Linked Data API

Show Search Form

Search Results

100129
registered interest false more like this
date remove filter
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence remove filter
answering dept sort name Defence more like this
hansard heading Tornado Aircraft more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, whether aircraft from the recently retired Tornado squadrons (a) have been put in storage, (b) destroyed and (c) used for cannibalisation. more like this
tabling member constituency Moray more like this
tabling member printed
Angus Robertson more like this
uin 211341 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2014-10-28more like thismore than 2014-10-28
answer text <p>As part of the phased reduction of the RAF’s Tornado GR4 fleet, aircraft allocated to disbanded squadrons are assessed against a range of criteria including flying hour life consumed, embodied capabilities and future maintenance requirements. Depending on the result of this assessment, aircraft are reallocated to Front Line squadrons, returned to BAE Systems for maintenance or upgrade, placed in storage for future use or selected for spares recovery. Components and equipment for which no further beneficial use can be identified are disposed of through normal channels.</p><p> </p> more like this
answering member constituency Ludlow more like this
answering member printed Mr Philip Dunne more like this
question first answered
less than 2014-10-28T16:43:54.0094572Zmore like thismore than 2014-10-28T16:43:54.0094572Z
answering member
1542
label Biography information for Philip Dunne more like this
tabling member
1433
label Biography information for Angus Robertson more like this
100130
registered interest false more like this
date remove filter
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence remove filter
answering dept sort name Defence more like this
hansard heading Typhoon Aircraft more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, when the MBDA Brimstone 2 missile will be ready for operational use on Typhoon aircraft; and whether this missile will be usable on all variants of the aircraft. more like this
tabling member constituency Moray more like this
tabling member printed
Angus Robertson more like this
uin 211340 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2014-10-28more like thismore than 2014-10-28
answer text <p>Work is under way to ensure the integration of Brimstone 2 on to Typhoon aircraft. On 2 June 2014, BAE Systems was awarded a contract to undertake a risk reduction study in support of a planned Main Gate business decision in early 2015. No decision has yet been taken on those variants to which Brimstone will be fitted.</p> more like this
answering member constituency Ludlow more like this
answering member printed Mr Philip Dunne more like this
question first answered
less than 2014-10-28T16:57:29.3365884Zmore like thismore than 2014-10-28T16:57:29.3365884Z
answering member
1542
label Biography information for Philip Dunne more like this
tabling member
1433
label Biography information for Angus Robertson more like this
100131
registered interest false more like this
date remove filter
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence remove filter
answering dept sort name Defence more like this
hansard heading Military Aircraft more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, what estimate he has made of the annual combined operating and support cost for one F-35 and one Typhoon aircraft. more like this
tabling member constituency Moray more like this
tabling member printed
Angus Robertson more like this
uin 211343 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2014-10-28more like thismore than 2014-10-28
answer text <p>The information is not held in the format requested as aircraft operating and support costs are calculated on the whole fleet rather than per aircraft, in order to achieve efficiencies of scale. <br><br>While data continues to mature on the F-35 programme, it is too early to provide future UK operating and support cost estimates.</p> more like this
answering member constituency Ludlow more like this
answering member printed Mr Philip Dunne more like this
question first answered
less than 2014-10-28T16:43:16.0056634Zmore like thismore than 2014-10-28T16:43:16.0056634Z
answering member
1542
label Biography information for Philip Dunne more like this
tabling member
1433
label Biography information for Angus Robertson more like this
100133
registered interest false more like this
date remove filter
answering body
Ministry of Defence more like this
answering dept id 11 more like this
answering dept short name Defence remove filter
answering dept sort name Defence more like this
hansard heading Unmanned Air Vehicles more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Defence, what the unit cost is of the (a) Hermes 450 Unmanned Aerial Vehicle and (b) Watchkeeper Unmanned Aerial Vehicle. more like this
tabling member constituency Moray more like this
tabling member printed
Angus Robertson more like this
uin 211342 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2014-10-28more like thismore than 2014-10-28
answer text <p>The Hermes 450 Unmanned Air System was procured by the Ministry of Defence from Thales UK as a service provision in response to an Urgent Operational Requirement. The Department has therefore never owned the equipment and does not have access to the unit cost. <br><br>Watchkeeper is a system delivering an Intelligence, Surveillance and Reconnaissance capability and comprising a number of elements including air vehicles, ground control stations, data terminals, ground equipment and sensors, as well as infrastructure and training facilities. Delivery of the complete Watchkeeper system is enabled by the Demonstration, Manufacture and In-Service Support contract with the prime contractor, Thales UK. As a contract for delivering the entire system, it does not lend itself to the individual identification of the unit cost of a Watchkeeper aircraft.</p> more like this
answering member constituency Ludlow more like this
answering member printed Mr Philip Dunne more like this
question first answered
less than 2014-10-28T16:54:53.2201268Zmore like thismore than 2014-10-28T16:54:53.2201268Z
answering member
1542
label Biography information for Philip Dunne more like this
tabling member
1433
label Biography information for Angus Robertson more like this