{ "format" : "linked-data-api", "version" : "0.2", "result" : {"_about" : "http://eldaddp.azurewebsites.net/answeredquestions.text?answer.groupedQuestionUIN.=HL2279", "definition" : "http://eldaddp.azurewebsites.net/meta/answeredquestions.text?answer.groupedQuestionUIN.=HL2279", "extendedMetadataVersion" : "http://eldaddp.azurewebsites.net/answeredquestions.text?answer.groupedQuestionUIN.=HL2279&_metadata=all", "first" : "http://eldaddp.azurewebsites.net/answeredquestions.text?_page=0&answer.groupedQuestionUIN.=HL2279", "hasPart" : "http://eldaddp.azurewebsites.net/answeredquestions.text?answer.groupedQuestionUIN.=HL2279", "isPartOf" : "http://eldaddp.azurewebsites.net/answeredquestions.text?answer.groupedQuestionUIN.=HL2279", "items" : [{"_about" : "http://data.parliament.uk/resources/1183447", "AnsweringBody" : [{"_value" : "Department for Digital, Culture, Media and Sport"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/1183447/answer", "answerText" : {"_value" : "

The Government announced on 9 March that it had agreed a deal with the mobile network operators to deliver the Shared Rural Network programme. This will see Government and industry jointly invest to increase 4G mobile coverage throughout the UK to 95% geographic coverage by end-2025. Coverage is based on Ofcom\u2019s definition of good quality 4G coverage, which is the minimum signal strength required to deliver a 90-second telephone call and a download speed of at least 2Mbit/s, 95% of the time.<\/p>

The Shared Rural Network is underpinned by legally binding coverage commitments from each operator to have reached at least 90%, which will be assessed in 2026. Ofcom will regularly report on coverage improvements towards this goal through its Connected Nations report.<\/p>

Exact site deployment plans will be managed by the operators themselves in order for them to best deliver the agreed coverage outcomes. However, we expect that consumers will feel the benefit of the programme long before its conclusion and the operators will consult with communities as roll out plans become clearer.<\/p>

While the biggest improvements in coverage arising from the Shared Rural Network will be in Scotland and Wales, there will be improvements across all four nations. 4G geographic coverage in England is currently 97% from at least one operator and 81% from all four operators. As a result of the programme, this will increase to 98% coverage from at least one operator, and 90% from all four by end-2025.<\/p>

The Shared Rural Network will help close the digital divide between urban and rural areas by improving mobile coverage in largely rural areas across the whole of the UK. The programme is not directly aimed at improving coverage in dense inner-city areas such as the West End of London which, typically, have good 4G coverage from all four operators, and it will remain a commercial decision for operators to decide whether to improve coverage in such areas.<\/p>

We are aware of the European Commission\u2019s Digital Economy and Society Index report 2019, which compares 4G coverage of homes across Member States. The report, available via the following link, https://ec.europa.eu/digital-single-market/en/desi<\/a> suggests that in 2018, based on an average of operator coverage, there was 98% 4G coverage of UK homes. This compared to 95% for France, and an EU average of 94%. The Shared Rural Network will help to improve our European standing by providing additional coverage to 280,000 premises.<\/p>

While the vast majority of commercial rollout of 5G services will be delivered by industry and according to their own timeframes, government is committed to being a world leader in 5G technology and providing a 5G signal to a majority of the population by 2027. The Government is investing in a nationally coordinated programme of 5G testbed facilities and application trials to help achieve this, and has allocated £200 million from the National Productivity Investment Fund to the 5G Programme, which launched in 2017 and will run until March 2022.<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/4703", "label" : {"_value" : "Biography information for Baroness Barran"} } , "answeringMemberPrinted" : {"_value" : "Baroness Barran"} , "dateOfAnswer" : {"_value" : "2020-03-16", "_datatype" : "dateTime"} , "groupedQuestionUIN" : [{"_value" : "HL2278"} , {"_value" : "HL2279"} , {"_value" : "HL2280"} , {"_value" : "HL2281"} , {"_value" : "HL2282"} , {"_value" : "HL2283"} ], "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2020-03-16T16:31:57.967Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "10"} , "answeringDeptShortName" : {"_value" : "Digital, Culture, Media and Sport"} , "answeringDeptSortName" : {"_value" : "Digital, Culture, Media and Sport"} , "date" : {"_value" : "2020-03-09", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "4G: Rural Areas"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty's Government what comparison they have made of 4G signal strength and reliability between rural areas in (1) England, and (2) France.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/3830", "label" : {"_value" : "Biography information for Lord Mawson"} } , "tablingMemberPrinted" : [{"_value" : "Lord Mawson"} ], "uin" : "HL2350"} , {"_about" : "http://data.parliament.uk/resources/1183186", "AnsweringBody" : [{"_value" : "Department for Digital, Culture, Media and Sport"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/1183186/answer", "answerText" : {"_value" : "

The Government announced on 9 March that it had agreed a deal with the mobile network operators to deliver the Shared Rural Network programme. This will see Government and industry jointly invest to increase 4G mobile coverage throughout the UK to 95% geographic coverage by end-2025. Coverage is based on Ofcom\u2019s definition of good quality 4G coverage, which is the minimum signal strength required to deliver a 90-second telephone call and a download speed of at least 2Mbit/s, 95% of the time.<\/p>

The Shared Rural Network is underpinned by legally binding coverage commitments from each operator to have reached at least 90%, which will be assessed in 2026. Ofcom will regularly report on coverage improvements towards this goal through its Connected Nations report.<\/p>

Exact site deployment plans will be managed by the operators themselves in order for them to best deliver the agreed coverage outcomes. However, we expect that consumers will feel the benefit of the programme long before its conclusion and the operators will consult with communities as roll out plans become clearer.<\/p>

While the biggest improvements in coverage arising from the Shared Rural Network will be in Scotland and Wales, there will be improvements across all four nations. 4G geographic coverage in England is currently 97% from at least one operator and 81% from all four operators. As a result of the programme, this will increase to 98% coverage from at least one operator, and 90% from all four by end-2025.<\/p>

The Shared Rural Network will help close the digital divide between urban and rural areas by improving mobile coverage in largely rural areas across the whole of the UK. The programme is not directly aimed at improving coverage in dense inner-city areas such as the West End of London which, typically, have good 4G coverage from all four operators, and it will remain a commercial decision for operators to decide whether to improve coverage in such areas.<\/p>

We are aware of the European Commission\u2019s Digital Economy and Society Index report 2019, which compares 4G coverage of homes across Member States. The report, available via the following link, https://ec.europa.eu/digital-single-market/en/desi<\/a> suggests that in 2018, based on an average of operator coverage, there was 98% 4G coverage of UK homes. This compared to 95% for France, and an EU average of 94%. The Shared Rural Network will help to improve our European standing by providing additional coverage to 280,000 premises.<\/p>

While the vast majority of commercial rollout of 5G services will be delivered by industry and according to their own timeframes, government is committed to being a world leader in 5G technology and providing a 5G signal to a majority of the population by 2027. The Government is investing in a nationally coordinated programme of 5G testbed facilities and application trials to help achieve this, and has allocated £200 million from the National Productivity Investment Fund to the 5G Programme, which launched in 2017 and will run until March 2022.<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/4703", "label" : {"_value" : "Biography information for Baroness Barran"} } , "answeringMemberPrinted" : {"_value" : "Baroness Barran"} , "dateOfAnswer" : {"_value" : "2020-03-16", "_datatype" : "dateTime"} , "groupedQuestionUIN" : [{"_value" : "HL2279"} , {"_value" : "HL2280"} , {"_value" : "HL2281"} , {"_value" : "HL2282"} , {"_value" : "HL2283"} , {"_value" : "HL2350"} ], "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2020-03-16T16:31:57.607Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "10"} , "answeringDeptShortName" : {"_value" : "Digital, Culture, Media and Sport"} , "answeringDeptSortName" : {"_value" : "Digital, Culture, Media and Sport"} , "date" : {"_value" : "2020-03-05", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "4G"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty's Government what percentage of England is covered by 4G.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/3830", "label" : {"_value" : "Biography information for Lord Mawson"} } , "tablingMemberPrinted" : [{"_value" : "Lord Mawson"} ], "uin" : "HL2278"} , {"_about" : "http://data.parliament.uk/resources/1183188", "AnsweringBody" : [{"_value" : "Department for Digital, Culture, Media and Sport"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/1183188/answer", "answerText" : {"_value" : "

The Government announced on 9 March that it had agreed a deal with the mobile network operators to deliver the Shared Rural Network programme. This will see Government and industry jointly invest to increase 4G mobile coverage throughout the UK to 95% geographic coverage by end-2025. Coverage is based on Ofcom\u2019s definition of good quality 4G coverage, which is the minimum signal strength required to deliver a 90-second telephone call and a download speed of at least 2Mbit/s, 95% of the time.<\/p>

The Shared Rural Network is underpinned by legally binding coverage commitments from each operator to have reached at least 90%, which will be assessed in 2026. Ofcom will regularly report on coverage improvements towards this goal through its Connected Nations report.<\/p>

Exact site deployment plans will be managed by the operators themselves in order for them to best deliver the agreed coverage outcomes. However, we expect that consumers will feel the benefit of the programme long before its conclusion and the operators will consult with communities as roll out plans become clearer.<\/p>

While the biggest improvements in coverage arising from the Shared Rural Network will be in Scotland and Wales, there will be improvements across all four nations. 4G geographic coverage in England is currently 97% from at least one operator and 81% from all four operators. As a result of the programme, this will increase to 98% coverage from at least one operator, and 90% from all four by end-2025.<\/p>

The Shared Rural Network will help close the digital divide between urban and rural areas by improving mobile coverage in largely rural areas across the whole of the UK. The programme is not directly aimed at improving coverage in dense inner-city areas such as the West End of London which, typically, have good 4G coverage from all four operators, and it will remain a commercial decision for operators to decide whether to improve coverage in such areas.<\/p>

We are aware of the European Commission\u2019s Digital Economy and Society Index report 2019, which compares 4G coverage of homes across Member States. The report, available via the following link, https://ec.europa.eu/digital-single-market/en/desi<\/a> suggests that in 2018, based on an average of operator coverage, there was 98% 4G coverage of UK homes. This compared to 95% for France, and an EU average of 94%. The Shared Rural Network will help to improve our European standing by providing additional coverage to 280,000 premises.<\/p>

While the vast majority of commercial rollout of 5G services will be delivered by industry and according to their own timeframes, government is committed to being a world leader in 5G technology and providing a 5G signal to a majority of the population by 2027. The Government is investing in a nationally coordinated programme of 5G testbed facilities and application trials to help achieve this, and has allocated £200 million from the National Productivity Investment Fund to the 5G Programme, which launched in 2017 and will run until March 2022.<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/4703", "label" : {"_value" : "Biography information for Baroness Barran"} } , "answeringMemberPrinted" : {"_value" : "Baroness Barran"} , "dateOfAnswer" : {"_value" : "2020-03-16", "_datatype" : "dateTime"} , "groupedQuestionUIN" : [{"_value" : "HL2278"} , {"_value" : "HL2279"} , {"_value" : "HL2281"} , {"_value" : "HL2282"} , {"_value" : "HL2283"} , {"_value" : "HL2350"} ], "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2020-03-16T16:31:57.747Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "10"} , "answeringDeptShortName" : {"_value" : "Digital, Culture, Media and Sport"} , "answeringDeptSortName" : {"_value" : "Digital, Culture, Media and Sport"} , "date" : {"_value" : "2020-03-05", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "4G: Greater London"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty's Government what percentage of London has reliable 4G coverage; and how that percentage compares to the reliability of such coverage in Paris.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/3830", "label" : {"_value" : "Biography information for Lord Mawson"} } , "tablingMemberPrinted" : [{"_value" : "Lord Mawson"} ], "uin" : "HL2280"} , {"_about" : "http://data.parliament.uk/resources/1183189", "AnsweringBody" : [{"_value" : "Department for Digital, Culture, Media and Sport"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/1183189/answer", "answerText" : {"_value" : "

The Government announced on 9 March that it had agreed a deal with the mobile network operators to deliver the Shared Rural Network programme. This will see Government and industry jointly invest to increase 4G mobile coverage throughout the UK to 95% geographic coverage by end-2025. Coverage is based on Ofcom\u2019s definition of good quality 4G coverage, which is the minimum signal strength required to deliver a 90-second telephone call and a download speed of at least 2Mbit/s, 95% of the time.<\/p>

The Shared Rural Network is underpinned by legally binding coverage commitments from each operator to have reached at least 90%, which will be assessed in 2026. Ofcom will regularly report on coverage improvements towards this goal through its Connected Nations report.<\/p>

Exact site deployment plans will be managed by the operators themselves in order for them to best deliver the agreed coverage outcomes. However, we expect that consumers will feel the benefit of the programme long before its conclusion and the operators will consult with communities as roll out plans become clearer.<\/p>

While the biggest improvements in coverage arising from the Shared Rural Network will be in Scotland and Wales, there will be improvements across all four nations. 4G geographic coverage in England is currently 97% from at least one operator and 81% from all four operators. As a result of the programme, this will increase to 98% coverage from at least one operator, and 90% from all four by end-2025.<\/p>

The Shared Rural Network will help close the digital divide between urban and rural areas by improving mobile coverage in largely rural areas across the whole of the UK. The programme is not directly aimed at improving coverage in dense inner-city areas such as the West End of London which, typically, have good 4G coverage from all four operators, and it will remain a commercial decision for operators to decide whether to improve coverage in such areas.<\/p>

We are aware of the European Commission\u2019s Digital Economy and Society Index report 2019, which compares 4G coverage of homes across Member States. The report, available via the following link, https://ec.europa.eu/digital-single-market/en/desi<\/a> suggests that in 2018, based on an average of operator coverage, there was 98% 4G coverage of UK homes. This compared to 95% for France, and an EU average of 94%. The Shared Rural Network will help to improve our European standing by providing additional coverage to 280,000 premises.<\/p>

While the vast majority of commercial rollout of 5G services will be delivered by industry and according to their own timeframes, government is committed to being a world leader in 5G technology and providing a 5G signal to a majority of the population by 2027. The Government is investing in a nationally coordinated programme of 5G testbed facilities and application trials to help achieve this, and has allocated £200 million from the National Productivity Investment Fund to the 5G Programme, which launched in 2017 and will run until March 2022.<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/4703", "label" : {"_value" : "Biography information for Baroness Barran"} } , "answeringMemberPrinted" : {"_value" : "Baroness Barran"} , "dateOfAnswer" : {"_value" : "2020-03-16", "_datatype" : "dateTime"} , "groupedQuestionUIN" : [{"_value" : "HL2278"} , {"_value" : "HL2279"} , {"_value" : "HL2280"} , {"_value" : "HL2282"} , {"_value" : "HL2283"} , {"_value" : "HL2350"} ], "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2020-03-16T16:31:57.797Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "10"} , "answeringDeptShortName" : {"_value" : "Digital, Culture, Media and Sport"} , "answeringDeptSortName" : {"_value" : "Digital, Culture, Media and Sport"} , "date" : {"_value" : "2020-03-05", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "4G: Greater London"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty's Government what plans they have to improve 4G reception in the West End of London.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/3830", "label" : {"_value" : "Biography information for Lord Mawson"} } , "tablingMemberPrinted" : [{"_value" : "Lord Mawson"} ], "uin" : "HL2281"} , {"_about" : "http://data.parliament.uk/resources/1183190", "AnsweringBody" : [{"_value" : "Department for Digital, Culture, Media and Sport"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/1183190/answer", "answerText" : {"_value" : "

The Government announced on 9 March that it had agreed a deal with the mobile network operators to deliver the Shared Rural Network programme. This will see Government and industry jointly invest to increase 4G mobile coverage throughout the UK to 95% geographic coverage by end-2025. Coverage is based on Ofcom\u2019s definition of good quality 4G coverage, which is the minimum signal strength required to deliver a 90-second telephone call and a download speed of at least 2Mbit/s, 95% of the time.<\/p>

The Shared Rural Network is underpinned by legally binding coverage commitments from each operator to have reached at least 90%, which will be assessed in 2026. Ofcom will regularly report on coverage improvements towards this goal through its Connected Nations report.<\/p>

Exact site deployment plans will be managed by the operators themselves in order for them to best deliver the agreed coverage outcomes. However, we expect that consumers will feel the benefit of the programme long before its conclusion and the operators will consult with communities as roll out plans become clearer.<\/p>

While the biggest improvements in coverage arising from the Shared Rural Network will be in Scotland and Wales, there will be improvements across all four nations. 4G geographic coverage in England is currently 97% from at least one operator and 81% from all four operators. As a result of the programme, this will increase to 98% coverage from at least one operator, and 90% from all four by end-2025.<\/p>

The Shared Rural Network will help close the digital divide between urban and rural areas by improving mobile coverage in largely rural areas across the whole of the UK. The programme is not directly aimed at improving coverage in dense inner-city areas such as the West End of London which, typically, have good 4G coverage from all four operators, and it will remain a commercial decision for operators to decide whether to improve coverage in such areas.<\/p>

We are aware of the European Commission\u2019s Digital Economy and Society Index report 2019, which compares 4G coverage of homes across Member States. The report, available via the following link, https://ec.europa.eu/digital-single-market/en/desi<\/a> suggests that in 2018, based on an average of operator coverage, there was 98% 4G coverage of UK homes. This compared to 95% for France, and an EU average of 94%. The Shared Rural Network will help to improve our European standing by providing additional coverage to 280,000 premises.<\/p>

While the vast majority of commercial rollout of 5G services will be delivered by industry and according to their own timeframes, government is committed to being a world leader in 5G technology and providing a 5G signal to a majority of the population by 2027. The Government is investing in a nationally coordinated programme of 5G testbed facilities and application trials to help achieve this, and has allocated £200 million from the National Productivity Investment Fund to the 5G Programme, which launched in 2017 and will run until March 2022.<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/4703", "label" : {"_value" : "Biography information for Baroness Barran"} } , "answeringMemberPrinted" : {"_value" : "Baroness Barran"} , "dateOfAnswer" : {"_value" : "2020-03-16", "_datatype" : "dateTime"} , "groupedQuestionUIN" : [{"_value" : "HL2278"} , {"_value" : "HL2279"} , {"_value" : "HL2280"} , {"_value" : "HL2281"} , {"_value" : "HL2283"} , {"_value" : "HL2350"} ], "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2020-03-16T16:31:57.843Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "10"} , "answeringDeptShortName" : {"_value" : "Digital, Culture, Media and Sport"} , "answeringDeptSortName" : {"_value" : "Digital, Culture, Media and Sport"} , "date" : {"_value" : "2020-03-05", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "Mobile Broadband: Infrastructure"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty's Government what plans they have to invest in (1) 4G, and (2) 5G, infrastructure over the next four years; what reception improvements are expected as a result of such investment; and when they estimate reception will improve.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/3830", "label" : {"_value" : "Biography information for Lord Mawson"} } , "tablingMemberPrinted" : [{"_value" : "Lord Mawson"} ], "uin" : "HL2282"} , {"_about" : "http://data.parliament.uk/resources/1183191", "AnsweringBody" : [{"_value" : "Department for Digital, Culture, Media and Sport"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/1183191/answer", "answerText" : {"_value" : "

The Government announced on 9 March that it had agreed a deal with the mobile network operators to deliver the Shared Rural Network programme. This will see Government and industry jointly invest to increase 4G mobile coverage throughout the UK to 95% geographic coverage by end-2025. Coverage is based on Ofcom\u2019s definition of good quality 4G coverage, which is the minimum signal strength required to deliver a 90-second telephone call and a download speed of at least 2Mbit/s, 95% of the time.<\/p>

The Shared Rural Network is underpinned by legally binding coverage commitments from each operator to have reached at least 90%, which will be assessed in 2026. Ofcom will regularly report on coverage improvements towards this goal through its Connected Nations report.<\/p>

Exact site deployment plans will be managed by the operators themselves in order for them to best deliver the agreed coverage outcomes. However, we expect that consumers will feel the benefit of the programme long before its conclusion and the operators will consult with communities as roll out plans become clearer.<\/p>

While the biggest improvements in coverage arising from the Shared Rural Network will be in Scotland and Wales, there will be improvements across all four nations. 4G geographic coverage in England is currently 97% from at least one operator and 81% from all four operators. As a result of the programme, this will increase to 98% coverage from at least one operator, and 90% from all four by end-2025.<\/p>

The Shared Rural Network will help close the digital divide between urban and rural areas by improving mobile coverage in largely rural areas across the whole of the UK. The programme is not directly aimed at improving coverage in dense inner-city areas such as the West End of London which, typically, have good 4G coverage from all four operators, and it will remain a commercial decision for operators to decide whether to improve coverage in such areas.<\/p>

We are aware of the European Commission\u2019s Digital Economy and Society Index report 2019, which compares 4G coverage of homes across Member States. The report, available via the following link, https://ec.europa.eu/digital-single-market/en/desi<\/a> suggests that in 2018, based on an average of operator coverage, there was 98% 4G coverage of UK homes. This compared to 95% for France, and an EU average of 94%. The Shared Rural Network will help to improve our European standing by providing additional coverage to 280,000 premises.<\/p>

While the vast majority of commercial rollout of 5G services will be delivered by industry and according to their own timeframes, government is committed to being a world leader in 5G technology and providing a 5G signal to a majority of the population by 2027. The Government is investing in a nationally coordinated programme of 5G testbed facilities and application trials to help achieve this, and has allocated £200 million from the National Productivity Investment Fund to the 5G Programme, which launched in 2017 and will run until March 2022.<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/4703", "label" : {"_value" : "Biography information for Baroness Barran"} } , "answeringMemberPrinted" : {"_value" : "Baroness Barran"} , "dateOfAnswer" : {"_value" : "2020-03-16", "_datatype" : "dateTime"} , "groupedQuestionUIN" : [{"_value" : "HL2278"} , {"_value" : "HL2279"} , {"_value" : "HL2280"} , {"_value" : "HL2281"} , {"_value" : "HL2282"} , {"_value" : "HL2350"} ], "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2020-03-16T16:31:57.903Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "10"} , "answeringDeptShortName" : {"_value" : "Digital, Culture, Media and Sport"} , "answeringDeptSortName" : {"_value" : "Digital, Culture, Media and Sport"} , "date" : {"_value" : "2020-03-05", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "4G"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty's Government what assessment they have made of the reliability of 4G in the UK compared to EU countries.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/3830", "label" : {"_value" : "Biography information for Lord Mawson"} } , "tablingMemberPrinted" : [{"_value" : "Lord Mawson"} ], "uin" : "HL2283"} , {"_about" : "http://data.parliament.uk/resources/600527", "AnsweringBody" : [{"_value" : "Cabinet Office"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/600527/answer", "answerText" : {"_value" : "

The Government's guidance on answering Parliamentary Questions, for both the House of Lords and the House of Commons is set out in the attached Cabinet Office guidance. Freedom of information requests are answered in line with the requirements set out in the Freedom of Information Act 2000<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/4330", "label" : {"_value" : "Biography information for Baroness Chisholm of Owlpen"} } , "answeringMemberPrinted" : {"_value" : "Baroness Chisholm of Owlpen"} , "attachment" : {"_about" : "http://data.parliament.uk/resources/600527/answer/attachment/1", "fileName" : {"_value" : "CO-DC00-PRN01_Emman Chowdhury_3342_001.pdf"} , "title" : "Attachment for PEER - FOI and PQs"} , "dateOfAnswer" : {"_value" : "2016-10-25", "_datatype" : "dateTime"} , "groupedQuestionUIN" : {"_value" : "HL2279"} , "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2016-10-25T14:43:51.847Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "53"} , "answeringDeptShortName" : {"_value" : "Cabinet Office"} , "answeringDeptSortName" : {"_value" : "Cabinet Office"} , "date" : {"_value" : "2016-10-12", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "Government Departments: Disclosure of Information"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty\u2019s Government what is the difference between their approach to answering Parliamentary Questions and freedom of information requests.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/4153", "label" : {"_value" : "Biography information for Lord Kennedy of Southwark"} } , "tablingMemberPrinted" : [{"_value" : "Lord Kennedy of Southwark"} ], "uin" : "HL2280"} , {"_about" : "http://data.parliament.uk/resources/100071", "AnsweringBody" : [{"_value" : "Home Office"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/100071/answer", "answerText" : {"_value" : "

The Azure card is issued to destitute failed asylum seekers accommodated under section 4 of the Immigration and Asylum Act 1999 because they are temporarily unable to leave the United Kingdom. The card can be used at most of the main supermarket chains to purchase food and other essential items. The performance of the card is kept under regular review but the Government is satisfied that it is an effective way of ensuring that recipients are able to meet their essential living needs and are not left destitute.<\/p>

<\/p>

The Government therefore has no plans to abolish the card or change legislation to allow people supported under section 4 to receive cash instead.<\/p>

<\/p>

The total administrative costs of the card scheme since it was introduced in 2009 are approximately £1,515,000. Estimated administrative costs for the current financial year are £200,000.<\/p>

<\/p>

The Government published its response to the House of Commons Home Affairs Committee report about asylum procedures in December 2013 (cm 8769). A response to the Committee\u2019s views on section 4 support was set out on page 18-19.<\/p>

<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/1091", "label" : {"_value" : "Biography information for Lord Bates"} } , "answeringMemberPrinted" : {"_value" : "Lord Bates"} , "dateOfAnswer" : {"_value" : "2014-10-28", "_datatype" : "dateTime"} , "groupedQuestionUIN" : [{"_value" : "HL2278"} , {"_value" : "HL2279"} , {"_value" : "HL2280"} , {"_value" : "HL2281"} ], "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2014-10-28T15:17:54.1853177Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "1"} , "answeringDeptShortName" : {"_value" : "Home Office"} , "answeringDeptSortName" : {"_value" : "Home Office"} , "date" : {"_value" : "2014-10-21", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "Asylum: Finance"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty\u2019s Government whether they have assessed the effectiveness of the combination of the Azure payment card and support under section 4 of the Immigration and Asylum Act 1999 in enabling refused asylum seekers to meet their basic needs.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/3691", "label" : {"_value" : "Biography information for Lord Roberts of Llandudno"} } , "tablingMemberPrinted" : [{"_value" : "Lord Roberts of Llandudno"} ], "uin" : "HL2277"} , {"_about" : "http://data.parliament.uk/resources/100072", "AnsweringBody" : [{"_value" : "Home Office"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/100072/answer", "answerText" : {"_value" : "

The Azure card is issued to destitute failed asylum seekers accommodated under section 4 of the Immigration and Asylum Act 1999 because they are temporarily unable to leave the United Kingdom. The card can be used at most of the main supermarket chains to purchase food and other essential items. The performance of the card is kept under regular review but the Government is satisfied that it is an effective way of ensuring that recipients are able to meet their essential living needs and are not left destitute.<\/p>

<\/p>

The Government therefore has no plans to abolish the card or change legislation to allow people supported under section 4 to receive cash instead.<\/p>

<\/p>

The total administrative costs of the card scheme since it was introduced in 2009 are approximately £1,515,000. Estimated administrative costs for the current financial year are £200,000.<\/p>

<\/p>

The Government published its response to the House of Commons Home Affairs Committee report about asylum procedures in December 2013 (cm 8769). A response to the Committee\u2019s views on section 4 support was set out on page 18-19.<\/p>

<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/1091", "label" : {"_value" : "Biography information for Lord Bates"} } , "answeringMemberPrinted" : {"_value" : "Lord Bates"} , "dateOfAnswer" : {"_value" : "2014-10-28", "_datatype" : "dateTime"} , "groupedQuestionUIN" : [{"_value" : "HL2277"} , {"_value" : "HL2279"} , {"_value" : "HL2280"} , {"_value" : "HL2281"} ], "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2014-10-28T15:17:55.3415588Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "1"} , "answeringDeptShortName" : {"_value" : "Home Office"} , "answeringDeptSortName" : {"_value" : "Home Office"} , "date" : {"_value" : "2014-10-21", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "Asylum: Finance"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty\u2019s Government what plans they have to abolish the Azure payment card and amend legislation to enable the provision of cash support for all refused asylum seekers until they are either given status in the United Kingdom or return to their country of origin.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/3691", "label" : {"_value" : "Biography information for Lord Roberts of Llandudno"} } , "tablingMemberPrinted" : [{"_value" : "Lord Roberts of Llandudno"} ], "uin" : "HL2278"} , {"_about" : "http://data.parliament.uk/resources/100074", "AnsweringBody" : [{"_value" : "Home Office"} ], "answer" : {"_about" : "http://data.parliament.uk/resources/100074/answer", "answerText" : {"_value" : "

The Azure card is issued to destitute failed asylum seekers accommodated under section 4 of the Immigration and Asylum Act 1999 because they are temporarily unable to leave the United Kingdom. The card can be used at most of the main supermarket chains to purchase food and other essential items. The performance of the card is kept under regular review but the Government is satisfied that it is an effective way of ensuring that recipients are able to meet their essential living needs and are not left destitute.<\/p>

<\/p>

The Government therefore has no plans to abolish the card or change legislation to allow people supported under section 4 to receive cash instead.<\/p>

<\/p>

The total administrative costs of the card scheme since it was introduced in 2009 are approximately £1,515,000. Estimated administrative costs for the current financial year are £200,000.<\/p>

<\/p>

The Government published its response to the House of Commons Home Affairs Committee report about asylum procedures in December 2013 (cm 8769). A response to the Committee\u2019s views on section 4 support was set out on page 18-19.<\/p>

<\/p>"} , "answeringMember" : {"_about" : "http://data.parliament.uk/members/1091", "label" : {"_value" : "Biography information for Lord Bates"} } , "answeringMemberPrinted" : {"_value" : "Lord Bates"} , "dateOfAnswer" : {"_value" : "2014-10-28", "_datatype" : "dateTime"} , "groupedQuestionUIN" : [{"_value" : "HL2277"} , {"_value" : "HL2278"} , {"_value" : "HL2279"} , {"_value" : "HL2281"} ], "isMinisterialCorrection" : {"_value" : "false", "_datatype" : "boolean"} , "questionFirstAnswered" : [{"_value" : "2014-10-28T15:17:56.0405779Z", "_datatype" : "dateTime"} ]} , "answeringDeptId" : {"_value" : "1"} , "answeringDeptShortName" : {"_value" : "Home Office"} , "answeringDeptSortName" : {"_value" : "Home Office"} , "date" : {"_value" : "2014-10-21", "_datatype" : "dateTime"} , "hansardHeading" : {"_value" : "Asylum: Finance"} , "houseId" : {"_value" : "2"} , "legislature" : [{"_about" : "http://data.parliament.uk/terms/25277", "prefLabel" : {"_value" : "House of Lords"} } ], "questionText" : "To ask Her Majesty\u2019s Government what is their forecast annual cost for administering the Azure card payment scheme in the coming year.", "registeredInterest" : {"_value" : "false", "_datatype" : "boolean"} , "tablingMember" : {"_about" : "http://data.parliament.uk/members/3691", "label" : {"_value" : "Biography information for Lord Roberts of Llandudno"} } , "tablingMemberPrinted" : [{"_value" : "Lord Roberts of Llandudno"} ], "uin" : "HL2280"} ], "itemsPerPage" : 10, "next" : "http://eldaddp.azurewebsites.net/answeredquestions.text?_page=1&answer.groupedQuestionUIN.=HL2279", "page" : 0, "startIndex" : 1, "totalResults" : 11, "type" : ["http://purl.org/linked-data/api/vocab#ListEndpoint", "http://purl.org/linked-data/api/vocab#Page"]} }