Linked Data API

Show Search Form

Search Results

1469801
registered interest false more like this
date less than 2022-06-13more like thismore than 2022-06-13
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading Road Traffic Control: Dover more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps his Department is taking to ease congestion arising from lorry traffic departing Dover. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 16865 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2022-06-21more like thismore than 2022-06-21
answer text <p>Recent increase in traffic queues for freight and passenger travel in Kent was caused by a combination of factors. Disruption began because of adverse weather conditions causing delays to sailings from Port of Dover and the situation was significantly exacerbated by the well-documented actions of P&amp;O Ferries which account for over 35% of the market share of Dover. Coupled with the brief cessation of Eurotunnel services due to a breakdown and an increase in passenger and freight traffic, disruption quickly grew in Kent.</p><p> </p><p>The Kent Resilience Forum’s (KRF’s) traffic management and enforcement plans, including activation of Operation Brock on the M20, were put in place in late March to ensure continued flow of vehicles through Kent to ports whilst also trying to maintain local mobility as much as possible. Additional resilience measures were put in place, which had a positive impact on maintaining throughput to the ports and keeping local roads moving.</p><p> </p><p>Over the May half-term and Jubilee Weekend, there was no significant disruption on the Kent strategic road network. Operation Brock has now been deactivated as of 5 June, but the Kent Resilience Forum (KRF) will reconsider deploying it ahead of the start of the school summer holidays.</p><p> </p><p>To further ease congestion in Dover, we are strengthening enforcement against those hauliers deviating from Operation Brock and causing gridlock on local roads, and greater usage of freight parking capacity at Sevington Inland Border Facility and Ashford Truck Stop when Operation Brock is reaching its capacity. These measures will help to keep the M20 open to all vehicles and enable local and passenger traffic to keep flowing throughout Kent.</p><p> </p>
answering member constituency Copeland more like this
answering member printed Trudy Harrison more like this
question first answered
less than 2022-06-21T10:18:56.933Zmore like thismore than 2022-06-21T10:18:56.933Z
answering member
4593
label Biography information for Trudy Harrison more like this
tabling member
1522
label Biography information for Adam Holloway remove filter
1463018
registered interest false more like this
date less than 2022-05-16more like thismore than 2022-05-16
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading Railways more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether an assessment has been made of the potential merits of extending the Thameslink service from Ebbsfleet to Essex to help reduce pressure from the Dartford crossing. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 2408 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2022-05-23more like thismore than 2022-05-23
answer text <p>Ebbsfleet International is served by Southeastern and HS1, and I can confirm the Department has not assessed, nor has it asked Southeastern to investigate, the feasibility of running services from Ebbsfleet International to Essex.</p><p> </p><p>Thameslink services do not serve Ebbsfleet International at present. This would only be possible with significant investment in infrastructure, as there is no railway currently connecting Ebbsfleet International to the Thameslink route.</p><p> </p> more like this
answering member constituency Aldridge-Brownhills more like this
answering member printed Wendy Morton more like this
question first answered
less than 2022-05-23T12:44:06.577Zmore like thismore than 2022-05-23T12:44:06.577Z
answering member
4358
label Biography information for Wendy Morton more like this
tabling member
1522
label Biography information for Adam Holloway remove filter
1111198
registered interest false more like this
date less than 2019-04-10more like thismore than 2019-04-10
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading A2: Garages and Petrol Stations more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, for what reason the sale of Tollgate Hotel Watling Street Gravesend Kent DA13 9RA to BP Oil UK Limited has been delayed. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 243371 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-04-15more like thismore than 2019-04-15
answer text <p>Highways England entered into a conditional contract with BP for the sale of Tollgate Hotel that was conditional on planning permission being granted for development. The planning applications submitted have been subject to a number of judicial reviews, which have delayed the sale. As a result, Highways England have now agreed with BP to move to an unconditional contract; this means the sale will no longer be dependent on gaining planning permission, and Highways England will now be able to move forward with the sale.</p><p>Given that Highways England will be entering into a new unconditional contract with BP for the sale of the property, they have no plans to remarket it at this time.</p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman more like this
question first answered
less than 2019-04-15T12:56:28.643Zmore like thismore than 2019-04-15T12:56:28.643Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1522
label Biography information for Adam Holloway remove filter
1111202
registered interest false more like this
date less than 2019-04-10more like thismore than 2019-04-10
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading A2: Garages and Petrol Stations more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, with reference to the proposed sale of Tollgate Hotel Watling Street Gravesend Kent DA13 9RA to BP Oil UK Limited, what information his Department holds on proposals to re-market the property for sale as a result of the seven-year delay in BP securing planning on that site. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 243372 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-04-18more like thismore than 2019-04-18
answer text <p>Highways England entered into a conditional contract with BP for the sale of Tollgate Hotel which was conditional on planning permission being granted for development. The planning applications submitted have been subject to a number of judicial reviews, which has delayed the sale. As a result, Highways England have now agreed with BP to move to an unconditional contract, which means the sale will no longer be dependent on gaining planning permission and Highways England will now be able to progress the sale.</p><p><em> </em></p><p>Given that Highways England will be entering into a new unconditional contract with BP for the sale of the property, they have no plans to remarket at this time.</p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman more like this
question first answered
less than 2019-04-18T11:01:35.04Zmore like thismore than 2019-04-18T11:01:35.04Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1522
label Biography information for Adam Holloway remove filter
874864
registered interest false more like this
date less than 2018-03-29more like thismore than 2018-03-29
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading Crossrail Line: Northfleet more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what the current safeguarding status in relation to Crossrail is of the land at Station house on the south side of Railway street, Northfleet, Kent, Title Number K972486. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 135165 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-04-17more like thismore than 2018-04-17
answer text <p>The Department for Transport does not hold this information, nor does it manage enquiries about safeguarding along the route. More specific advice can be obtained by emailing a plan of the relevant site to Crossrail Limited at <a href="mailto:safeguarding@crossrail.co.uk" target="_blank">safeguarding@crossrail.co.uk</a>.</p><p> </p><p>The safeguarded route between Abbey Wood and Hoo Junction, including the area around Northfleet, is available on Crossrail Limited’s website at <a href="http://www.crossrail.co.uk/route/safeguarding/abbey-wood-to-hoo-junction" target="_blank">http://www.crossrail.co.uk/route/safeguarding/abbey-wood-to-hoo-junction</a>.</p><p> </p> more like this
answering member constituency Orpington more like this
answering member printed Joseph Johnson more like this
question first answered
less than 2018-04-17T15:17:18.357Zmore like thismore than 2018-04-17T15:17:18.357Z
answering member
4039
label Biography information for Lord Johnson of Marylebone more like this
tabling member
1522
label Biography information for Adam Holloway remove filter
874865
registered interest false more like this
date less than 2018-03-29more like thismore than 2018-03-29
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading Crossrail Line: Northfleet more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, if he will publish the safeguarding route for Crossrail in the area around Northfleet, Kent. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 135166 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-04-17more like thismore than 2018-04-17
answer text <p>The safeguarded route between Abbey Wood and Hoo Junction, including the area around Northfleet, is available on Crossrail Limited’s website at <a href="http://www.crossrail.co.uk/route/safeguarding/abbey-wood-to-hoo-junction" target="_blank">http://www.crossrail.co.uk/route/safeguarding/abbey-wood-to-hoo-junction</a>.</p> more like this
answering member constituency Orpington more like this
answering member printed Joseph Johnson more like this
question first answered
less than 2018-04-17T15:20:18.71Zmore like thismore than 2018-04-17T15:20:18.71Z
answering member
4039
label Biography information for Lord Johnson of Marylebone more like this
tabling member
1522
label Biography information for Adam Holloway remove filter
751446
registered interest false more like this
date less than 2017-07-12more like thismore than 2017-07-12
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading Lower Thames Crossing more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether an assessment has been made of the potential effect on levels of congestion in Gravesham in the event that the (a) existing or (b) proposed new Lower Thames Crossings are heavily congested. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 4684 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-07-20more like thismore than 2017-07-20
answer text <p>In developing its proposals for the Lower Thames Crossing, Highways England examined the impact of incidents on the operation of the Strategic Road Network, and the knock-on effects on the local road network.</p><p> </p><p>These assessments will be further refined as the detailed design for the scheme takes shape.</p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman more like this
question first answered
less than 2017-07-20T13:40:17.927Zmore like thismore than 2017-07-20T13:40:17.927Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1522
label Biography information for Adam Holloway remove filter
751447
registered interest false more like this
date less than 2017-07-12more like thismore than 2017-07-12
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading Dartford-Thurrock Crossing more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what estimate his Department has made of the potential effect on levels of congestion at the Dartford Crossing after the construction of the proposed new Lower Thames Crossing. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 4683 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-07-20more like thismore than 2017-07-20
answer text <p>Through traffic modelling and forecasting Highways England has made an assessment of the scheme’s potential effect on levels of congestion at the Dartford Crossing. This is reported in section 4 of the Post-Consultation Scheme Assessment Report Volume 5.</p><p><a href="https://highwaysengland.citizenspace.com/cip/lower-thames-crossing-consultation/supporting_documents/PostConsultation%20Scheme%20Assessment%20Report%20Volume%205.pdf" target="_blank">https://highwaysengland.citizenspace.com/cip/lower-thames-crossing-consultation/supporting_documents/PostConsultation%20Scheme%20Assessment%20Report%20Volume%205.pdf</a></p><p> </p><p>As the detailed design for the scheme progresses this will be subject to further assessment and an enhanced traffic model is being developed incorporating the latest travel demand data. This will be used to produce revised traffic volume and congestion forecasts for the local and wider road network, including the Dartford Crossing.</p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman more like this
question first answered
less than 2017-07-20T13:35:09.273Zmore like thismore than 2017-07-20T13:35:09.273Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1522
label Biography information for Adam Holloway remove filter
723918
registered interest false more like this
date less than 2017-04-24more like thismore than 2017-04-24
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading Lower Thames Crossing more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, how many responses to the Lower Thames Crossing Consultation were associated with a campaign by Higham Parish Council; and how many of those responses (a) answered all questions in the consultation, (b) answered a majority of questions in the consultation, (c) provided identical responses, (d) provided individually tailored responses, (e) were included in the analysis of individual bespoke responses to the consultation and (f) were not included in the analysis of individual bespoke responses to the consultation. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 71699 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-04-27more like thismore than 2017-04-27
answer text <p>The analysis of consultation responses is available in the Ipsos MORI report published on 12 April 2017, the post-consultation Scheme Assessment Report and the Response to Consultation, available online at <a href="http://www.lower-thames-crossing.co.uk" target="_blank">www.lower-thames-crossing.co.uk</a>.</p><p> </p><p>Highways England do not hold a breakdown of all figures specifically requested in each of these questions but have provided specific figures and breakdowns where this are available.</p><p> </p><p>946 people were categorised as part of the Higham Parish Council campaign. Of those, 6 submitted identically worded responses for all questions and 940 participants provided a response based on this campaign which:</p><p>- included a partial version of the text with or without their own personal comments, or</p><p>- included the full version of this text plus additional personal comments.</p><p> </p><p>Comments provided by participants were summarised and analysed along with other consultation responses.</p>
answering member constituency South Holland and The Deepings more like this
answering member printed Mr John Hayes more like this
question first answered
less than 2017-04-27T08:56:28.34Zmore like thismore than 2017-04-27T08:56:28.34Z
answering member
350
label Biography information for Sir John Hayes more like this
tabling member
1522
label Biography information for Adam Holloway remove filter
723919
registered interest false more like this
date less than 2017-04-24more like thismore than 2017-04-24
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport remove filter
hansard heading Lower Thames Crossing more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, how many people expressed a view directly or via third parties to his Department, Highways England and Ipsos Mori about Option A during the period of the Lower Thames Crossing Consultation between 26 January 2016 and 24 March 2016, including consultation responses, letters, emails and petition signatories that (a) agree or tend to agree, (b) disagree or tend to disagree and (c) neither agree nor disagree with Option A; and how many of those views were (i) associated and (ii) not associated with an organised campaign. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 71695 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-04-27more like thismore than 2017-04-27
answer text <p>Detail of the analysis of consultation responses is available in the Ipsos MORI report published on 12 April 2017, the post-consultation Scheme Assessment Report and the Response to Consultation, available online at <a href="http://www.lower-thames-crossing.co.uk" target="_blank">www.lower-thames-crossing.co.uk</a>.</p><p> </p><p>Highways England do not hold a breakdown of all figures specifically requested in each of these questions but have provided specific figures and breakdowns where this are available.</p><p> </p><p>The 2,928 who responded via the questionnaire (a) 1,760 made comments in support of Location A (b) 1,165 made comments opposing Location A in their free text responses. One of these campaigns specifically suggested a new north-bound bridge crossing at Dartford as the solution. This campaign is referenced as ‘Campaign 11, Adam Holloway MP’ in the Ipsos MORI report and received 42 signatures.</p><p> </p> more like this
answering member constituency South Holland and The Deepings more like this
answering member printed Mr John Hayes more like this
question first answered
less than 2017-04-27T08:20:25.45Zmore like thismore than 2017-04-27T08:20:25.45Z
answering member
350
label Biography information for Sir John Hayes more like this
tabling member
1522
label Biography information for Adam Holloway remove filter