Linked Data API

Show Search Form

Search Results

946796
registered interest false more like this
date less than 2018-07-23more like thismore than 2018-07-23
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Lakeside Energy from Waste remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether the role of the high temperature incinerator at the Lakeside Energy from Waste facility in the disposal of waste from the Salisbury novichok incident demonstrates that that facility is of national strategic significance in the context of the Airports National Policy Statement; and if he will make a statement. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 167222 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-09-07more like thismore than 2018-09-07
answer text <p>This Government welcomes the support from the operators Grundon at the high temperature incinerator at Lakeside which is being used for the safe disposal of waste produced by decontamination work following the Salisbury incident. The facility is one of several high temperature incinerators in the UK capable of incinerating large quantities of such waste. The Government therefore does not consider the status of the plant to have changed from that described in the Airports National Policy Statement.</p><p> </p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-09-07T09:43:07.663Zmore like thismore than 2018-09-07T09:43:07.663Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
924091
registered interest false more like this
date less than 2018-06-14more like thismore than 2018-06-14
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Lakeside Energy from Waste remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, with reference to the page 92 of the Government’s response to the Transport Committee’s report, Airports National Policy Statement, published on 23 March 2018, HC 548, what plans he has to make an assessment of the removal of the Lakeside energy from waste plant upon capacity for treatment of waste to be carried out by Heathrow Airports Ltd under the Airports National Policy Statement. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 153791 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-19more like thismore than 2018-06-19
answer text <p>The Government has no plans to make any further assessments of the removal of the Lakeside Energy from Waste plant. The proposed Airports National Policy Statement (NPS) at para 5.142 makes clear that the effects of removing the plant will require assessment by an applicant for Development Consent. The proposed Airports NPS also sets out the requirements on an applicant for the management of the waste generated by the development.</p><p> </p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
grouped question UIN 153794 more like this
question first answered
less than 2018-06-19T14:09:22.287Zmore like thismore than 2018-06-19T14:09:22.287Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
924095
registered interest false more like this
date less than 2018-06-14more like thismore than 2018-06-14
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Lakeside Energy from Waste remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether his Department has made an assessment of how long the relocation of Lakeside Energy from Waste will take in the event of a third runway being constructed at Heathrow Airport. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 153795 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-21more like thismore than 2018-06-21
answer text <p>The Government has not undertaken a separate assessment of how long it would take to relocate the plant because relocation is not necessary from a statutory or policy perspective. However if relocation was to take place, the Airports Commission estimated that the process may take five years.</p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-06-21T16:30:11.943Zmore like thismore than 2018-06-21T16:30:11.943Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
924100
registered interest false more like this
date less than 2018-06-14more like thismore than 2018-06-14
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Lakeside Energy from Waste remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether his Department has identified waste disposal facilities in south-east England with like-for-like spare capacity to deal with the closure of Lakeside Energy from Waste in the event of a third runway being constructed at Heathrow. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 153799 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-21more like thismore than 2018-06-21
answer text <p>The Government has not sought to identify specific like for like energy from waste facilities to manage the loss of the Lakeside plant. DEFRA’s assessment used publicly available data on waste disposal held by the Environment Agency to confirm that the Lakeside energy from waste plant is not a strategic asset.</p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-06-21T16:27:10.93Zmore like thismore than 2018-06-21T16:27:10.93Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
921920
registered interest false more like this
date less than 2018-06-11more like thismore than 2018-06-11
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Lakeside Energy from Waste remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, with reference to paragraph 1.113 of the Government Response to the Transport Committee Report on the revised draft Airports National Policy Statement, HC 548. what the evidential basis was for his Department's statement that there is sufficient waste management capacity to absorb any Lakeside loss. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 152118 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-18more like thismore than 2018-06-18
answer text <p>DEFRA used publicly available data on waste disposal held by the Environment Agency to confirm that the Lakeside energy from waste plant is not a strategic asset and its loss would not affect the UK’s ability to meet environmental targets e.g. diversion from landfill. Therefore there is neither a statutory nor a policy reason to mandate replacement of the plant in the proposed Airports National Policy Statement.</p><p> </p><p>The Lakeside energy from waste High Temperature Incinerator (HTI) mainly treats clinical waste. In the South East and London Regions (which includes the Lakeside facility) there are three HTIs (including Lakeside) with permitted capacity of 68kt. However, in 2016 only 57kt of waste was treated in total at these facilities and 5kt (or 9% of the total capacity) at Lakeside. The clinical waste burned at Lakeside does not have to be dealt with by an HTI. There are six clinical waste plants in the South East and London Regions (including Lakeside) therefore the loss of the clinical waste tonnage at Lakeside could be met by other facilities.</p><p> </p>
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
grouped question UIN 152119 more like this
question first answered
less than 2018-06-18T14:09:46.843Zmore like thismore than 2018-06-18T14:09:46.843Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter
921921
registered interest false more like this
date less than 2018-06-11more like thismore than 2018-06-11
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Lakeside Energy from Waste remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, which waste disposal facilities with High Temperature Incinerators his Department has assessed as having enough spare capacity to deal with the loss of Lakeside Energy from Waste in the event of the construction of a third runway at Heathrow. more like this
tabling member constituency Windsor more like this
tabling member printed
Adam Afriyie more like this
uin 152119 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-18more like thismore than 2018-06-18
answer text <p>DEFRA used publicly available data on waste disposal held by the Environment Agency to confirm that the Lakeside energy from waste plant is not a strategic asset and its loss would not affect the UK’s ability to meet environmental targets e.g. diversion from landfill. Therefore there is neither a statutory nor a policy reason to mandate replacement of the plant in the proposed Airports National Policy Statement.</p><p> </p><p>The Lakeside energy from waste High Temperature Incinerator (HTI) mainly treats clinical waste. In the South East and London Regions (which includes the Lakeside facility) there are three HTIs (including Lakeside) with permitted capacity of 68kt. However, in 2016 only 57kt of waste was treated in total at these facilities and 5kt (or 9% of the total capacity) at Lakeside. The clinical waste burned at Lakeside does not have to be dealt with by an HTI. There are six clinical waste plants in the South East and London Regions (including Lakeside) therefore the loss of the clinical waste tonnage at Lakeside could be met by other facilities.</p><p> </p>
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
grouped question UIN 152118 more like this
question first answered
less than 2018-06-18T14:09:46.907Zmore like thismore than 2018-06-18T14:09:46.907Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1586
label Biography information for Adam Afriyie remove filter