answer text |
<p>Figures for driver attributed cancellations the whole of the TSGN franchise in
the last four periods are below. This data represents the first four periods since
Southern Railway joined Govia Thameslink Railway at the end of July. This data does
not differentiate between cancellations due to driver shortage and operational issues.</p><br
/> <br /> <br /><table><tbody><tr><td><p><br></p></td><td><p>Rail Period 1605 26/7-22/8</p></td><td><p>Rail
Period 1606 23/8-19/9</p></td><td><p>Rail Period 1607 20/9-17/10</p></td><td><p>Rail
Period 1608 18/10-14/11</p></td></tr><tr><td><p>Full cancellations</p></td><td><p>1093</p></td><td><p>1331</p></td><td><p>723</p></td><td><p>706</p></td></tr><tr><td><p>Part
cancellations</p></td><td><p>458</p></td><td><p>410</p></td><td><p>406</p></td><td><p>411</p></td></tr><tr><td><p>Total</p></td><td><p>1551</p></td><td><p>1741</p></td><td><p>1129</p></td><td><p>1117</p></td></tr></tbody></table><br
/><p>The Department does not hold information on cancellations due to sickness.</p><br
/>
|
|