Linked Data API

Show Search Form

Search Results

994338
registered interest false more like this
date less than 2018-10-24more like thismore than 2018-10-24
answering body
The Senior Deputy Speaker more like this
answering dept id 204 more like this
answering dept short name
answering dept sort name Senior Deputy Speaker (HoL) more like this
hansard heading Palace of Westminster: Fire Prevention more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask the Senior Deputy Speaker what consideration was given to the needs of disabled users of the Palace when the decision was taken to install temporary fire doors in certain areas of the Palace of Westminster; and how long he anticipates those doors being in place. more like this
tabling member printed
Lord Blencathra more like this
uin HL10982 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-11-07more like thismore than 2018-11-07
answer text <p>The Senior Deputy Speaker has asked me, as Chairman of the Services Committee, to respond on his behalf. The temporary fire doors needed to be installed to ensure mitigation to Fire Life Safety non-compliance. The floor springs and hinges of the original doors had deteriorated to the extent that it was not possible to ensure compliance. Work had to be undertaken requiring their removal and replacement with temporary fire doors.</p><p>Consideration was given to disabled users; the temporary doors are in excess of current part M Building Regulations, requiring minimum 800mm width doors, as 830mm wide doors have been installed which fully comply with both Part M (access) and Part B (fire) requirements. The original doors will be returned from mid-November to the end of November.</p> more like this
answering member printed Lord Laming more like this
question first answered
less than 2018-11-07T16:54:53.22Zmore like thismore than 2018-11-07T16:54:53.22Z
answering member
2079
label Biography information for Lord Laming more like this
tabling member
497
label Biography information for Lord Blencathra remove filter
994339
registered interest false more like this
date less than 2018-10-24more like thismore than 2018-10-24
answering body
The Senior Deputy Speaker more like this
answering dept id 204 more like this
answering dept short name
answering dept sort name Senior Deputy Speaker (HoL) more like this
hansard heading Palace of Westminster: Fire Prevention more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask the Senior Deputy Speaker what consideration has been given to replacing the recently installed single-leaf temporary fire doors in the Palace of Westminster with double-leaf doors that (1) swing both ways, and (2) have larger glass panels. more like this
tabling member printed
Lord Blencathra more like this
uin HL10983 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-11-07more like thismore than 2018-11-07
answer text <p>The Senior Deputy Speaker has asked me, as Chairman of the Services Committee, to respond on his behalf. The existing doors’ apertures are not large enough to accommodate temporary frames and temporary double leaf fire doors. The cost of providing temporary double leaf doors is considerably more expensive than single doors and the lead time for double leaf doors would delay the programme; the cost and delay would increase further for doors with double swing frames. The installed temporary glass panels are compatible with certified British Standards and Building Regulations standards for disabled access/visibility in that they allow wheelchair to wheelchair visibility through the glass.</p><p>No consideration has been given to replace the temporary doors given the deadline to achieve life safety compliance, compliance with British Standards and Building Regulations, and the additional cost of replacement. The original doors will be returned between mid-November and the end of November.</p>
answering member printed Lord Laming more like this
question first answered
less than 2018-11-07T16:55:31.15Zmore like thismore than 2018-11-07T16:55:31.15Z
answering member
2079
label Biography information for Lord Laming more like this
tabling member
497
label Biography information for Lord Blencathra remove filter
994340
registered interest false more like this
date less than 2018-10-24more like thismore than 2018-10-24
answering body
The Senior Deputy Speaker more like this
answering dept id 204 more like this
answering dept short name
answering dept sort name Senior Deputy Speaker (HoL) more like this
hansard heading Palace of Westminster: Fire Prevention more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask the Senior Deputy Speaker what consideration has been given to replacing the recently installed temporary fire doors in the Palace of Westminster with models more in keeping with the aesthetic of the Palace. more like this
tabling member printed
Lord Blencathra more like this
uin HL10984 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-11-07more like thismore than 2018-11-07
answer text <p>The Senior Deputy Speaker has asked me, as Chairman of the Services Committee, to respond on his behalf. To fabricate temporary doors more in keeping with the original doors would be extremely costly and would delay the programme well beyond the compliance deadline date.  Such a door would require the alteration of the original frame which would not be permitted under current listed building permissions.</p><p>No consideration has been given to replace the temporary doors given the deadline to achieve life safety compliance, compliance with British Standards and Building Regulations, and the additional cost of replacement. The original doors will be returned between mid-November and the end of November.</p><p> </p> more like this
answering member printed Lord Laming more like this
question first answered
less than 2018-11-07T16:57:07.663Zmore like thismore than 2018-11-07T16:57:07.663Z
answering member
2079
label Biography information for Lord Laming more like this
tabling member
497
label Biography information for Lord Blencathra remove filter
838333
registered interest false more like this
date less than 2018-02-07more like thismore than 2018-02-07
answering body
The Senior Deputy Speaker more like this
answering dept id 204 more like this
answering dept short name
answering dept sort name Senior Deputy Speaker (HoL) more like this
hansard heading Palace of Westminster: Repairs and Maintenance more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask the Senior Deputy Speaker, in the light of the resolutions on Restoration and Renewal passed by both Houses, what are the likely next steps; and what will be the mechanism for Peers to submit suggestions and ideas. more like this
tabling member printed
Lord Blencathra more like this
uin HL5466 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-02-21more like thismore than 2018-02-21
answer text <p>Both Houses have decided that the next steps of the Restoration &amp; Renewal Programme should be overseen by a Sponsor Board and Delivery Authority. It is expected that the Commission of each House will therefore immediately focus on establishing those bodies in shadow form. Until the shadow Sponsor Board has been appointed, the Programme will continue to be delivered under the governance of the bicameral Programme Board, which consists of officials from both Houses plus two external members, and acts with authority delegated from the Board and Accounting Officer of each House. Establishing both bodies in substantive form will require primary legislation.</p><p>The Programme Team, supported by its client advisory services consultants, CH2M and BDP, will continue work in the following areas:</p><ul><li>further investigation and documentation of the current physical condition of the Palace of Westminster and its building services;</li><li>further studies on the feasibility of the Queen Elizabeth II Conference Centre as temporary accommodation for the House of Lords;</li><li>design of Richmond House as temporary accommodation for the House of Commons, which is being taken forward as part of the Commons’ Northern Estate Programme;</li><li>development of a client brief for the design of the works to the Palace of Westminster;</li><li>the development of the required Outline Business Cases (OBCs), compliant with HM Treasury’s <em>Green Book</em>; and</li><li>a further round of medium-term mechanical and electrical, public health and conservation work to mitigate the operational risks to Parliament presented by the condition of the building between now and the commencement of the construction phase of the R&amp;R Programme.</li></ul><p>The design phase will require extensive consultation with Members of both Houses, as well as a wide range of other stakeholders including staff, third-party occupants of the Parliamentary Estate, visitors and other members of society throughout the United Kingdom. It is anticipated that this engagement work will be developed and taken forward by the shadow Sponsor Board once it is established later this year.</p><p>In the meantime, members of the Programme Team would be happy to receive suggestions and ideas from Members of both Houses. They can be contacted via <a href="mailto:restorationandrenewal@parliament.uk" target="_blank">restorationandrenewal@parliament.uk</a>.</p><p> </p>
answering member printed Lord McFall of Alcluith more like this
question first answered
less than 2018-02-21T16:07:39.427Zmore like thismore than 2018-02-21T16:07:39.427Z
answering member
4148
label Biography information for Lord McFall of Alcluith more like this
tabling member
497
label Biography information for Lord Blencathra remove filter