answer text |
<p>The latest information on number of dwellings in social sector high-rise residential
buildings with Aluminium Composite Material cladding systems unlikely to meet Building
Regulations that are yet to be remediated were published in the <a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/800508/Building_Safety_Data_Release_-_April_2019.pdf"
target="_blank">April Building Safety Programme Data Release</a> on 9 May 2019.</p><p>Our
ongoing quality checks have identified an error in the figure published in the April
Data Release. This has now been corrected in the published Data Release in line with
our published Revisions Policy.</p><p>The updated figure from 30 April 2019 is that
approximately 8,400 dwellings in 108 social sector high-rise residential buildings
with Aluminium Composite Material cladding systems unlikely to meet Building Regulations
are yet to be remediated.</p><p>The regional breakdown is in the table below:</p><table><tbody><tr><td><p><strong>Region</strong></p></td><td><p><strong>Number
of dwellings</strong></p></td></tr><tr><td><p>London</p></td><td><p>4,600</p></td></tr><tr><td><p>North
West</p></td><td><p>2,500</p></td></tr><tr><td><p>South East</p></td><td><p>400</p></td></tr><tr><td><p>South
West</p></td><td><p>300</p></td></tr><tr><td><p>North East</p></td><td><p>200</p></td></tr><tr><td><p>East
of England</p></td><td><p>200</p></td></tr><tr><td><p>Yorkshire and The Humber</p></td><td><p>100</p></td></tr><tr><td><p><strong>Total</strong></p></td><td><p>8,400</p></td></tr></tbody></table><p>The
figures in this table have been rounded to the nearest 100 independently which explains
why the sum of the rows does not equal the total.</p>
|
|