|
answer text |
<p>The A1(M) is inspected weekly and safety critical potholes and surface defects
are repaired within 24 hours. Highways England have made safe 36 potholes on the northbound
carriageway and larger patch repairs across 100 square metres of carriageway between
junctions 6 and 7 since December 2018. They plan to carry out other surface repairs
between junctions 6 and 7 before the end of March.</p><p> </p><p>Highways England
have also recently completed road surface condition surveys of the A1(M) and other
strategic roads in the region. These will be used to determine a prioritised programme
of resurfacing work on the A1(M) and other roads over the next 3 years.</p><p> </p><p>In
addition, construction of the A1(M) junctions 6 – 8 smart motorway starts in the next
financial year. Construction will include resurfacing at various locations in both
directions between junctions 6 and 8.</p><p> </p>
|
|