To ask Her Majesty’s Government, in the light of the updated interim report on the
Trans-Pennine tunnel strategic study published on 18 August, what is the maximum length
of tunnel being considered; what assumptions are being made as to the hourly maximum
capacity of HGV and car traffic that such a tunnel could carry safely; what rules
about spacing between vehicles, maximum speeds are being considered, and how these
compare with current and planned rules in the Mont Blanc and Gotthard road tunnels;
and whether they will include in the study the option of building a rail tunnel and
operating a rail freight shuttle for heavy goods vehicles to piggyback on rail wagons.
|
|