Linked Data API

Show Search Form

Search Results

1126212
registered interest false more like this
date less than 2019-05-13more like thismore than 2019-05-13
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Driving Licences more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, in the event that a UK driving test is taken and failed before a 12 month international licence expires, whether that international licence is revoked in the UK. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 253577 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-05-21more like thismore than 2019-05-21
answer text <p>In Great Britain, the law allows new residents with valid driving licences issued by countries outside the EU/European Economic Area (EEA) to drive for up to one year from the date they become a resident. Driver licensing is a devolved matter in Northern Ireland.</p><p> </p><p>In order to be able to take a driving test here, new residents must apply for a provisional GB licence. However, the law does not allow for their original, third country driving licence to be invalidated if they do not pass the test. This means they can continue to drive using the third country licence until the one year period expires.</p><p> </p><p>If a driver has not passed a test here within the one year period, they must then stop driving once this has elapsed. Although they can continue to drive as a GB provisional licence holder, provided that they adhere to the rules applying to provisional licences.</p><p> </p><p>Driving licences issued by EU and EEA member states are mutually recognised and can be exchanged without the need to take a test.</p><p> </p><p> </p>
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman more like this
question first answered
less than 2019-05-21T10:13:48.42Zmore like thismore than 2019-05-21T10:13:48.42Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this
1054639
registered interest false more like this
date less than 2019-02-04more like thismore than 2019-02-04
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading High Speed 2 Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what the most recent assessment is of the benefit cost ratio for phase 2B of HS2; and whether an assessment has been made of the potential merits of running 14 trains an hour at 195mph. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 216275 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-02-07more like thismore than 2019-02-07
answer text <p>HS2 Phase 2b is estimated as delivering high value for money, with a Benefit-Cost Ratio including Wider Economic Impacts (WEIs) of 2.6 and a BCR excluding WEIs of 2.1. This analysis was presented in the Phase 2 Economic Case in 2017.</p><p><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/634196/high-speed-two-phase-two-economic-case.pdf" target="_blank">https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/634196/high-speed-two-phase-two-economic-case.pdf</a></p><p> </p><p>The business case for Phase 2b assumes that up to 18 trains per hour will run on the HS2 core network at speeds of up to 225mph (360km/h). HS2 Ltd is working to the scope of the project as set out by Government. If any changes were made to these requirements then there would be an assessment of the potential impact on the business case and this work would be published.</p> more like this
answering member constituency Wealden more like this
answering member printed Ms Nusrat Ghani more like this
question first answered
less than 2019-02-07T11:34:42.533Zmore like thismore than 2019-02-07T11:34:42.533Z
answering member
4460
label Biography information for Ms Nusrat Ghani more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this
882476
registered interest false more like this
date less than 2018-04-13more like thismore than 2018-04-13
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Railways: East Midlands more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what assessment he has made of the potential merits of increasing the number of stopping services at East Midlands Parkway to support the growth of (a) the East Midlands Airport and (b) the economy in that region; and if he will make an assessment of the potential merits of specifying an increase in the number of stopping services at that station in the upcoming tender for that franchise in order to better serve passengers using East Midlands Airport. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 135538 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-04-23more like thismore than 2018-04-23
answer text <p>The Government and rail industry are investing in the biggest improvement in rail travel since the Victorian era, including through the upgrade of the Midland Main Line. This programme will improve rail journeys for passengers using the Midland Main Line to travel into London St Pancras.</p><p> </p><p>In developing the specification for the next East Midlands franchise it is important that airport passenger services are properly considered. We are considering options for future rail services to and from East Midlands Parkway and my Department has engaged with East Midlands Airport to understand their proposals. In our public consultation, held last summer, we asked stakeholders how the train service could be better at meeting the needs of passengers travelling to and from airports within the East Midlands.</p><p> </p><p>The consultation closed on 11 October 2017. All options for rail services in the next franchise are subject to analysis of the potential benefits and the outcome of our consultation with stakeholders. Thus, no decisions have been made on rail services that will be specified for the next franchise. Any outcome will seek to secure the best value for money for the taxpayer and be in the best interests of rail passengers.</p><p> </p><p>The next franchise is planned to start in August 2019. Invitations to Tender (ITT) are due to be issued to potential bidders later this year. The ITT will set out the minimum requirements and provide the baseline that we expect the next franchise to build on.</p><p> </p><p> </p>
answering member constituency Orpington more like this
answering member printed Joseph Johnson more like this
question first answered
less than 2018-04-23T14:41:46.85Zmore like thismore than 2018-04-23T14:41:46.85Z
answering member
4039
label Biography information for Lord Johnson of Marylebone more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this
528947
registered interest false more like this
date less than 2016-06-27more like thismore than 2016-06-27
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading High Speed 2 Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, when he expects HS2 Ltd to implement discretionary arrangements to assist property owners affected by the High Speed 2 route. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 41281 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2016-07-01more like thismore than 2016-07-01
answer text <p>The long-term discretionary assistance schemes are available for the London to West Midlands (Phase One) and the West Midlands to Crewe (Phase 2a) sections of HS2. The interim Exceptional Hardship Scheme (EHS) is available for the remainder of the route (Phase 2b). A consultation on the long-term discretionary compensation and assistance schemes to replace the EHS for Phase 2b will be launched at the time of the route announcement in autumn this year.</p><p> </p> more like this
answering member constituency Scarborough and Whitby more like this
answering member printed Mr Robert Goodwill more like this
question first answered
less than 2016-07-01T10:43:32.463Zmore like thismore than 2016-07-01T10:43:32.463Z
answering member
1562
label Biography information for Sir Robert Goodwill more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this
425000
registered interest false more like this
date less than 2015-10-29more like thismore than 2015-10-29
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Aviation: Passengers more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what provisions are in place to enable airports to ban passengers from their premises; under what circumstances such provisions may be used; and how many passengers were banned from (a) Leeds Bradford International, (b) Belfast International, (c) East Midlands, (d) Edinburgh, (e) Glasgow International, (f) Manchester, (g) Newcastle International, (h) London Gatwick, (i) London Luton, (j) London Stansted and (k) London Heathrow Airport in each year from 2010 to 2015 to date. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 13987 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2015-11-04more like thismore than 2015-11-04
answer text <p><strong></strong></p><p>An airport company may prohibit a person from entering the Airport under provisions in their byelaws.</p><br /><p>As this is a matter for the airport concerned the Department does not hold details of any person so prohibited.</p> more like this
answering member constituency Scarborough and Whitby more like this
answering member printed Mr Robert Goodwill more like this
question first answered
less than 2015-11-04T16:10:06.83Zmore like thismore than 2015-11-04T16:10:06.83Z
answering member
1562
label Biography information for Sir Robert Goodwill more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this
417795
registered interest false more like this
date less than 2015-09-08more like thismore than 2015-09-08
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Road Traffic Offences: Speed Limits more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what comparative assessment his Department has made of methods used in other European countries to detect and prevent speeding offences. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 9353 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2015-09-15more like thismore than 2015-09-15
answer text <p>The Department has not carried out a formal comparative assessment of methods used in other European countries to detect and prevent speeding. However, the Department does have ongoing discussions with other Member States on road safety issues, including tackling speed. The Department also regularly requests European comparisons when carrying out research into road safety topics.</p><p> </p> more like this
answering member constituency Harrogate and Knaresborough more like this
answering member printed Andrew Jones more like this
question first answered
less than 2015-09-15T14:04:40.38Zmore like thismore than 2015-09-15T14:04:40.38Z
answering member
3996
label Biography information for Andrew Jones more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this
226770
registered interest true more like this
date less than 2015-03-11more like thismore than 2015-03-11
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Railways: North of England more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, if he will commission a strategic environmental assessment of the proposal for a High Speed 3 line between Leeds and Manchester. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 227131 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2015-03-18more like thismore than 2015-03-18
answer text <p>The Government is still developing and considering proposals for High Speed 3 (HS3). As such it is too early to say whether or not we would complete a strategic environmental assessment. As we move ahead with HS3, we will ensure that an appropriate approach is taken to assessing environmental impacts and considering alternatives, and that any proposed scheme is developed in line with relevant domestic and European legislation.</p><p> </p><p> </p> more like this
answering member constituency Scarborough and Whitby more like this
answering member printed Mr Robert Goodwill more like this
question first answered
less than 2015-03-18T11:19:01.84Zmore like thismore than 2015-03-18T11:19:01.84Z
answering member
1562
label Biography information for Sir Robert Goodwill more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this
226771
registered interest true more like this
date less than 2015-03-11more like thismore than 2015-03-11
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading High Speed 2 Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what changes to the proposed route alignment of High Speed 2 have resulted from feedback received during the High Speed 2 Community Forum process. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 227132 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2015-03-17more like thismore than 2015-03-17
answer text <p>In developing the route alignment for HS2 Phase One a wide variety of suggestions have been considered from many different sources, including the Community Forums. The main local alternatives considered are described in the Environmental Statement published in November 2013. These can be found in section 2.6 in each of the Volume 2 Community Forum area reports. Given the scale of suggestions received it would not be possible or practical to identify those changes that are a direct result of the Community Forums alone.</p> more like this
answering member constituency Scarborough and Whitby more like this
answering member printed Mr Robert Goodwill more like this
question first answered
less than 2015-03-17T15:36:01.953Zmore like thismore than 2015-03-17T15:36:01.953Z
answering member
1562
label Biography information for Sir Robert Goodwill more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this
226778
registered interest true more like this
date less than 2015-03-11more like thismore than 2015-03-11
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading High Speed 2 Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what arrangements are in place to correct errors of fact in the High Speed 2 Phase One Environment Statement. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 227325 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2015-03-17more like thismore than 2015-03-17
answer text <p>The HS2 Phase One Environment Statement, as deposited in November 2013, was peer reviewed by experts in their field to ensure it was of the highest quality. The subsequent consultation allowed the public to comment on its content and issues contained in the responses received were included in the report by Parliament’s Independent Assessor, which was laid in the House of Commons on 9 April 2014. Where new information has become available through consultation responses that might give rise to new likely significant effects, these effects will be brought before Parliament through a Supplementary Environmental Statement in accordance with the Standing Orders of the House.</p> more like this
answering member constituency Scarborough and Whitby more like this
answering member printed Mr Robert Goodwill more like this
question first answered
less than 2015-03-17T15:39:45.267Zmore like thismore than 2015-03-17T15:39:45.267Z
answering member
1562
label Biography information for Sir Robert Goodwill more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this
48038
registered interest true more like this
date less than 2014-04-09more like thismore than 2014-04-09
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, how much he estimates will have to be spent protecting the High Speed 2 track on phase 1 and phase 2 against the effects of mining subsidence; and whether that sum is included in the overall projected cost. more like this
tabling member constituency North West Leicestershire more like this
tabling member printed
Andrew Bridgen remove filter
uin 196117 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2014-05-01more like thismore than 2014-05-01
answer text <p> </p><p>On Phase One there are no specific allowances relating to mining subsidence in the cost estimate as there is no active mining below the route, nor any recorded abandoned mining shown in the publically available records that have been researched. Physical ground investigations and desktop studies of existing of records will be undertaken prior to construction of the railway, and allowances have been made in both the cost estimate and the project contingency for any ground treatments that are identified.</p><p> </p><p>On Phase Two there is an allowance within the cost estimate for the risks around crossing open cast quarries, mines and landfill sites and the current level of design reflects where appropriate the difficulty of crossing these type of areas.</p> more like this
answering member constituency Scarborough and Whitby more like this
answering member printed Mr Robert Goodwill more like this
question first answered
less than 2014-05-01T12:00:00.00Zmore like thismore than 2014-05-01T12:00:00.00Z
answering member
1562
label Biography information for Sir Robert Goodwill more like this
tabling member
4133
label Biography information for Andrew Bridgen more like this