Linked Data API

Show Search Form

Search Results

1050262
registered interest false more like this
date less than 2019-01-28more like thismore than 2019-01-28
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading Road Traffic Control: West Sussex more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of Secretary of State for Transport, pursuant to the Answer of 17 January 2019 to Question 206710 on Road Traffic Control: West Sussex, for what reason Highways England did not undertake a (a) Walking, Cycling and Horse-riding assessment during the options and concept stages of the scheme's development and (b) Review report at the conclusion of the preliminary design stage, in accordance with the Design Manual for Roads and Bridges. more like this
tabling member constituency East Worthing and Shoreham more like this
tabling member printed
Tim Loughton more like this
uin 213149 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-01-31more like thismore than 2019-01-31
answer text <p>A Walking, Cycling and Horse Riding Assessment is carried out by the relevant design team, not Highways England. In this case, we understand that the options and concept stages of the scheme began in the autumn of 2016 before the publication of the Walking, Cycling and Horse Riding Assessment and were subject to the applicable standard on Non-Motorised User Audits. The Transport Assessment accompanying the planning application provided information satisfying the criteria for a non-motorised user context report.</p><p>A Review Report is required at the end of the preliminary design stage and before commencement of detailed design followed by a further Review Report at the end of the detailed design phase and before construction commences. The design team is now at the end of the preliminary design stage, but detailed design has not yet begun. A Review Report is now due and will be completed before the commencement of detailed design.</p><p>The preliminary design improved pedestrian, cycle and equestrian access in the vicinity of the South Downs National Park, and further opportunities for improvement may be identified through a forthcoming Walking, Cycling and Horse Riding Review. The preliminary design was also compliant with Highways England’s design standards for cycle provision. Any non-compliance identified during detailed design will be removed or be subject to the process of assessment whether there may be grounds for a specific variation.</p>
answering member constituency Hereford and South Herefordshire remove filter
answering member printed Jesse Norman more like this
grouped question UIN
213150 more like this
213152 more like this
question first answered
less than 2019-01-31T13:22:59.02Zmore like thismore than 2019-01-31T13:22:59.02Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
114
label Biography information for Tim Loughton more like this