1177741
registered interest false more like this
date less than 2020-02-11more like thismore than 2020-02-11
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading High Speed 2 Line: Wendover more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, if his Department will make an assessment of the potential merits of the proposals for a mined tunnel in Wendover; and if he will publish the results of that assessment. more like this
tabling member constituency Aylesbury more like this
tabling member printed
Robert Butler more like this
uin 692 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2020-02-18more like thismore than 2020-02-18
answer text <p>The Wendover Mined Tunnel was considered in detail during the passage of the Phase One Bill in both the Commons and Lords committees. Cost comparisons of the consented scheme and the tunnelled alternatives were considered in evidence to both committees during the Bill process and the primary conclusion was that the now consented scheme would be less expensive than the tunnelled alternatives.</p><p> </p><p>Since then, DfT officials and HS2 Ltd have been challenged by Wendover Parish Council and your predecessor, Sir David Lidington, over these decisions and have presented further reports by OTB and Michael Byng (mbpc) challenging the consented scheme.</p><p> </p><p>In each instance, it has been concluded that the Wendover Mined Tunnel would be harder to construct, is costlier and involves a significantly greater degree of risk to the consented scheme.</p><p> </p><p> </p><p> </p><p> </p><p> </p><p>The Department and HS2 Ltd remain convinced that the Select Committee made the right decision when they accepted that there was a significant difference in cost between the mined alternative schemes and concluded that the HS2 Ltd scheme should be retained.</p><p> </p><p>Even if the alternative mined schemes were broadly comparable in these respects, the subsequent costs of seeking legislative consent for the detailed design change and the consequential cost of delaying the introduction of HS2 services do not represent good value for money or an effective use of public money.</p>
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2020-02-18T15:25:19.957Zmore like thismore than 2020-02-18T15:25:19.957Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
4745
label Biography information for Rob Butler more like this
1177359
registered interest false more like this
date less than 2020-02-10more like thismore than 2020-02-10
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Unadopted Roads more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what schemes are available to help communities which have a high number of unadopted roads, due to the closure of large industry, get adopted status for those roads. more like this
tabling member constituency North West Durham more like this
tabling member printed
Mr Richard Holden more like this
uin 14754 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2020-02-17more like thismore than 2020-02-17
answer text <p>The respective owners of private roads are responsible under legislation for ensuring that these roads are brought up to the required standard before local highway authorities can ‘adopt’ them and then maintain them at public expense. In cases where there are large areas of unadopted roads due to the closure of large industries, these may be improved by new developers as part of their development projects or the local authority can bid for Government funds through various programmes like the Local Growth Fund.</p><p> </p><p><strong><br> </strong></p><p><strong> </strong></p> more like this
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2020-02-17T14:40:46.2Zmore like thismore than 2020-02-17T14:40:46.2Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
4813
label Biography information for Mr Richard Holden more like this
1177464
registered interest false more like this
date less than 2020-02-10more like thismore than 2020-02-10
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Electric Vehicles more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps he is taking to ensure that electric cars have a range equivalent to petrol cars by 2035. more like this
tabling member constituency Walsall North more like this
tabling member printed
Eddie Hughes more like this
uin 14808 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2020-02-17more like thismore than 2020-02-17
answer text <p>Improving the range of electric vehicles is primarily a matter for vehicle manufacturers, and this is something that is continuously being improved. Government will continue to support industry in doing this, we have committed £274m from the Industrial Strategy Challenge Fund to the Faraday Battery Challenge to advance electric vehicle battery technology. This funding is supporting battery R&amp;D from the Faraday Institution’s academic research, through Innovate UK’s programme of collaborative applied R&amp;D, to scale-up in the cutting-edge UK Battery Industrialisation Centre. The aims of the Faraday Battery Challenge include improving the energy density of batteries, improving our understanding of temperature effects on range, and reducing battery costs which will make longer range electric vehicles more affordable.</p><p> </p> more like this
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2020-02-17T14:33:51.603Zmore like thismore than 2020-02-17T14:33:51.603Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
4635
label Biography information for Eddie Hughes more like this
1177489
registered interest false more like this
date less than 2020-02-10more like thismore than 2020-02-10
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Heathrow Airport: Air Pollution more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps he is taking to ensure that (a) Putney Heath and (b) other wildlife sites are protected from air traffic pollution if a third runway is built at Heathrow Airport. more like this
tabling member constituency Putney more like this
tabling member printed
Fleur Anderson more like this
uin 14822 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2020-02-13more like thismore than 2020-02-13
answer text <p>Following designation of the Airports National Policy Statement, it is now down to an applicant for development consent to undertake an Environmental Impact Assessment that identifies any likely significant effects of the proposed project on the environment. This will include a detailed assessment of the air quality impacts of its scheme, including during construction, and put forward an appropriate package of mitigations that address air quality impacts and demonstrate compliance.</p><p> </p><p>In order to grant development consent, the Secretary of State would need to be satisfied that, with mitigation, the scheme would be compliant with legal obligations.</p> more like this
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2020-02-13T15:38:15.557Zmore like thismore than 2020-02-13T15:38:15.557Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
4788
label Biography information for Fleur Anderson more like this
1176848
registered interest false more like this
date less than 2020-02-06more like thismore than 2020-02-06
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading M1: Accidents more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, how many incidents involving (a) serious injury and (b) death occurred between Junctions 32 and 35A of the M1 in (i) each year since March 2017 and (ii) each of the three years before March 2017. more like this
tabling member constituency Rotherham more like this
tabling member printed
Sarah Champion more like this
uin 13515 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2020-02-14more like thismore than 2020-02-14
answer text <p>Any death on our roads is one too many. We want our roads to be as safe as possible. That is why I’ve asked the Department to carry out an evidence stocktake to gather the facts about the safety of smart motorways and make recommendations. The Department will present the findings of the stocktake shortly.</p><p> </p><p>While I would not want to pre-judge the results of that work, what I can say is that we will continue to prioritise improving safety – making conditions safer for everyone on our roads. The Roads Minister will write to you as soon as the stocktake is completed to answer your specific question.</p> more like this
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2020-02-14T14:15:09.29Zmore like thismore than 2020-02-14T14:15:09.29Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
4267
label Biography information for Sarah Champion more like this
1176555
registered interest false more like this
date less than 2020-02-05more like thismore than 2020-02-05
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Motorways: Repairs and Maintenance more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what his Departments policy is on the maximum desirable length of roadworks on motorways. more like this
tabling member constituency Warley more like this
tabling member printed
John Spellar more like this
uin 12865 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2020-02-14more like thismore than 2020-02-14
answer text <p>When designing its road works, Highways England uses the guidance provided in the Department for Transport published Traffic Signs Manual: Chapter 8. This recommends that road works are limited to a maximum of 6km (around 3 and ¾ miles), although the adoption of longer lengths of road works is permissible providing they do not create unacceptable impacts. Where longer lengths of road works are adopted, site specific risk assessments are required to identify the safe maximum length. Limiting all road works to a maximum length would increase both costs and duration of some works due to the activities undertaken.</p><p> </p> more like this
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2020-02-14T14:33:55.897Zmore like thismore than 2020-02-14T14:33:55.897Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
318
label Biography information for Lord Spellar more like this
1141355
registered interest false more like this
date less than 2019-07-23more like thismore than 2019-07-23
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Railways: Standards more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what proportion of services leaving each railway station were (a) cancelled or significantly late and (b) met the public performance measure in each of the last five years. more like this
tabling member constituency Harborough more like this
tabling member printed
Neil O'Brien more like this
uin 281069 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-07-31more like thismore than 2019-07-31
answer text <p>We recognise performance on the railway has been unsatisfactory, and passengers have not always received the level of service they expected. While performance has improved recently, the new Transport Secretary understands passengers need the certainty of reliable journeys, and is determined to work with industry to improve performance.</p><p> </p><p>Official statistics on passenger rail reliability and performance are published by the Office of Rail and Road (ORR).</p><p> </p><p>Cancellations and Significant Lateness (CaSL) measures the proportion of trains arriving at the final destination more than 30 minutes after the planned timetable or is cancelled either in full or in part.</p><p> </p><p>The Public Performance Measure (PPM) is defined as the percentage of trains arriving at the final destination within five minutes of the planned timetable for London and South East, Regional and Scotland operators, or within ten minutes for the Long Distance operators.</p><p> </p><p>Both PPM and CaSL measures reflect punctuality and reliability at the final destination, rather than at each station stop. For ease of reference, the national PPM and CaSL scores for the last 5 years are included in the table below.</p><p> </p><p><em>Table 1 – National PPM and CaSL, 2014-15 to 2018-19</em></p><table><tbody><tr><td><p> </p></td><td><p>2014-15</p></td><td><p>2015-16</p></td><td><p>2016-17</p></td><td><p>2017-18</p></td><td><p>2018-19</p></td></tr><tr><td><p><strong>PPM</strong></p></td><td><p>89.7%</p></td><td><p>89.1%</p></td><td><p>87.7%</p></td><td><p>87.8%</p></td><td><p>86.3%</p></td></tr><tr><td><p><strong>CaSL</strong></p></td><td><p>2.8%</p></td><td><p>3.1%</p></td><td><p>3.8%</p></td><td><p>3.9%</p></td><td><p>4.3%</p></td></tr></tbody></table><p> </p><p><em>Source: ORR</em></p><p> </p><p>The latest PPM and CaSL statistics can be found on the ORR website at the below link:</p><p> </p><p><a href="https://dataportal.orr.gov.uk/statistics/performance/passenger-and-freight-rail-performance/" target="_blank">https://dataportal.orr.gov.uk/statistics/performance/passenger-and-freight-rail-performance/</a></p><p> </p><p>Since April 2019, the industry has adopted a new set of standard measures for measuring train performance including punctuality at each recorded station stop. The latest statistics are available from the below link:</p><p> </p><p><a href="https://dataportal.orr.gov.uk/statistics/performance/passenger-and-freight-rail-performance/train-punctuality-at-recorded-station-stops-by-toc-table-365/" target="_blank">https://dataportal.orr.gov.uk/statistics/performance/passenger-and-freight-rail-performance/train-punctuality-at-recorded-station-stops-by-toc-table-365/</a></p><p> </p><p>Further performance statistics for specific stations are held by Network Rail. We advise you contact them directly for further information.</p>
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2019-07-31T16:58:40.977Zmore like thismore than 2019-07-31T16:58:40.977Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
4679
label Biography information for Neil O'Brien more like this
1141003
registered interest false more like this
date less than 2019-07-22more like thismore than 2019-07-22
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Heathrow Airport: Air Pollution more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps his Department is taking to ensure the planned expansion of Heathrow does not contribute to an increase in air pollution. more like this
tabling member constituency Tooting more like this
tabling member printed
Dr Rosena Allin-Khan more like this
uin 280434 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-07-30more like thismore than 2019-07-30
answer text <p>In regards to air quality, following designation of the Airports National Policy Statement, it is now down to an applicant for development consent to undertake a detailed assessment of the air quality impacts of its scheme, including during construction, and put forward an appropriate package of mitigations that address air quality impacts and demonstrate compliance.</p><p> </p><p>In order to grant development consent, I would need to be satisfied that, with mitigation, the scheme would be compliant with legal obligations.</p><p> </p><p>Separately, my Department will also be working to speed up the research, development and adoption of low and zero carbon aviation technology.</p><p> </p> more like this
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2019-07-30T16:55:24.373Zmore like thismore than 2019-07-30T16:55:24.373Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
4573
label Biography information for Dr Rosena Allin-Khan more like this
1141105
registered interest false more like this
date less than 2019-07-22more like thismore than 2019-07-22
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Shipping: Security more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what parts of the Government’s plan for getting an exemption from maritime security notifications in the event of a no deal Brexit have been implemented. more like this
tabling member constituency Streatham more like this
tabling member printed
Chuka Umunna more like this
uin 280345 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-07-30more like thismore than 2019-07-30
answer text <p>Earlier this year my officials progressed a Statutory Instrument through Parliament which ensures that the UK’s existing regulatory regime for ship and port security will continue to function effectively after EU Exit.</p><p> </p><p>The Statutory Instrument will enter into force on the day on which the UK leaves the EU. This Statutory Instrument includes provisions which enable the Government to continue to issue pre-arrival notification (PAN) exemptions to operators of vessels travelling on scheduled services from the EU into the UK after our withdrawal from the EU, even in a no deal scenario.</p><p> </p><p>Vessels travelling from the UK into the EU following the UK’s withdrawal from the EU will need to provide the necessary pre-arrival security information for scheduled routes. Government has communicated widely with operators and has provided advice to them about the change. This was done in the form of a technical notice which can be found here;</p><p><a href="https://www.gov.uk/government/publications/getting-an-exemption-from-maritime-security-notifications-if-theres-no-brexit-deal/getting-an-exemption-from-maritime-security-notifications-if-theres-no-brexit-deal" target="_blank">https://www.gov.uk/government/publications/getting-an-exemption-from-maritime-security-notifications-if-theres-no-brexit-deal/getting-an-exemption-from-maritime-security-notifications-if-theres-no-brexit-deal</a>.</p>
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2019-07-30T11:32:13.73Zmore like thismore than 2019-07-30T11:32:13.73Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
4128
label Biography information for Chuka Umunna more like this
1141106
registered interest false more like this
date less than 2019-07-22more like thismore than 2019-07-22
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Merchant Shipping: Certification more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what parts of the Government’s plan for recognition of seafarer certificates of competency in the event that the UK leaves the EU without a deal have been implemented. more like this
tabling member constituency Streatham more like this
tabling member printed
Chuka Umunna more like this
uin 280346 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-07-30more like thismore than 2019-07-30
answer text <p>The Government has taken forward the actions identified in the notice on seafarer certificates published in September 2018. We have introduced the Merchant Shipping (Standards of Training, Certification and Watchkeeping) (Amendment) (EU Exit) Regulations 2019. The regulations correct deficiencies in domestic legislation that would otherwise have existed as a result of the UK’s withdrawal from the EU. This enables continued recognition of seafarer qualifications from EU and EEA countries.</p><p> </p><p>Before the original date of 29 March for UK’s departure from the EU, the Government lobbied Member States to initiate the process of recognising UK certificates following the well-established EU process for recognising certificates from third countries.</p> more like this
answering member constituency Welwyn Hatfield remove filter
answering member printed Grant Shapps more like this
question first answered
less than 2019-07-30T11:28:22.42Zmore like thismore than 2019-07-30T11:28:22.42Z
answering member
1582
label Biography information for Grant Shapps more like this
tabling member
4128
label Biography information for Chuka Umunna more like this