answer text |
<p>Network Rail’s 2015 Wessex Route Study identified the single track sections on
the route between Salisbury and Exeter and platform capacity at Salisbury as some
of the factors constraining journey times, increasing the number of services and overall
line resilience between Exeter and Waterloo.</p><p> </p><p>However, the Route Study
concluded that the forecast levels of growth between Salisbury and Exeter did not
warrant inclusion of additional sections of double track as a priority in the next
Control Period (CP6).</p>
|
|