Linked Data API

Show Search Form

Search Results

1005769
registered interest false more like this
date less than 2018-11-12more like thismore than 2018-11-12
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Dartford-Thurrock Crossing remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, pursuant to the Answer of 7 November 2018 to Question 185533 on Dartford-Thurrock Crossing, if his Department will collect data about average journey times during peak hours. more like this
tabling member constituency Bexleyheath and Crayford more like this
tabling member printed
Sir David Evennett more like this
uin 190369 more like this
answer
answer
is ministerial correction false more like this
date of answer remove maximum value filtermore like thismore than 2018-11-20
answer text <p>Highways England, with the support of the Department for Transport, henceforth, will collate average monthly peak period journey time data and continue to gather the average journey time data provided in response to PQ 185533. Data will be obtained for both the northbound and southbound carriageways.</p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-11-20T15:27:29.583Zmore like thismore than 2018-11-20T15:27:29.583Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1198
label Biography information for Sir David Evennett more like this
997678
registered interest false more like this
date less than 2018-10-30more like thismore than 2018-10-30
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Dartford-Thurrock Crossing remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what the average journey time was to cross the Dartford Crossing northbound at peak times in each of the last ten years. more like this
tabling member constituency Bexleyheath and Crayford more like this
tabling member printed
Sir David Evennett more like this
uin 185533 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-11-07more like thismore than 2018-11-07
answer text <p>The table below contains the available average all-day journey time data for the northbound route from M25 Junction 2 to M25 Junction 30 which encompasses the Dartford Thurrock Crossing. This data represents that which has been collected and processed on a consistent and comparable basis since 2014. Unfortunately, the peak time only data for the same period is not available.</p><p> </p><p> </p><p><strong>Average Journey Time, Dartford Crossing Northbound (M25 J2 - J30), 2014-18</strong></p><p><strong> </strong></p><table><tbody><tr><td><p><strong>Time period (month-year)</strong></p></td><td><p><strong>Average journey time (minutes: seconds)</strong></p></td><td><p><strong>Time period (month-year)</strong></p></td><td><p><strong>Average journey time (minutes: seconds)</strong></p></td></tr><tr><td><p>Jan-14</p></td><td><p>06:48</p></td><td><p>Jan-17</p></td><td><p>07:01</p></td></tr><tr><td><p>Feb-14</p></td><td><p>08:32</p></td><td><p>Feb-17</p></td><td><p>07:32</p></td></tr><tr><td><p>Mar-14</p></td><td><p>07:56</p></td><td><p>Mar-17</p></td><td><p>07:26</p></td></tr><tr><td><p>Apr-14</p></td><td><p>08:32</p></td><td><p>Apr-17</p></td><td><p>08:05</p></td></tr><tr><td><p>May-14</p></td><td><p>08:57</p></td><td><p>May-17</p></td><td><p>07:45</p></td></tr><tr><td><p>Jun-14</p></td><td><p>09:28</p></td><td><p>Jun-17</p></td><td><p>08:55</p></td></tr><tr><td><p>Jul-14</p></td><td><p>10:19</p></td><td><p>Jul-17</p></td><td><p>09:38</p></td></tr><tr><td><p>Aug-14</p></td><td><p>11:22</p></td><td><p>Aug-17</p></td><td><p>10:14</p></td></tr><tr><td><p>Sep-14</p></td><td><p>09:38</p></td><td><p>Sep-17</p></td><td><p>08:41</p></td></tr><tr><td><p>Oct-14</p></td><td><p>09:54</p></td><td><p>Oct-17</p></td><td><p>08:30</p></td></tr><tr><td><p>Nov-14</p></td><td><p>09:56</p></td><td><p>Nov-17</p></td><td><p>08:48</p></td></tr><tr><td><p>Dec-14</p></td><td><p>08:42</p></td><td><p>Dec-17</p></td><td><p>08:42</p></td></tr><tr><td><p>Jan-15</p></td><td><p>07:20</p></td><td><p>Jan-18</p></td><td><p>06:45</p></td></tr><tr><td><p>Feb-15</p></td><td><p>08:26</p></td><td><p>Feb-18</p></td><td><p>07:56</p></td></tr><tr><td><p>Mar-15</p></td><td><p>08:11</p></td><td><p>Mar-18</p></td><td><p>08:34</p></td></tr><tr><td><p>Apr-15</p></td><td><p>08:30</p></td><td><p>Apr-18</p></td><td><p>09:09</p></td></tr><tr><td><p>May-15</p></td><td><p>08:36</p></td><td><p>May-18</p></td><td><p>08:29</p></td></tr><tr><td><p>Jun-15</p></td><td><p>09:16</p></td><td><p>Jun-18</p></td><td><p>08:59</p></td></tr><tr><td><p>Jul-15</p></td><td><p>08:59</p></td></tr><tr><td><p>Aug-15</p></td><td><p>09:40</p></td></tr><tr><td><p>Sep-15</p></td><td><p>08:00</p></td></tr><tr><td><p>Oct-15</p></td><td><p>08:20</p></td></tr><tr><td><p>Nov-15</p></td><td><p>08:38</p></td></tr><tr><td><p>Dec-15</p></td><td><p>09:11</p></td></tr><tr><td><p>Jan-16</p></td><td><p>08:31</p></td></tr><tr><td><p>Feb-16</p></td><td><p>09:05</p></td></tr><tr><td><p>Mar-16</p></td><td><p>08:02</p></td></tr><tr><td><p>Apr-16</p></td><td><p>09:10</p></td></tr><tr><td><p>May-16</p></td><td><p>09:28</p></td></tr><tr><td><p>Jun-16</p></td><td><p>09:13</p></td></tr><tr><td><p>Jul-16</p></td><td><p>10:12</p></td></tr><tr><td><p>Aug-16</p></td><td><p>10:55</p></td></tr><tr><td><p>Sep-16</p></td><td><p>10:39</p></td></tr><tr><td><p>Oct-16</p></td><td><p>12:02</p></td></tr><tr><td><p>Nov-16</p></td><td><p>09:29</p></td></tr><tr><td><p>Dec-16</p></td><td><p>08:07</p></td></tr></tbody></table><p><strong> </strong></p><p> </p>
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-11-07T12:45:11.5Zmore like thismore than 2018-11-07T12:45:11.5Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1198
label Biography information for Sir David Evennett more like this
918387
registered interest false more like this
date less than 2018-06-06more like thismore than 2018-06-06
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Dartford-Thurrock Crossing remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what recent assessment he has made of trends in the number of vehicles using the Dartford Crossing; and to what extent that crossing is (a) meeting and (b) exceeding its operational capacity. more like this
tabling member constituency Dartford more like this
tabling member printed
Gareth Johnson more like this
uin 150644 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-06-14more like thismore than 2018-06-14
answer text <p>The performance of the Dartford Crossing is continually monitored. The design capacity of the Crossing is 135,000 vehicles per day. The average number of vehicles that used the Dartford Crossing per day in 2017 was 156,978.</p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-06-14T07:07:48.023Zmore like thismore than 2018-06-14T07:07:48.023Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
3970
label Biography information for Gareth Johnson more like this
890096
registered interest false more like this
date less than 2018-04-23more like thismore than 2018-04-23
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Dartford-Thurrock Crossing remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps his Department plans to take to reduce delays at the Dartford Crossing. more like this
tabling member constituency Bexleyheath and Crayford more like this
tabling member printed
David Evennett more like this
uin 137146 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-04-30more like thismore than 2018-04-30
answer text <p>The Government recognises that further work is needed to address the congestion experienced at and around the Dartford Crossing and has committed £10m on measures to improve the traffic flow and reduce delays. This includes improvements to the A282 Junction 1a by Highways England working in collaboration with Kent County Council, and work on the M25 Junction 2 to help reduce congestion south of the crossing is due to start imminently.</p><p> </p><p>These were part of the preferred route announcement for the new Lower Thames Crossing that aims to provide more than 70 per cent of additional capacity and a long-term solution to help relieve congestion at the Dartford Crossing.</p><p> </p><p>Alongside this, a Dartford - Thurrock study will identify further proposals to reduce congestion that could be delivered in advance of the opening of the Lower Thames Crossing.</p><p> </p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2018-04-30T11:15:51.943Zmore like thismore than 2018-04-30T11:15:51.943Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1198
label Biography information for Sir David Evennett more like this
757806
registered interest false more like this
date less than 2017-09-05more like thismore than 2017-09-05
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Dartford-Thurrock Crossing remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what the cost was of managing the Dartford River Crossing in the last financial year; and what income was received from (a) user charges and (b) penalty notices related to that crossing. more like this
tabling member constituency Warley more like this
tabling member printed
John Spellar more like this
uin 8856 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-09-12more like thismore than 2017-09-12
answer text <p>Highways England is currently finalising the Dartford River Crossing accounts for 2016/17 which will be audited by the National Audit Office in October 2017. The 2016/17 figures cannot be provided at this point.</p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2017-09-12T08:57:23.987Zmore like thismore than 2017-09-12T08:57:23.987Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
318
label Biography information for John Spellar more like this
751447
registered interest false more like this
date less than 2017-07-12more like thismore than 2017-07-12
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Dartford-Thurrock Crossing remove filter
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what estimate his Department has made of the potential effect on levels of congestion at the Dartford Crossing after the construction of the proposed new Lower Thames Crossing. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 4683 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-07-20more like thismore than 2017-07-20
answer text <p>Through traffic modelling and forecasting Highways England has made an assessment of the scheme’s potential effect on levels of congestion at the Dartford Crossing. This is reported in section 4 of the Post-Consultation Scheme Assessment Report Volume 5.</p><p><a href="https://highwaysengland.citizenspace.com/cip/lower-thames-crossing-consultation/supporting_documents/PostConsultation%20Scheme%20Assessment%20Report%20Volume%205.pdf" target="_blank">https://highwaysengland.citizenspace.com/cip/lower-thames-crossing-consultation/supporting_documents/PostConsultation%20Scheme%20Assessment%20Report%20Volume%205.pdf</a></p><p> </p><p>As the detailed design for the scheme progresses this will be subject to further assessment and an enhanced traffic model is being developed incorporating the latest travel demand data. This will be used to produce revised traffic volume and congestion forecasts for the local and wider road network, including the Dartford Crossing.</p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2017-07-20T13:35:09.273Zmore like thismore than 2017-07-20T13:35:09.273Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1522
label Biography information for Adam Holloway more like this