Linked Data API

Show Search Form

Search Results

1007003
registered interest false more like this
date remove filter
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Fracking: Lancashire more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, how many earthquakes have been recorded at the Preston New Road site since Cuadrilla started fracking at that location. more like this
tabling member constituency Sheffield, Heeley more like this
tabling member printed
Louise Haigh remove filter
uin 191456 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-11-21more like thismore than 2018-11-21
answer text <p>The British Geological Survey (BGS) is recording seismicity in the Fylde and as of 15 November it has reported 36 minor seismic events since operations began, all but four of these were below the 0.5 magnitude threshold which requires Cuadrilla to pause operations for a minimum of 18 hours.</p><p> </p><p>The BGS has a greater quantity of specialist equipment in the Fylde than anywhere else in the UK which is why a high proportion of minor seismic events are being published on their site which are not reported elsewhere in the country.</p> more like this
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
question first answered
less than 2018-11-21T17:16:36.007Zmore like thismore than 2018-11-21T17:16:36.007Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
4473
label Biography information for Louise Haigh more like this
1007005
registered interest false more like this
date remove filter
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Fracking: Lancashire more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, whether Cuadrilla has complied with the 18 hour waiting time after every recorded earthquake on the Preston New Road site. more like this
tabling member constituency Sheffield, Heeley more like this
tabling member printed
Louise Haigh remove filter
uin 191457 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-11-21more like thismore than 2018-11-21
answer text <p>The Oil and Gas Authority have confirmed that Cuadrilla have paused hydraulic fracturing operations for a minimum of 18 hours following a seismic event of 0.5 magnitude or above, as is required in the strict controls in the Hydraulic Fracture Plan.</p> more like this
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
question first answered
less than 2018-11-21T17:17:14.763Zmore like thismore than 2018-11-21T17:17:14.763Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
4473
label Biography information for Louise Haigh more like this