Linked Data API

Show Search Form

Search Results

1717006
registered interest false more like this
date less than 2024-05-09more like thismore than 2024-05-09
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Electric Bicycles: Accidents more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government whether they plan to introduce legislation so that cyclists can be charged for causing death by dangerous or reckless riding if they cause a death while riding an e-bike which has exceeded 15.5 miles per hour. more like this
tabling member printed
Lord Blencathra more like this
uin HL4501 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-22more like thismore than 2024-05-22
answer text <p>E-bikes that do not comply with the Electrically Pedal Assisted Cycles regulations, which includes a requirement for power assist to cut off at 15.5 miles per hour, are classed as mechanically propelled vehicles. As such, someone causing death by recklessly riding one would already be subject to a charge of death by dangerous driving.</p> more like this
answering member printed Lord Davies of Gower more like this
question first answered
less than 2024-05-22T11:14:03.443Zmore like thismore than 2024-05-22T11:14:03.443Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this
1716638
registered interest false more like this
date less than 2024-05-08more like thismore than 2024-05-08
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Electric Bicycles: Sales more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government whether they plan to ban the sale of e-bikes which are capable of being converted to speeds exceeding 15.5 miles per hour, and the associated batteries. more like this
tabling member printed
Lord Blencathra more like this
uin HL4443 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-22more like thismore than 2024-05-22
answer text <p>It is potentially possible to convert the vast majority of pedal cycles into e-bikes capable of exceeding 15.5mile per hour.</p><p> </p><p>Batteries can be used for a wide range of purposes and it would not be practically possible to differentiate those used in e-bikes from those used for other uses.</p><p> </p> more like this
answering member printed Lord Davies of Gower more like this
question first answered
less than 2024-05-22T11:52:15.643Zmore like thismore than 2024-05-22T11:52:15.643Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this
1715930
registered interest false more like this
date less than 2024-05-07more like thismore than 2024-05-07
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Network Rail: Roads more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government for each of the past five years, how much money has been spent by Network Rail on footpaths and roads next to railway lines for use by rail staff and workers, and how many miles have been completed. more like this
tabling member printed
Lord Blencathra more like this
uin HL4380 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-16more like thismore than 2024-05-16
answer text <p>Network Rail does not have a complete inventory of constructed pathways on its infrastructure. Network Rail is looking to tender a piece of work to use satellite imagery to identify the constructed pathways adjacent to the running railway.</p> more like this
answering member printed Lord Davies of Gower more like this
question first answered
less than 2024-05-16T15:42:49.17Zmore like thismore than 2024-05-16T15:42:49.17Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this
1715931
registered interest false more like this
date less than 2024-05-07more like thismore than 2024-05-07
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Railway Stations: Access more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government what plans if any they have to provide level access on to trains by (1) lowering the track bed, (2) raising platforms, or (3) purchasing trains with a lower central section between the wheel bogies; and if not, why none of these options is acceptable. more like this
tabling member printed
Lord Blencathra more like this
uin HL4381 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-16more like thismore than 2024-05-16
answer text <p>The Government appreciates how frustrating the issue of the difference in platform-to-train gap can be for passengers with disabilities and we remain committed to ensuring that all passengers have the same opportunities to travel on the rail network.</p><p>Gaps can vary at stations across the network, due to both the design of the station and the platforms at the time of construction, sometimes more than a hundred years ago. It also has to vary according to the type of services which use the line, for example, high-speed, commuter and freight trains.</p><p>The rail industry takes several approaches to improving the stepping distance between platform and train, for example the Department for Transport has funded a number of raised sections of platforms across the country to provide level boarding on to trains e.g. Harrington, Whaley Bridge and Ty Croes. However, these may not be suitable for all locations.</p><p>There are also 378 carriages forming 58 trains currently in service with Greater Anglia that have lower floor sections with in-built ramps. Under delivery are a further 133 carriages forming 35 trains for Transport for Wales and 208 carriages forming 54 trains for Merseyrail, all of which have in-built ramps.</p>
answering member printed Lord Davies of Gower more like this
question first answered
less than 2024-05-16T15:41:47.38Zmore like thismore than 2024-05-16T15:41:47.38Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this
1715932
registered interest false more like this
date less than 2024-05-07more like thismore than 2024-05-07
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Railways: Waste more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government what is the amount, to the nearest one million tons, of (1) steel railway lines, (2) sacks of rubble, and (3) concrete sleepers and other concrete items, which are unused and lying on or beside railway lines or in sidings; what estimate they have made of the number of railway items littering railway property; and what plans Network Rail have to remove, sell or dispose of these items. more like this
tabling member printed
Lord Blencathra more like this
uin HL4382 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-16more like thismore than 2024-05-16
answer text <p>Network Rail needs to keep a supply of strategically placed rail on the network for track renewal and replacement, but it is also committed to removing excess scrap material from lineside, when commercially viable, to make the railway safer, higher performing and less visually impactful to customers and neighbours. Once routes have identified material for collection, it can either be recycled or reused on the infrastructure through three material handling depots, or it can be sold to wider markets.</p><p> </p><p>Network Rail presently does not hold information on the amounts of these lineside materials.</p><p> </p> more like this
answering member printed Lord Davies of Gower more like this
question first answered
less than 2024-05-16T15:59:41.727Zmore like thismore than 2024-05-16T15:59:41.727Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this
1715933
registered interest false more like this
date less than 2024-05-07more like thismore than 2024-05-07
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Electric Bicycles: Pedestrian Areas more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government how many disabled people have been injured by electric bikes being used or left on the pavement, in each of the past five years for which figures are available. more like this
tabling member printed
Lord Blencathra more like this
uin HL4383 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-21more like thismore than 2024-05-21
answer text <p>The information requested is not held by the Department.</p> more like this
answering member printed Lord Davies of Gower more like this
question first answered
less than 2024-05-21T15:33:32.563Zmore like thismore than 2024-05-21T15:33:32.563Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this
1715934
registered interest false more like this
date less than 2024-05-07more like thismore than 2024-05-07
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Avanti West Coast: Standards more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government what assessment they have made of any correlation between (1) Avanti trains being awarded a performance bonus, and (2) subsequent train cancellations by Avanti. more like this
tabling member printed
Lord Blencathra more like this
uin HL4384 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-16more like thismore than 2024-05-16
answer text <p>As part of National Rail Contracts, operators must meet challenging operational targets to earn performance-based fees. If performance falls below a pre-determined level, the Department can intervene to act in passengers’ best interests.</p><p> </p><p>Officials continue to closely monitor and review Avanti West Coast’s (AWC) progress to a sustained recovery, restoring services reliably on the West Coast and delivering good value for the taxpayer. The Department will hold AWC responsible for matters within its control.</p><p> </p><p>To date, AWC has not received operational performance fees related to periods since the commencement of its National Rail Contract on 15 October 2023.</p> more like this
answering member printed Lord Davies of Gower more like this
question first answered
less than 2024-05-16T15:46:15.737Zmore like thismore than 2024-05-16T15:46:15.737Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this
1715695
registered interest false more like this
date less than 2024-05-02more like thismore than 2024-05-02
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Crewe Station more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government what is the reason for removing the roof at Crewe Station and when they expect it to be reroofed, if at all. more like this
tabling member printed
Lord Blencathra more like this
uin HL4323 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-05-16more like thismore than 2024-05-16
answer text <p>The canopies and main trainshed roof have limited asset remaining life and Network Rail expects replacement work to be complete by 2029. The Government has provided £44.1 billion to Network Rail for renewals work during this Control Period (2024-29) which will be used to fund the work.</p> more like this
answering member printed Lord Davies of Gower more like this
question first answered
less than 2024-05-16T15:22:50.293Zmore like thismore than 2024-05-16T15:22:50.293Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this
1674510
registered interest false more like this
date less than 2023-11-30more like thismore than 2023-11-30
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Avanti West Coast: Catering more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government, further to the Written Answer by Baroness Vere of Norbiton on 27 September (HL10350), what text is included in Avanti's National Rail Contract on the provision of catering in first class. more like this
tabling member printed
Lord Blencathra more like this
uin HL755 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2023-12-06more like thismore than 2023-12-06
answer text <p>The provision of First-Class Catering is included in the Continuing Ancillary Services Document which sets out services that are required to be carried over from the previous Franchise Agreement. Clause 4.5 of the National Rail Contract states that the operator shall continue to provide any Continuing Ancillary Service and not vary the terms or stop providing without the Secretary of State’s prior approval.</p> more like this
answering member printed Lord Davies of Gower more like this
question first answered
less than 2023-12-06T15:46:14.093Zmore like thismore than 2023-12-06T15:46:14.093Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this
1672979
registered interest false more like this
date less than 2023-11-27more like thismore than 2023-11-27
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport remove filter
answering dept sort name Transport more like this
hansard heading Euston Station: Disability more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask His Majesty's Government, further to the Written Answer by Lord Davies of Gower on 27 November (HL339), why the steel sidebars on the disability buggies at Euston station were replaced in the last two weeks; what was the cost of installing the original ones and replacing them with the new ones; and who was responsible for making the decision on both sets of bars. more like this
tabling member printed
Lord Blencathra more like this
uin HL585 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2023-12-06more like thismore than 2023-12-06
answer text <p>Following an incident involving a passenger on one of the buggies at Euston Station, Network Rail undertook a safety investigation. One of the outputs from the investigation was to ensure safety bars were present on all buggies. Network Rail found that the design of the bars caused issues for some passengers getting on and off the buggies. Therefore, Network Rail replaced them with the newly designed safety bars which allows more of the bar to be pushed back into its housing, resulting in more space for passengers to get on and off.</p><p> </p><p>The cost of installing the original bars and then replacing them with the new bars was £2617.20 excluding VAT. The decision for the bars to be replaced was made by the Route’s Head of Stations.</p> more like this
answering member printed Lord Davies of Gower more like this
question first answered
less than 2023-12-06T12:49:33.15Zmore like thismore than 2023-12-06T12:49:33.15Z
answering member
4499
label Biography information for Lord Davies of Gower more like this
tabling member
497
label Biography information for Lord Blencathra more like this