p></td></tr><tr><td><p>Damp &amp; Mould</p></td><td><p>460</p></td><td><p>18.15 days</p></td></tr><tr><td><p>Hot Water</p></td><td><p>401</p></td><td><p>7.39 days</p></td></tr><tr><td><p>Heating</p></td><td><p>712</p></td><td><p>8.04 day</p></td></tr></tbody></table><p> </p><p><strong>SLA</strong></p><table><tbody><tr><td><p><strong>Complaint Type</strong></p></td><td><p><strong>Number of Complaints</strong></p></td><td><p><strong>Duration of time to resolve complaint (average)</strong></p></td></tr><tr><td><p>Damp &amp; Mould</p></td><td><p>0</p></td><td><p>0</p></td></tr><tr><td><p>Hot Water</p></td><td><p>2</p></td><td><p>19 days</p></td></tr><tr><td><p>Heating</p></td><td><p>0</p></td><td><p>0</p></td></tr></tbody></table><p> </p><p> </p><p> </p><p>A stage 1 complaint is raised when an occupant is dissatisfied with the service in response to a work task.</p><p> </p>
answering member constituency Horsham more like this
answering member printed Jeremy Quin more like this
question first answered
less than 2021-07-22T11:34:51.24Zmore like thismore than 2021-07-22T11:34:51.24Z
answering member
4507
label Biography information for Sir Jeremy Quin more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter
1348251
registered interest false more like this
date less than 2021-07-19more like thismore than 2021-07-19
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence more like this
answering dept sort name Defence more like this
hansard heading Ajax Vehicles: Testing more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, pursuant to the Answer of 19 July 2021 to Question 32308 on Ajax Vehicles: Testing, on which date that initial report was handed over to General Dynamics. more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 35552 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-22more like thismore than 2021-07-22
answer text <p>I will write to the right hon. Member with the requested information shortly.</p> more like this
answering member constituency Horsham more like this
answering member printed Jeremy Quin more like this
question first answered
less than 2021-07-22T16:31:24.397Zmore like thismore than 2021-07-22T16:31:24.397Z
answering member
4507
label Biography information for Sir Jeremy Quin more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter
1347698
registered interest false more like this
date less than 2021-07-16more like thismore than 2021-07-16
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence more like this
answering dept sort name Defence more like this
hansard heading F-35 Aircraft: Engines more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, how many (a) working and (b) complete F-35 engines does the Department own. more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 34463 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-21more like thismore than 2021-07-21
answer text <p>21 Pratt &amp; Whitney F135 engines are fitted in the UK's F-35 Lightning fleet, all of which are serviceable and in working order, with their legal title residing with the UK. The UK does not hold spare F135 engines. Instead, the engines and their modules are swapped out when they need changing or repairing as part of the F-35 Global Spares Pool.</p><p> </p> more like this
answering member constituency Horsham more like this
answering member printed Jeremy Quin more like this
question first answered
less than 2021-07-21T15:04:12.443Zmore like thismore than 2021-07-21T15:04:12.443Z
answering member
4507
label Biography information for Sir Jeremy Quin more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter
1347714
registered interest false more like this
date less than 2021-07-16more like thismore than 2021-07-16
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence more like this
answering dept sort name Defence more like this
hansard heading Defence: Procurement more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, whether it is his policy for the prime contractor to calculate the ROM costs for a defence programme. more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 34464 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-21more like thismore than 2021-07-21
answer text <p>When the Ministry of Defence is estimating the potential cost of a programme, officials may engage with industry, before the selection of a prime contractor, to establish an initial view of cost in the form of a ROM (Rough Order of Magnitude) cost. However, this will only be a guide and at all times it remains the Department's assessment, not that of industry. As programmes mature, requirements, opportunities and risks become progressively better understood and refined, as do likely costs.</p> more like this
answering member constituency Horsham more like this
answering member printed Jeremy Quin more like this
question first answered
less than 2021-07-21T15:05:59.89Zmore like thismore than 2021-07-21T15:05:59.89Z
answering member
4507
label Biography information for Sir Jeremy Quin more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter
1346731
registered interest false more like this
date less than 2021-07-14more like thismore than 2021-07-14
answering body
Department for International Trade more like this
answering dept id 202 more like this
answering dept short name International Trade more like this
answering dept sort name International Trade more like this
hansard heading Government Procurement Agreement: Shipbuilding more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for International Trade, whether the Government's accession to the WTO's Agreement on Government Procurement includes an exemption to UK shipbuilding. more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 33133 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-19more like thismore than 2021-07-19
answer text <p>The procurement of ships, boats and floating structures is covered under Annex 4 of the UK’s schedules of the World Trade Organization's Agreement on Government Procurement. This is provided no other exceptions apply.</p> more like this
answering member constituency Chelsea and Fulham more like this
answering member printed Greg Hands more like this
question first answered
less than 2021-07-19T11:58:00.293Zmore like thismore than 2021-07-19T11:58:00.293Z
answering member
1526
label Biography information for Greg Hands more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter
1346732
registered interest false more like this
date less than 2021-07-14more like thismore than 2021-07-14
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence more like this
answering dept sort name Defence more like this
hansard heading National Flagship: Procurement more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, what assessment his Department has made of the categorisation of the National Flagship as a (a) non-sensitive and (b) non-warlike material in respect of the UK's responsibility to the Agreement on Government Procurement . more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 33134 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-23more like thismore than 2021-07-23
answer text <p>Construction of the National Flagship will be limited to the UK in order to protect the essential interests of national security. The procurement of the Flagship will be compliant with the UK's obligations under the WTO Government Procurement Agreement.</p> more like this
answering member constituency Wyre and Preston North more like this
answering member printed Mr Ben Wallace more like this
grouped question UIN 33135 more like this
question first answered
less than 2021-07-23T12:04:38.697Zmore like thismore than 2021-07-23T12:04:38.697Z
answering member
1539
label Biography information for Mr Ben Wallace more like this
previous answer version
15264
answering member constituency Wyre and Preston North more like this
answering member printed Mr Ben Wallace more like this
answering member
1539
label Biography information for Mr Ben Wallace more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter
1346905
registered interest false more like this
date less than 2021-07-14more like thismore than 2021-07-14
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence more like this
answering dept sort name Defence more like this
hansard heading F-35 Aircraft: Guided Weapons more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, what estimate his Department has made of the cost of integrating a (a) ASRAAM, (b) Paveway IV guided bomb and (c) SPEAR 3 long-range precision weapon onto the F-35B Lightning II. more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 33136 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-19more like thismore than 2021-07-19
answer text <p>The estimated costs of integrating ASRAAM, Paveway IV and SPEAR Cap 3 weapons onto the F-35 Lightning are as follows: ASRAAM: £47 million, Paveway IV: £103 million, SPEAR Cap 3: £170 million.</p> more like this
answering member constituency Horsham more like this
answering member printed Jeremy Quin more like this
question first answered
less than 2021-07-19T15:11:20.037Zmore like thismore than 2021-07-19T15:11:20.037Z
answering member
4507
label Biography information for Sir Jeremy Quin more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter
1346245
registered interest false more like this
date less than 2021-07-13more like thismore than 2021-07-13
answering body
Treasury more like this
answering dept id 14 more like this
answering dept short name Treasury more like this
answering dept sort name Treasury more like this
hansard heading Tom Cooper more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Chancellor of the Exchequer, whether UK Government Investment pays UKGI director Mr Thomas Cooper’s salary through his firm TKGC Consulting. more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 32304 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-19more like thismore than 2021-07-19
answer text <p>All UKGI employees are remunerated directly and not via any external firm.</p> more like this
answering member constituency Salisbury more like this
answering member printed John Glen more like this
question first answered
less than 2021-07-19T08:29:04.543Zmore like thismore than 2021-07-19T08:29:04.543Z
answering member
4051
label Biography information for John Glen more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter
1346249
registered interest false more like this
date less than 2021-07-13more like thismore than 2021-07-13
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence more like this
answering dept sort name Defence more like this
hansard heading Ajax Vehicles: Testing more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, whether the Institute for Naval Medicine's report commissioned in May 2020 on the AJAX armoured fighting vehicle has been made available to General Dynamics. more like this
tabling member constituency North Durham more like this
tabling member printed
Mr Kevan Jones more like this
uin 32306 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2021-07-19more like thismore than 2021-07-19
answer text <p>The Institute of Naval Medicine's final report was shared with General Dynamics on 16 December 2020, having been received by Defence Equipment &amp; Support on 10 December 2020.</p> more like this
answering member constituency Horsham more like this
answering member printed Jeremy Quin more like this
question first answered
less than 2021-07-19T10:55:19.74Zmore like thismore than 2021-07-19T10:55:19.74Z
answering member
4507
label Biography information for Sir Jeremy Quin more like this
tabling member
1438
label Biography information for Mr Kevan Jones remove filter