hansard heading Wind Power: Noise more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, whether he is taking steps to ensure that the level of regulation applied to fracking sites on the permanent monitoring of noise emissions applies also to (a) the wind industry, (b) wind turbines and (c) all wind farm sites; and if he will make a statement. more like this
tabling member constituency South Cambridgeshire more like this
tabling member printed
Heidi Allen more like this
uin 198310 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-12-27more like thismore than 2018-12-27
answer text <p>Planning authorities are responsible for applying and enforcing any conditions attached to the planning permission for a fracking or wind turbine development, and this must be assessed on a case-by-case basis. This may include monitoring of noise levels.</p> more like this
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
question first answered
less than 2018-12-27T13:23:06.597Zmore like thismore than 2018-12-27T13:23:06.597Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
4516
label Biography information for Heidi Allen more like this