<p>Three planning applications were submitted for onshore wind farms in Lancashire
between October 2015 and October 2018 according to the Renewable Energy Planning Database
(REPD):</p><p> </p><p><strong>Table 1: Planning applications for onshore wind farms
in Lancashire submitted between October 2015 and October 2017</strong></p><table><tbody><tr><td><p>Site
name</p></td><td><p>Installed capacity (MW)</p></td><td><p>Planning application submitted</p></td><td><p>Status</p></td></tr><tr><td><p>Lower
Alt Wind Farm</p></td><td><p>42</p></td><td><p>14/12/2015</p></td><td><p>Application
Refused</p></td></tr><tr><td><p>Hameldon Hill Wind Farm</p></td><td><p>7.1</p></td><td><p>13/06/2016</p></td><td><p>Awaiting
Construction</p></td></tr><tr><td><p>Hoddlesdon Moss (Resubmission)</p></td><td><p>2.7</p></td><td><p>29/06/2016</p></td><td><p>Application
Withdrawn</p></td></tr></tbody></table><p> </p><p>The REPD tracks applications for
renewable energy projects as they move through the planning system. It shows projects
that have applied for planning permission in the previous month or earlier for projects
with a capacity greater than, or equal to, 1MW. The REPD does not differentiate between
projects that are community and industry-led.</p><p> </p><p>Community benefits are
a matter to be agreed between a project developer and the local community, and are
not material considerations in any planning decision.</p>
|
|