answer text |
<p>The plans for Operation Brock have been designed to keep traffic flowing in both
directions on the M20 in the event of disruption to freight and other transport across
the Channel. It would also thereby alleviate traffic congestion across the neighbouring
strategic and local road network. The deployment of the M26 to queue Heavy Goods Vehicles
(HGVs) temporarily will only be done in the unlikely event that capacity has been
exceeded elsewhere under Brock contingency planning. The routes that HGVs will be
directed to travel under Brock will be clearly signposted, and have been designed
to minimise disruption on other roads, such as the M25, as much as possible.</p><p>
</p>
|
|