answer text |
<p> </p><p>Data for 2013 are not yet available; the remainder of this answer refers
to 2012 data.</p><p> </p><p> </p><p> </p><p>A table providing the 2012 estimated pedal
cycle annual average daily flow (AADF) for the road link covering the Rotherhithe
tunnel (for both directions combined) is shown in the table below:</p><p> </p><p>
</p><p> </p><table><tbody><tr><td><p><strong>2012 AADF</strong></p></td><td><p><strong>Pedal
Cycles</strong></p></td></tr><tr><td><p>Rotherhithe Tunnel</p></td><td><p>239</p></td></tr></tbody></table><p>
</p><p> </p><p> </p><p>This figure gives an estimate of the number of pedal cycles
travelling along the individual section of road on an average day of the year.</p><p>
</p><p> </p><p> </p><p>To calculate an estimate of the annual pedal cycle usage of
the tunnel (for both directions combined); this daily AADF estimate would be multiplied
by the 365 days in a year.</p><p> </p><p> </p><p> </p><p>AADF data for individual
motorway and ‘A' road links for 2000 – 2012 are available on our website, here: </p><p>
</p><p><a href="http://data.gov.uk/dataset/gb-road-traffic-counts" target="_blank">http://data.gov.uk/dataset/gb-road-traffic-counts</a></p><p>
</p><p> </p><p> </p>
|
|