Linked Data API

Show Search Form

Search Results

1050111
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Motor Vehicles: Exhaust Emissions more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what plans he has in place to ensure that Highways England takes steps to reduce levels of nitrogen dioxide on the strategic road network which exceed statutory limits. more like this
tabling member constituency Workington more like this
tabling member printed
Sue Hayman more like this
uin 213392 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2019-01-31more like thismore than 2019-01-31
answer text <p>The Government’s plans are set out in the 2017 Air Quality Strategy and Highways England are working to deliver compliance with air quality limits in the shortest possible time. Specifically, Highways England are taking a number of steps to improve air quality on the roads they manage and are working with local authorities to reduce NO2 on their roads. This activity is supported by the £100m Air Quality Designated Fund.</p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman remove filter
question first answered
less than 2019-01-31T09:02:10.047Zmore like thismore than 2019-01-31T09:02:10.047Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
4395
label Biography information for Baroness Hayman of Ullock more like this
1050112
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Motor Vehicles: Exhaust Emissions more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps Highways England is taking to reduce levels of nitrogen dioxide on the strategic road network which exceed statutory limits. more like this
tabling member constituency Workington more like this
tabling member printed
Sue Hayman more like this
uin 213393 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2019-01-31more like thismore than 2019-01-31
answer text <p>Highways England are supporting the uptake of electric vehicles by working to ensure that 95 per cent of the strategic road network will have a chargepoint every 20 miles.</p><p>Highways England have also been exploring and testing a range of measures and innovative products as part of their programme of air quality research. They have evidence that tall barriers can reduce concentrations of NO2 for the residents closest nearby, and they are progressing with work to see how these could be installed on the network. This work is underpinned by their £100m Air Quality Designated Fund.</p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman remove filter
question first answered
less than 2019-01-31T13:12:24.923Zmore like thismore than 2019-01-31T13:12:24.923Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
4395
label Biography information for Baroness Hayman of Ullock more like this
1050262
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Road Traffic Control: West Sussex more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of Secretary of State for Transport, pursuant to the Answer of 17 January 2019 to Question 206710 on Road Traffic Control: West Sussex, for what reason Highways England did not undertake a (a) Walking, Cycling and Horse-riding assessment during the options and concept stages of the scheme's development and (b) Review report at the conclusion of the preliminary design stage, in accordance with the Design Manual for Roads and Bridges. more like this
tabling member constituency East Worthing and Shoreham more like this
tabling member printed
Tim Loughton more like this
uin 213149 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2019-01-31more like thismore than 2019-01-31
answer text <p>A Walking, Cycling and Horse Riding Assessment is carried out by the relevant design team, not Highways England. In this case, we understand that the options and concept stages of the scheme began in the autumn of 2016 before the publication of the Walking, Cycling and Horse Riding Assessment and were subject to the applicable standard on Non-Motorised User Audits. The Transport Assessment accompanying the planning application provided information satisfying the criteria for a non-motorised user context report.</p><p>A Review Report is required at the end of the preliminary design stage and before commencement of detailed design followed by a further Review Report at the end of the detailed design phase and before construction commences. The design team is now at the end of the preliminary design stage, but detailed design has not yet begun. A Review Report is now due and will be completed before the commencement of detailed design.</p><p>The preliminary design improved pedestrian, cycle and equestrian access in the vicinity of the South Downs National Park, and further opportunities for improvement may be identified through a forthcoming Walking, Cycling and Horse Riding Review. The preliminary design was also compliant with Highways England’s design standards for cycle provision. Any non-compliance identified during detailed design will be removed or be subject to the process of assessment whether there may be grounds for a specific variation.</p>
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman remove filter
grouped question UIN
213150 more like this
213152 more like this
question first answered
less than 2019-01-31T13:22:59.02Zmore like thismore than 2019-01-31T13:22:59.02Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
114
label Biography information for Tim Loughton more like this
1050263
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Fuels more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps his Department has taken to increase the use of carbon neutral fuel through captured C02. more like this
tabling member constituency Romford more like this
tabling member printed
Andrew Rosindell more like this
uin 213259 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2019-02-04more like thismore than 2019-02-04
answer text <p>In 2018 the Government amended the Renewable Transport Fuel Obligation so that transport fuels made using waste CO<sub>2</sub> are eligible for reward, provided that sustainability and eligibility requirements are met. Those requirements include that all the input process energy used to make the fuel is from renewable sources, and that the fuel delivers significant reductions in greenhouse gas emissions. Additionally, the Department’s Future Fuels for Flight and Freight Competition (F4C) makes up to £20m of capital funding available to projects that will produce low carbon waste-based fuels for use in planes and lorries.</p><p> </p><p>Projects capable of producing fuels using waste CO<sub>2</sub> were eligible to apply for F4C funding.</p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman remove filter
question first answered
less than 2019-02-04T16:32:22.77Zmore like thismore than 2019-02-04T16:32:22.77Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1447
label Biography information for Andrew Rosindell more like this
1050266
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Road Traffic Control: West Sussex more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, pursuant to the Answer of 17 January 2019 to Question 20610 on Road Traffic Control: West Sussex, what criteria Highways England used to support the scheme in the absence of a Walking, Cycling and Horse-riding assessment at each stage of the process. more like this
tabling member constituency East Worthing and Shoreham more like this
tabling member printed
Tim Loughton more like this
uin 213150 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2019-01-31more like thismore than 2019-01-31
answer text <p>A Walking, Cycling and Horse Riding Assessment is carried out by the relevant design team, not Highways England. In this case, we understand that the options and concept stages of the scheme began in the autumn of 2016 before the publication of the Walking, Cycling and Horse Riding Assessment and were subject to the applicable standard on Non-Motorised User Audits. The Transport Assessment accompanying the planning application provided information satisfying the criteria for a non-motorised user context report.</p><p>A Review Report is required at the end of the preliminary design stage and before commencement of detailed design followed by a further Review Report at the end of the detailed design phase and before construction commences. The design team is now at the end of the preliminary design stage, but detailed design has not yet begun. A Review Report is now due and will be completed before the commencement of detailed design.</p><p>The preliminary design improved pedestrian, cycle and equestrian access in the vicinity of the South Downs National Park, and further opportunities for improvement may be identified through a forthcoming Walking, Cycling and Horse Riding Review. The preliminary design was also compliant with Highways England’s design standards for cycle provision. Any non-compliance identified during detailed design will be removed or be subject to the process of assessment whether there may be grounds for a specific variation.</p>
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman remove filter
grouped question UIN
213149 more like this
213152 more like this
question first answered
less than 2019-01-31T13:22:59.067Zmore like thismore than 2019-01-31T13:22:59.067Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
114
label Biography information for Tim Loughton more like this
1050270
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Road Traffic Control: West Sussex more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, pursuant to the Answer of 17 January 2019 to Question 206710 on Road Traffic Control: West Sussex, whether a Walking, Cycling and Horse-riding assessment, including stakeholder engagement, will be undertaken by staff that are independent of the design team. more like this
tabling member constituency East Worthing and Shoreham more like this
tabling member printed
Tim Loughton more like this
uin 213151 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2019-02-04more like thismore than 2019-02-04
answer text <p>It is a requirement of Walking, Cycling and Horse Riding Assessments and Reviews that the lead assessor should be part of the design team and not independent of it.</p><p> </p><p> </p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman remove filter
question first answered
less than 2019-02-04T15:42:15.037Zmore like thismore than 2019-02-04T15:42:15.037Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
114
label Biography information for Tim Loughton more like this
1050279
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Road Traffic Control: West Sussex more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, pursuant to the Answer of 17 January 2019 to Question 20610 on Road Traffic Control: West Sussex, what steps he is taking to ensure that Highways England will revise the scheme in the event that the scheme (a) worsens pedestrian, cycle and equestrian access and in the vicinity of the South Downs National Park and (b) is not compliant with Highways England's design standards for cycle provision. more like this
tabling member constituency East Worthing and Shoreham more like this
tabling member printed
Tim Loughton more like this
uin 213152 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2019-01-31more like thismore than 2019-01-31
answer text <p>A Walking, Cycling and Horse Riding Assessment is carried out by the relevant design team, not Highways England. In this case, we understand that the options and concept stages of the scheme began in the autumn of 2016 before the publication of the Walking, Cycling and Horse Riding Assessment and were subject to the applicable standard on Non-Motorised User Audits. The Transport Assessment accompanying the planning application provided information satisfying the criteria for a non-motorised user context report.</p><p>A Review Report is required at the end of the preliminary design stage and before commencement of detailed design followed by a further Review Report at the end of the detailed design phase and before construction commences. The design team is now at the end of the preliminary design stage, but detailed design has not yet begun. A Review Report is now due and will be completed before the commencement of detailed design.</p><p>The preliminary design improved pedestrian, cycle and equestrian access in the vicinity of the South Downs National Park, and further opportunities for improvement may be identified through a forthcoming Walking, Cycling and Horse Riding Review. The preliminary design was also compliant with Highways England’s design standards for cycle provision. Any non-compliance identified during detailed design will be removed or be subject to the process of assessment whether there may be grounds for a specific variation.</p>
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman remove filter
grouped question UIN
213149 more like this
213150 more like this
question first answered
less than 2019-01-31T13:22:59.13Zmore like thismore than 2019-01-31T13:22:59.13Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
114
label Biography information for Tim Loughton more like this
1050301
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Department for Transport: Trade Associations more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, which regulatory functions imposed by legislation for which his Department has responsibility are currently undertaken by trade associations; and if he will make a statement. more like this
tabling member constituency Harrow West more like this
tabling member printed
Gareth Thomas more like this
uin 213189 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2019-02-05more like thismore than 2019-02-05
answer text <p>To answer this question would require a review of every regulatory function in the Department, which would be disproportionately costly.</p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman remove filter
question first answered
less than 2019-02-05T12:33:50.62Zmore like thismore than 2019-02-05T12:33:50.62Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
177
label Biography information for Gareth Thomas more like this