Linked Data API

Show Search Form

Search Results

946796
registered interest false more like this
date less than 2018-07-23more like thismore than 2018-07-23
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Lakeside Energy from Waste more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether the role of the high temperature incinerator at the Lakeside Energy from Waste facility in the disposal of waste from the Salisbury novichok incident demonstrates that that facility is of national strategic significance in the context of the Airports National Policy Statement; and if he will make a statement. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 167222 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-09-07more like thismore than 2018-09-07
answer text <p>This Government welcomes the support from the operators Grundon at the high temperature incinerator at Lakeside which is being used for the safe disposal of waste produced by decontamination work following the Salisbury incident. The facility is one of several high temperature incinerators in the UK capable of incinerating large quantities of such waste. The Government therefore does not consider the status of the plant to have changed from that described in the Airports National Policy Statement.</p><p> </p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-09-07T09:43:07.663Zmore like thismore than 2018-09-07T09:43:07.663Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
924095
registered interest false more like this
date less than 2018-06-14more like thismore than 2018-06-14
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Lakeside Energy from Waste more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether his Department has made an assessment of how long the relocation of Lakeside Energy from Waste will take in the event of a third runway being constructed at Heathrow Airport. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 153795 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-21more like thismore than 2018-06-21
answer text <p>The Government has not undertaken a separate assessment of how long it would take to relocate the plant because relocation is not necessary from a statutory or policy perspective. However if relocation was to take place, the Airports Commission estimated that the process may take five years.</p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-06-21T16:30:11.943Zmore like thismore than 2018-06-21T16:30:11.943Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
924097
registered interest false more like this
date less than 2018-06-14more like thismore than 2018-06-14
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Heathrow Airport: Construction more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether his Department has made an assessment of the water bodies required to prevent a deterioration of water body status in the event of a third runway being constructed at Heathrow. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 153796 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-21more like thismore than 2018-06-21
answer text <p>In the Appraisal of Sustainability (AoS) that accompanies the proposed Airports National Policy Statement (NPS), the Government has undertaken a high level assessment of the effect on the water environment of the Heathrow Northwest Runway scheme.</p><p> </p><p>The proposed Airports NPS sets out the requirements in relation to water quality and resources which any applicant for a Development Consent Order would need to meet. This potentially includes the effects on water bodies or protected areas under the Water Framework Directive.</p><p> </p><p>The Government has not estimated the time it will take to decontaminate land. This a matter that would need to be addressed as part of any application for development consent. The AoS identifies a range of sources and pathways for contamination within the site boundary. These include two active landfills, 16 historic landfills and 11 registered pollution incidents, five of which are classified as significant.</p><p><strong> </strong></p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
grouped question UIN
153797 more like this
153798 more like this
question first answered
less than 2018-06-21T16:24:39.237Zmore like thismore than 2018-06-21T16:24:39.237Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
924098
registered interest false more like this
date less than 2018-06-14more like thismore than 2018-06-14
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Heathrow Airport: Construction more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether his Department has estimated the time it will take to decontaminate land before a third runway can be constructed at Heathrow. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 153797 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-21more like thismore than 2018-06-21
answer text <p>In the Appraisal of Sustainability (AoS) that accompanies the proposed Airports National Policy Statement (NPS), the Government has undertaken a high level assessment of the effect on the water environment of the Heathrow Northwest Runway scheme.</p><p> </p><p>The proposed Airports NPS sets out the requirements in relation to water quality and resources which any applicant for a Development Consent Order would need to meet. This potentially includes the effects on water bodies or protected areas under the Water Framework Directive.</p><p> </p><p>The Government has not estimated the time it will take to decontaminate land. This a matter that would need to be addressed as part of any application for development consent. The AoS identifies a range of sources and pathways for contamination within the site boundary. These include two active landfills, 16 historic landfills and 11 registered pollution incidents, five of which are classified as significant.</p><p><strong> </strong></p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
grouped question UIN
153796 more like this
153798 more like this
question first answered
less than 2018-06-21T16:24:39.3Zmore like thismore than 2018-06-21T16:24:39.3Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
924099
registered interest false more like this
date less than 2018-06-14more like thismore than 2018-06-14
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Heathrow Airport: Construction more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether his Department has estimated the quantity of contaminated land that will need to be decontaminated before a third runway can be constructed at Heathrow. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 153798 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-21more like thismore than 2018-06-21
answer text <p>In the Appraisal of Sustainability (AoS) that accompanies the proposed Airports National Policy Statement (NPS), the Government has undertaken a high level assessment of the effect on the water environment of the Heathrow Northwest Runway scheme.</p><p> </p><p>The proposed Airports NPS sets out the requirements in relation to water quality and resources which any applicant for a Development Consent Order would need to meet. This potentially includes the effects on water bodies or protected areas under the Water Framework Directive.</p><p> </p><p>The Government has not estimated the time it will take to decontaminate land. This a matter that would need to be addressed as part of any application for development consent. The AoS identifies a range of sources and pathways for contamination within the site boundary. These include two active landfills, 16 historic landfills and 11 registered pollution incidents, five of which are classified as significant.</p><p><strong> </strong></p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
grouped question UIN
153796 more like this
153797 more like this
question first answered
less than 2018-06-21T16:24:39.363Zmore like thismore than 2018-06-21T16:24:39.363Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
924100
registered interest false more like this
date less than 2018-06-14more like thismore than 2018-06-14
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Lakeside Energy from Waste more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether his Department has identified waste disposal facilities in south-east England with like-for-like spare capacity to deal with the closure of Lakeside Energy from Waste in the event of a third runway being constructed at Heathrow. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 153799 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-21more like thismore than 2018-06-21
answer text <p>The Government has not sought to identify specific like for like energy from waste facilities to manage the loss of the Lakeside plant. DEFRA’s assessment used publicly available data on waste disposal held by the Environment Agency to confirm that the Lakeside energy from waste plant is not a strategic asset.</p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-06-21T16:27:10.93Zmore like thismore than 2018-06-21T16:27:10.93Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
833917
registered interest false more like this
date less than 2018-01-30more like thismore than 2018-01-30
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Heathrow Airport: Inland Waterways more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what assessment has been made of the effect on local waterways of the proposal to expand Heathrow. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 125675 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-02-05more like thismore than 2018-02-05
answer text <p>The Department has carried out an Appraisal of Sustainability (AoS) to support development of the draft Airports National Policy Statement (NPS). The AoS assesses impacts on culverting and diversion of watercourses.</p><p><strong> </strong></p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-02-05T13:48:49.177Zmore like thismore than 2018-02-05T13:48:49.177Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
596160
registered interest false more like this
date less than 2016-10-07more like thismore than 2016-10-07
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Energy: Meters more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what steps his Department has taken to ensure that smart meter software is secure by design. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 47180 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2016-10-12more like thismore than 2016-10-12
answer text <p>The Department has worked with industry and security experts, including GCHQ, to design a smart metering system that has robust security controls in place. System security is based on international standards. It includes encryption of sensitive data, protection from viruses and malware, access control, two-party authorisation of important messages to the meters and system monitoring.</p><p>Further information on smart metering security and GCHQ’s role in it can be found on GCHQ’s website: <a href="https://www.ncsc.gov.uk/articles/smart-security-behind-gb-smart-metering-system" target="_blank">https://www.ncsc.gov.uk/articles/smart-security-behind-gb-smart-metering-system</a></p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2016-10-12T16:07:07.637Zmore like thismore than 2016-10-12T16:07:07.637Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
596195
registered interest false more like this
date less than 2016-10-07more like thismore than 2016-10-07
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Energy: Meters more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what recent assessment he has made of whether his Department is on course to complete the roll-out of smart meters by 2020. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 47374 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2016-10-12more like thismore than 2016-10-12
answer text <p>The Government is committed to every home and small business being offered smart meters by the end of 2020. The Programme is making good progress. More than 4.2 million meters have been installed in homes and businesses across Great Britain.</p><p>Data on the number of smart electricity and gas meters installed in Great Britain is set out in the Government’s ‘Smart Meters, Great Britain, Quarterly report to end June 2016’, published on 29 September 2016: <a href="https://www.gov.uk/government/statistics/statistical-release-and-data-smart-meters-great-britain-quarter-2-2016" target="_blank">https://www.gov.uk/government/statistics/statistical-release-and-data-smart-meters-great-britain-quarter-2-2016</a></p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2016-10-12T15:50:33.227Zmore like thismore than 2016-10-12T15:50:33.227Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter