Linked Data API

Show Search Form

Search Results

1056718
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading M20: Road Traffic Control more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps he is taking through Operation Brock to prepare for potential congestion around junctions 3, 4 and 5 of the M25 motorway as a result of disruption on the M20 and M26 in the event of the UK leaving the EU without a deal. more like this
tabling member constituency Orpington more like this
tabling member printed
Joseph Johnson more like this
uin 218299 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-02-14more like thismore than 2019-02-14
answer text <p>The plans for Operation Brock have been designed to keep traffic flowing in both directions on the M20 in the event of disruption to freight and other transport across the Channel. It would also thereby alleviate traffic congestion across the neighbouring strategic and local road network. The deployment of the M26 to queue Heavy Goods Vehicles (HGVs) temporarily will only be done in the unlikely event that capacity has been exceeded elsewhere under Brock contingency planning. The routes that HGVs will be directed to travel under Brock will be clearly signposted, and have been designed to minimise disruption on other roads, such as the M25, as much as possible.</p><p> </p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2019-02-14T15:35:49.943Zmore like thismore than 2019-02-14T15:35:49.943Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
4039
label Biography information for Lord Johnson of Marylebone more like this
1056754
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Department for Transport: Brexit more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, how many officials from his Department have been seconded from their primary role to make preparations for the UK leaving the EU without a deal; and if he will make a statement. more like this
tabling member constituency Harrow West more like this
tabling member printed
Gareth Thomas more like this
uin 218157 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-02-13more like thismore than 2019-02-13
answer text <p>The Department has approximately 260 Full Time Equivalent staff currently working on EU Exit. The Department does not distinguish between those working on deal and no-deal scenarios.</p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2019-02-13T17:16:24.413Zmore like thismore than 2019-02-13T17:16:24.413Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
177
label Biography information for Gareth Thomas more like this
1056863
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading A1 (M): Repairs and Maintenance more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what plans are in place to repair the potholes and poor road surface on the A1M northbound carriageway south of junction 7; and if he will make a statement. more like this
tabling member constituency East Yorkshire more like this
tabling member printed
Sir Greg Knight more like this
uin 218220 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-02-12more like thismore than 2019-02-12
answer text <p>The A1(M) is inspected weekly and safety critical potholes and surface defects are repaired within 24 hours. Highways England have made safe 36 potholes on the northbound carriageway and larger patch repairs across 100 square metres of carriageway between junctions 6 and 7 since December 2018. They plan to carry out other surface repairs between junctions 6 and 7 before the end of March.</p><p> </p><p>Highways England have also recently completed road surface condition surveys of the A1(M) and other strategic roads in the region. These will be used to determine a prioritised programme of resurfacing work on the A1(M) and other roads over the next 3 years.</p><p> </p><p>In addition, construction of the A1(M) junctions 6 – 8 smart motorway starts in the next financial year. Construction will include resurfacing at various locations in both directions between junctions 6 and 8.</p><p> </p> more like this
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
question first answered
less than 2019-02-12T14:05:54.35Zmore like thismore than 2019-02-12T14:05:54.35Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1200
label Biography information for Sir Greg Knight more like this