1145454
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Housing: Insulation more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, whether there is a requirement that insulation installed under the Energy Company Obligation scheme be of limited combustibility. more like this
tabling member constituency Croydon North more like this
tabling member printed
Mr Steve Reed more like this
uin 290347 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-09-30more like thismore than 2019-09-30
answer text <p>As with any building refurbishment, for insulation delivered under energy efficiency schemes, including ECO, it is the responsibility of anyone carrying out building work to ensure compliance with the 2010 Building Regulations. Approved Document B volume 1: Dwellings (2019 edition) on fire safety covers, among other matters, fire spread. Local Authorities are responsible for enforcement.</p> more like this
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
question first answered
less than 2019-09-30T15:37:31.267Zmore like thismore than 2019-09-30T15:37:31.267Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4268
label Biography information for Steve Reed more like this
1145460
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Housing: Insulation more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, whether there was a requirement that any insulation installed under the now closed (a) Carbon Emissions Reduction Target and (b) Community Energy Saving Programme schemes be of limited combustibility. more like this
tabling member constituency Croydon North more like this
tabling member printed
Mr Steve Reed more like this
uin 290348 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-09-30more like thismore than 2019-09-30
answer text <p>The Carbon Emissions Reduction Target (CERT) began in April 2008, and the Community Energy Saving Programme (CESP) was introduced in October 2009. Both schemes ended in December 2012.</p><p> </p><p>As with any building refurbishment, regardless of whether it was delivered under CERT or CESP, it is the responsibility of anyone carrying out building work to ensure compliance with the latest Building Regulations. Approved Document B (2006 edition incorporating 2010 and 2013 amendments) on fire safety covers, among other matters, fire spread. Local Authorities are responsible for enforcement.</p> more like this
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
question first answered
less than 2019-09-30T15:37:39.157Zmore like thismore than 2019-09-30T15:37:39.157Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4268
label Biography information for Steve Reed more like this
1145472
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Department for Business, Energy and Industrial Strategy: Energy Supply more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, which provider supplies energy to her Department; how much CO2 was emitted through her Department’s energy consumption in the latest period for which figures are available; whether the criteria her Department uses to select an energy supplier includes how environmentally friendly the supplier is; and what recent steps her Department has taken to reduce CO2 emissions from its energy use. more like this
tabling member constituency Scunthorpe more like this
tabling member printed
Nic Dakin more like this
uin 290324 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>I am responding in relation the Departmental headquarters building at 1 Victoria Street, London SW1H 0ET, where most staff are based.</p><p>Energy is supplied by Corona (gas) and EDF (electricity), and the total carbon emissions for 2018/19 was 2607.31 tonnes of CO2e. The Department does not hold the figure for how much of this specifically relates to energy consumption.</p><p>The Department uses the Crown Commercial Services energy frameworks for the supply of utilities, which can be used to secure the supply of energy from renewable resources. The Department is committed to reducing the impact of its operations on the environment and achieving net zero emissions by 2025, which is why from 1 October 2019, electricity will be supplied solely from renewable resources. In addition, work is already underway to source the gas supply solely from renewable resources.</p><p>The Department has established a cross-departmental programme of measures to achieve its net zero emissions commitment, including measures to increase energy efficiency, such as: replacing all lighting with LED bulbs managed by presence and daylight-saving monitors; and the installation of a fully automated energy management system.</p>
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
question first answered
less than 2019-10-01T15:21:55.233Zmore like thismore than 2019-10-01T15:21:55.233Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4056
label Biography information for Nic Dakin more like this
1145530
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Oil more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what assessment she has made of the effect on the energy supply of the downgrade in the forecast for oil demand growth in 2019. more like this
tabling member constituency Morley and Outwood more like this
tabling member printed
Andrea Jenkyns more like this
uin 290430 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Indigenous oil production was equivalent to around 70 percent of the UK’s oil demand in 2018 and plays an important role in meeting our energy needs. The UK also benefits from diverse sources of supply through access to a global market for crude oil and refined oil products. Growth in global oil demand is expected to be lower than originally forecast for 2019, helping to ensure there are healthy levels of global oil stocks and resilience to global oil supply disruptions.</p> more like this
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
question first answered
less than 2019-10-01T15:20:23.427Zmore like thismore than 2019-10-01T15:20:23.427Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4490
label Biography information for Dame Andrea Jenkyns more like this
1145547
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Chippenham Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Chippenham Natural Gas Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290403 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
grouped question UIN
290404 more like this
290405 more like this
290406 more like this
290407 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.427Zmore like thismore than 2019-10-01T15:27:47.427Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145548
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading West Burton Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of West Burton GT Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290404 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
grouped question UIN
290403 more like this
290405 more like this
290406 more like this
290407 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.497Zmore like thismore than 2019-10-01T15:27:47.497Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145549
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Cottam Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) decommissioning date is of Cottam Coal Power Station; and what plans are in place to replace that capacity when the power station is decommissioned. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290405 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
grouped question UIN
290403 more like this
290404 more like this
290406 more like this
290407 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.577Zmore like thismore than 2019-10-01T15:27:47.577Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145550
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Didcot B Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Didcot GT Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290406 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
grouped question UIN
290403 more like this
290404 more like this
290405 more like this
290407 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.64Zmore like thismore than 2019-10-01T15:27:47.64Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145551
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Little Barford Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Little Barford GT Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290407 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
grouped question UIN
290403 more like this
290404 more like this
290405 more like this
290406 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.717Zmore like thismore than 2019-10-01T15:27:47.717Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145553
registered interest false more like this
date remove maximum value filtermore like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Loch Carnan Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Loch Carnan, South Uist Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290408 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne more like this
answering member printed Kwasi Kwarteng remove filter
grouped question UIN
290403 more like this
290404 more like this
290405 more like this
290406 more like this
290407 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.797Zmore like thismore than 2019-10-01T15:27:47.797Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this