92068
registered interest false more like this
date less than 2014-09-26more like thismore than 2014-09-26
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading A12 more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps he is taking to improve road safety on the A12 from Junction 28 of the M25 to Ipswich. more like this
tabling member constituency Chelmsford more like this
tabling member printed
Mr Simon Burns more like this
uin 209573 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2014-10-15more like thismore than 2014-10-15
answer text <p>The Highways Agency takes road safety very seriously and they monitor the safety of the A12 trunk road as well as all other routes on the strategic road network.</p><p> </p><p>The Agency is committed to delivering four safety improvement schemes on the A12 this financial year valued at approximately £2.1million. Two of these are being delivered through the national Pinch Point Programme.</p><p> </p><p>Tackling congestion and improving the performance of the strategic road network is also a key factor to improving safety. The Highways Agency is continuing to develop Stage 2 of the East of England Route Strategy, which includes the A12, and is due to be completed by spring 2015. Following completion of evidence gathering Stage 1 in April, the Agency is now undertaking a series of studies based on that evidence which will form outline business cases for tackling congestion, improving performance and ultimately improving safety on the strategic road network.</p><p> </p> more like this
answering member constituency South Holland and The Deepings more like this
answering member printed Mr John Hayes more like this
question first answered
less than 2014-10-15T10:11:18.1415983Zmore like thismore than 2014-10-15T10:11:18.1415983Z
answering member
350
label Biography information for Sir John Hayes more like this
tabling member
46
label Biography information for Sir Simon Burns more like this
92070
registered interest false more like this
date less than 2014-09-26more like thismore than 2014-09-26
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading A12 more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, how many road traffic accidents there were on the A12 from Junction 28 of the M25 to Ipswich in each of the last three years. more like this
tabling member constituency Chelmsford more like this
tabling member printed
Mr Simon Burns more like this
uin 209598 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2014-10-15more like thismore than 2014-10-15
answer text <p>The 2011, 2012 and 2013 statistics for road traffic accidents on the A12 from its junction with the M25 (junction 28) to its junction with the A14 (junction 55, near Ipswich) are set out in the table below:</p><p> </p><table><tbody><tr><td><p>Year</p></td><td><p>Collisions</p></td></tr><tr><td><p>2011</p></td><td><p>150</p></td></tr><tr><td><p>2012</p></td><td><p>141</p></td></tr><tr><td><p>2013</p></td><td><p>154</p></td></tr></tbody></table><p> </p><p>There is no requirement for accidents resulting in damage only to be reported to the police and therefore this data is not included.</p><p> </p><p> </p> more like this
answering member constituency South Holland and The Deepings more like this
answering member printed Mr John Hayes more like this
question first answered
less than 2014-10-15T10:16:50.2239721Zmore like thismore than 2014-10-15T10:16:50.2239721Z
answering member
350
label Biography information for Sir John Hayes more like this
tabling member
46
label Biography information for Sir Simon Burns more like this
92129
registered interest false more like this
date less than 2014-09-26more like thismore than 2014-09-26
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading A12 more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, how many (a) deaths and (b) injuries occurred as a result of road traffic accidents on the A12 from Junction 28 of the M25 to Ipswich in each of the last three years. more like this
tabling member constituency Chelmsford more like this
tabling member printed
Mr Simon Burns more like this
uin 209599 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2014-10-15more like thismore than 2014-10-15
answer text <p>The 2011, 2012 and 2013 statistics for fatal, serious and slight injuries occurring as a result of road traffic accidents on the A12 from its junction with the M25 (junction 28) to its junction with the A14 (junction 55, near Ipswich) are set out in the table below:</p><p> </p><table><tbody><tr><td colspan="4"> </td><td><p> </p></td></tr><tr><td><p> </p></td><td><p>Fatal</p></td><td><p>Serious</p></td><td><p>Slight</p></td><td> </td></tr><tr><td><p>2011</p></td><td><p>5</p></td><td><p>32</p></td><td><p>201</p></td><td> </td></tr><tr><td><p>2012</p></td><td><p>2</p></td><td><p>18</p></td><td><p>178</p></td><td> </td></tr><tr><td><p>2013</p></td><td><p>3</p></td><td><p>23</p></td><td><p>185</p></td><td> </td></tr></tbody></table><p> </p> more like this
answering member constituency South Holland and The Deepings more like this
answering member printed Mr John Hayes more like this
question first answered
less than 2014-10-15T10:25:40.0019064Zmore like thismore than 2014-10-15T10:25:40.0019064Z
answering member
350
label Biography information for Sir John Hayes more like this
tabling member
46
label Biography information for Sir Simon Burns more like this
89836
registered interest false more like this
date less than 2014-08-29more like thismore than 2014-08-29
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Railways: Repairs and Maintenance more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what sanctions are taken against Network Rail when engineering works overrun causing disruption to the rail network. more like this
tabling member constituency Chelmsford more like this
tabling member printed
Mr Simon Burns more like this
uin 207448 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2014-09-03more like thismore than 2014-09-03
answer text <p> </p><p>Network Rail is responsible for the day to day operation of the rail network and the delivery of enhancements. The independent regulator, the Office of Rail Regulation (ORR) will continue to monitor closely Network Rail’s performance delivery on the Anglia route, which will cover all the causes of delay, including the impact of overrunning engineering works.</p><p> </p><p>The Track Access Contracts between Network Rail and train operators provide for Network Rail to pay compensation to an operator in the event that train services cannot operate or are delayed due to engineering works or disruption outside that operator’s control. The Department for Transport does not hold details of the timing or number of such payments, which are a commercial matter between the parties directly concerned, overseen by the ORR. The ORR publishes the annual totals of these payments at route level on its data portal:</p><p> </p><p><a href="https://dataportal.orr.gov.uk/displayreport/report/html/345da3b9-b9ac-449a-aace-8298c5b39e2b" target="_blank">https://dataportal.orr.gov.uk/displayreport/report/html/345da3b9-b9ac-449a-aace-8298c5b39e2b</a></p><p> </p><p>The ORR concluded its assessment of Network Rail’s performance between 2009 and 2014 in July. Since Network Rail did not deliver its funded obligations, and to address issues which have disrupted services for passengers, the company has committed at least £25m extra funds to improve the resilience of the network in London and the South East, with plans to be in place by December. In the Long Distance sector, the company fell significantly short of its funded target. Under an order made by the ORR in 2012, taking account of issues beyond Network Rail's control, the company has been asked to return £53.1m to funders for failure to deliver its agreed obligations in 2013-14. The Government is reinvesting this sum to improve on-train mobile services for passengers.</p><p> </p><p> </p>
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
grouped question UIN
207446 more like this
207447 more like this
207449 more like this
question first answered
less than 2014-09-03T16:36:30.9073653Zmore like thismore than 2014-09-03T16:36:30.9073653Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
46
label Biography information for Sir Simon Burns more like this
89837
registered interest false more like this
date less than 2014-08-29more like thismore than 2014-08-29
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Great Eastern Main Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps are being taken to minimise the overrunning of engineering works on the London Liverpool Street - Chelmsford - Colchester - Ipswich railway line. more like this
tabling member constituency Chelmsford more like this
tabling member printed
Mr Simon Burns more like this
uin 207449 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2014-09-03more like thismore than 2014-09-03
answer text <p> </p><p>Network Rail is responsible for the day to day operation of the rail network and the delivery of enhancements. The independent regulator, the Office of Rail Regulation (ORR) will continue to monitor closely Network Rail’s performance delivery on the Anglia route, which will cover all the causes of delay, including the impact of overrunning engineering works.</p><p> </p><p>The Track Access Contracts between Network Rail and train operators provide for Network Rail to pay compensation to an operator in the event that train services cannot operate or are delayed due to engineering works or disruption outside that operator’s control. The Department for Transport does not hold details of the timing or number of such payments, which are a commercial matter between the parties directly concerned, overseen by the ORR. The ORR publishes the annual totals of these payments at route level on its data portal:</p><p> </p><p><a href="https://dataportal.orr.gov.uk/displayreport/report/html/345da3b9-b9ac-449a-aace-8298c5b39e2b" target="_blank">https://dataportal.orr.gov.uk/displayreport/report/html/345da3b9-b9ac-449a-aace-8298c5b39e2b</a></p><p> </p><p>The ORR concluded its assessment of Network Rail’s performance between 2009 and 2014 in July. Since Network Rail did not deliver its funded obligations, and to address issues which have disrupted services for passengers, the company has committed at least £25m extra funds to improve the resilience of the network in London and the South East, with plans to be in place by December. In the Long Distance sector, the company fell significantly short of its funded target. Under an order made by the ORR in 2012, taking account of issues beyond Network Rail's control, the company has been asked to return £53.1m to funders for failure to deliver its agreed obligations in 2013-14. The Government is reinvesting this sum to improve on-train mobile services for passengers.</p><p> </p><p> </p>
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
grouped question UIN
207446 more like this
207447 more like this
207448 more like this
question first answered
less than 2014-09-03T16:36:30.9699113Zmore like thismore than 2014-09-03T16:36:30.9699113Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
46
label Biography information for Sir Simon Burns more like this
89838
registered interest false more like this
date less than 2014-08-29more like thismore than 2014-08-29
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Great Eastern Main Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what sanctions have been imposed on Network Rail as a result of engineering works overrunning and causing disruption to the rail service on the London Liverpool Street - Chelmsford - Colchester - Ipswich railway line in the last five years. more like this
tabling member constituency Chelmsford more like this
tabling member printed
Mr Simon Burns more like this
uin 207446 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2014-09-03more like thismore than 2014-09-03
answer text <p> </p><p>Network Rail is responsible for the day to day operation of the rail network and the delivery of enhancements. The independent regulator, the Office of Rail Regulation (ORR) will continue to monitor closely Network Rail’s performance delivery on the Anglia route, which will cover all the causes of delay, including the impact of overrunning engineering works.</p><p> </p><p>The Track Access Contracts between Network Rail and train operators provide for Network Rail to pay compensation to an operator in the event that train services cannot operate or are delayed due to engineering works or disruption outside that operator’s control. The Department for Transport does not hold details of the timing or number of such payments, which are a commercial matter between the parties directly concerned, overseen by the ORR. The ORR publishes the annual totals of these payments at route level on its data portal:</p><p> </p><p><a href="https://dataportal.orr.gov.uk/displayreport/report/html/345da3b9-b9ac-449a-aace-8298c5b39e2b" target="_blank">https://dataportal.orr.gov.uk/displayreport/report/html/345da3b9-b9ac-449a-aace-8298c5b39e2b</a></p><p> </p><p>The ORR concluded its assessment of Network Rail’s performance between 2009 and 2014 in July. Since Network Rail did not deliver its funded obligations, and to address issues which have disrupted services for passengers, the company has committed at least £25m extra funds to improve the resilience of the network in London and the South East, with plans to be in place by December. In the Long Distance sector, the company fell significantly short of its funded target. Under an order made by the ORR in 2012, taking account of issues beyond Network Rail's control, the company has been asked to return £53.1m to funders for failure to deliver its agreed obligations in 2013-14. The Government is reinvesting this sum to improve on-train mobile services for passengers.</p><p> </p><p> </p>
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
grouped question UIN
207447 more like this
207448 more like this
207449 more like this
question first answered
less than 2014-09-03T16:36:30.7808744Zmore like thismore than 2014-09-03T16:36:30.7808744Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
46
label Biography information for Sir Simon Burns more like this
89839
registered interest false more like this
date less than 2014-08-29more like thismore than 2014-08-29
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Great Eastern Main Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, on how many occasions engineering works carried out by Network Rail on the London Liverpool Street - Chelmsford - Colchester - Ipswich railway line have overrun causing disruption to the service in each of the last five years. more like this
tabling member constituency Chelmsford more like this
tabling member printed
Mr Simon Burns more like this
uin 207447 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2014-09-03more like thismore than 2014-09-03
answer text <p> </p><p>Network Rail is responsible for the day to day operation of the rail network and the delivery of enhancements. The independent regulator, the Office of Rail Regulation (ORR) will continue to monitor closely Network Rail’s performance delivery on the Anglia route, which will cover all the causes of delay, including the impact of overrunning engineering works.</p><p> </p><p>The Track Access Contracts between Network Rail and train operators provide for Network Rail to pay compensation to an operator in the event that train services cannot operate or are delayed due to engineering works or disruption outside that operator’s control. The Department for Transport does not hold details of the timing or number of such payments, which are a commercial matter between the parties directly concerned, overseen by the ORR. The ORR publishes the annual totals of these payments at route level on its data portal:</p><p> </p><p><a href="https://dataportal.orr.gov.uk/displayreport/report/html/345da3b9-b9ac-449a-aace-8298c5b39e2b" target="_blank">https://dataportal.orr.gov.uk/displayreport/report/html/345da3b9-b9ac-449a-aace-8298c5b39e2b</a></p><p> </p><p>The ORR concluded its assessment of Network Rail’s performance between 2009 and 2014 in July. Since Network Rail did not deliver its funded obligations, and to address issues which have disrupted services for passengers, the company has committed at least £25m extra funds to improve the resilience of the network in London and the South East, with plans to be in place by December. In the Long Distance sector, the company fell significantly short of its funded target. Under an order made by the ORR in 2012, taking account of issues beyond Network Rail's control, the company has been asked to return £53.1m to funders for failure to deliver its agreed obligations in 2013-14. The Government is reinvesting this sum to improve on-train mobile services for passengers.</p><p> </p><p> </p>
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
grouped question UIN
207446 more like this
207448 more like this
207449 more like this
question first answered
less than 2014-09-03T16:36:30.8448457Zmore like thismore than 2014-09-03T16:36:30.8448457Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
46
label Biography information for Sir Simon Burns more like this
43460
registered interest false more like this
date less than 2014-03-17more like thismore than 2014-03-17
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what the average change in rail fares was between Chelmsford and London in each of the last five years. more like this
tabling member constituency Chelmsford more like this
tabling member printed
Mr Simon Burns more like this
uin 192303 more like this
answer
answer
is ministerial correction false remove filter
date of answer less than 2014-03-24more like thismore than 2014-03-24
answer text <p> </p><p>The Office of Rail Regulation publishes information on average changes in rail fares by sector and ticket category on their website:</p><p><a href="http://dataportal.orr.gov.uk/displayreport/report/html/7cff3127-a5cc-4173-ac78-016db2339811" target="_blank">http://dataportal.orr.gov.uk/displayreport/report/html/7cff3127-a5cc-4173-ac78-016db2339811</a>.</p><p> </p><p> </p><p> </p><p>However, I am able to provide information on the change in costs of an annual season ticket from Chelmsford to London Terminals over the last five years, as below:</p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><table><tbody><tr><td> </td><td><p>Annual season ticket from Chelmsford to London Terminals</p><p> </p></td><td><p>% change from previous year</p><p> </p></td></tr><tr><td><p>2010</p><p> </p></td><td><p>£3,120</p><p> </p></td><td> </td></tr><tr><td><p>2011</p><p> </p></td><td><p>£3,260</p><p> </p></td><td><p>4.5%</p><p> </p></td></tr><tr><td><p>2012</p><p> </p></td><td><p>£3,420</p><p> </p></td><td><p>4.9%</p><p> </p></td></tr><tr><td><p>2013</p><p> </p></td><td><p>£3,540</p><p> </p></td><td><p>3.5%</p><p> </p></td></tr><tr><td><p>2014</p><p> </p></td><td><p>£3,640</p><p> </p></td><td><p>2.8%</p><p> </p></td></tr></tbody></table><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p>
answering member constituency Wimbledon more like this
answering member printed Stephen Hammond more like this
question first answered
less than 2014-03-24T12:00:00.00Zmore like thismore than 2014-03-24T12:00:00.00Z
answering member
1585
label Biography information for Stephen Hammond more like this
tabling member
46
label Biography information for Sir Simon Burns more like this