|
answer text |
<p>Some of the tunnel options that have been looked at in the East Midlands Hub area
included variants of a station, both at grade and below ground. Tunnel options in
this area have not been progressed due to the significant length of the tunnel, significant
cost impacts and flood risk. HS2 Ltd continues to refine the station design, taking
into consideration the environment, cost and views of local stakeholders. The current
station proposal has been well received by local leaders across the region.</p><p>
</p>
|
|