1695261
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Children in Care more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, if she will make an estimate of the number of children that are looked-after. more like this
tabling member constituency Mitcham and Morden more like this
tabling member printed
Dame Siobhain McDonagh more like this
uin 18030 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-19more like thismore than 2024-03-19
answer text <p>The latest information on the number of children looked after in England on 31 March 2023 can be found in the annual statistical release ‘Children looked after in England including adoptions’, which is available at: <a href="https://explore-education-statistics.service.gov.uk/find-statistics/children-looked-after-in-england-including-adoptions" target="_blank">https://explore-education-statistics.service.gov.uk/find-statistics/children-looked-after-in-england-including-adoptions</a>.</p><p> </p> more like this
answering member constituency Wantage more like this
answering member printed David Johnston more like this
question first answered
less than 2024-03-19T14:55:50.98Zmore like thismore than 2024-03-19T14:55:50.98Z
answering member
4761
label Biography information for David Johnston more like this
tabling member
193
label Biography information for Dame Siobhain McDonagh more like this
1695274
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Pupils: Exercise more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, what steps she is taking with Cabinet colleagues to help increase levels of physical activity in (a) pre-school, (b) primary school and (c) secondary school children. more like this
tabling member constituency York Central more like this
tabling member printed
Rachael Maskell more like this
uin 18199 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-20more like thismore than 2024-03-20
answer text <p>The Department for Culture, Media and Sport published the Get Active strategy in 2023, which aims to build a more active nation. This can be found here: <a href="https://www.gov.uk/government/publications/get-active-a-strategy-for-the-future-of-sport-and-physical-activity#Details" target="_blank">https://www.gov.uk/government/publications/get-active-a-strategy-for-the-future-of-sport-and-physical-activity#Details</a>. Central to this is a focus on ensuring that children establish a lifetime of engagement with sport and physical activity. The strategy sets an ambition that all children should meet the UK Chief Medical Officers’ guidelines on physical activity, with a target of getting 1 million more active children by 2030.</p><p> </p><p>In July 2023 the Department for Education published an update to the cross-government School Sport and Activity Action Plan (SSAAP) which can be found here: <a href="https://www.gov.uk/government/publications/school-sport-and-activity-action-plan" target="_blank">https://www.gov.uk/government/publications/school-sport-and-activity-action-plan</a>. The plan sets out actions to help all pupils take part in sport and do more physical activity. The update builds on the government’s announcement in March 2023 that set out new ambitions for equal access to physical education (PE) and sport for girls and boys, 2 hours of PE a week alongside over £600 million funding for the Primary PE and Sport Premium (in academic years 2023/24 and 2024/25) and the School Games Organiser Network.</p><p> </p><p>The department will shortly be publishing new non-statutory guidance on PE and sport, exemplifying practice from primary and secondary schools. In recognition of the importance of young children being physically active, physical development is one of the three prime areas of learning as set out in the statutory Early Years Foundation Stage framework that all early years providers in England must follow. This can be found here: <a href="https://www.gov.uk/government/publications/early-years-foundation-stage-framework--2" target="_blank">https://www.gov.uk/government/publications/early-years-foundation-stage-framework--2</a>.</p>
answering member constituency East Hampshire more like this
answering member printed Damian Hinds more like this
question first answered
less than 2024-03-20T16:22:14.983Zmore like thismore than 2024-03-20T16:22:14.983Z
answering member
3969
label Biography information for Damian Hinds more like this
tabling member
4471
label Biography information for Rachael Maskell more like this
1695285
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Schools: Buildings more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, what recent estimate she has made of the total cost to the public purse of (a) repairing, (b) refurbishing and (c) rebuilding school buildings in the Greater London region. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 18143 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-22more like thismore than 2024-03-22
answer text <p>​​​​Well-maintained, safe school buildings are a priority for the department to support a high-quality education for all children. The department has allocated over £15 billion since 2015 for keeping schools safe and operational, including £1.8 billion in the 2023/24 financial year. In addition, the School Rebuilding Programme is transforming poor condition buildings at over 500 schools.</p><p>​​​It is the responsibility of those who run schools, such as academy trusts, local authorities and voluntary-aided school bodies, to manage the safety and maintenance of their schools based on local knowledge of their estates. They decide how to use annual funding provided, or when to apply to central programmes. Where there are serious issues with buildings that cannot be managed independently, the department provides additional support on a case-by-case basis.</p><p>This government introduced the Condition Data Collection (CDC), the first ever comprehensive survey of the school estate and one of the largest data collection programmes of its kind in Europe. The department’s evidence-led approach, following the James Review of Capital in 2011, has enabled the department to use consistent data on the condition of the school estate to inform capital allocations and funding policy. This means that the department targets more funding to where it is needed most, with schools in relatively poorer condition attracting more funding for their responsible body.</p><p>Almost all government funded schools in England were visited as part of the Condition Data Collection 1 (CDC1) programme between 2017 and 2019. Surveyors and engineers assessed the condition of multiple components of the schools' buildings and land within twelve primary building elements using an A-D rating. Key findings, including regional breakdowns, from the CDC1 can be found in the report, ‘Condition of School Buildings Survey – Key Findings’, which is available at: <a href="https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf" target="_blank">https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf</a>.</p><p>Significant capital investment has been provided since the CDC1 was carried out, and Condition Data Collection 2 (CDC2) is now in progress to provide updated information and will be completed by 2026. Early indications from the CDC2 data collection to date, and feedback from responsible bodies, showed that in almost every case where a D grade component was identified in the CDC1 report, it has since been addressed.</p><p>The list of schools that have been awarded a place on the School Rebuilding Programme can be found here: <a href="https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme" target="_blank">https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme</a>.</p><p>Funding for capital programmes up to the 2024/25 financial year comes from the department’s overall £19 billion capital budget set at the 2021 Spending Review. Capital budgets beyond 2024/25 will be determined through a Spending Review, in the normal way.</p>
answering member constituency East Hampshire more like this
answering member printed Damian Hinds more like this
grouped question UIN
18144 more like this
18145 more like this
18146 more like this
18147 more like this
18148 more like this
18149 more like this
18150 more like this
18151 more like this
question first answered
less than 2024-03-22T11:56:09.697Zmore like thismore than 2024-03-22T11:56:09.697Z
answering member
3969
label Biography information for Damian Hinds more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1695286
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Schools: Buildings more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, what recent estimate she has made of the total cost to the public purse of (a) repairing, (b) refurbishing and (c) rebuilding school buildings in the South East. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 18144 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-22more like thismore than 2024-03-22
answer text <p>​​​​Well-maintained, safe school buildings are a priority for the department to support a high-quality education for all children. The department has allocated over £15 billion since 2015 for keeping schools safe and operational, including £1.8 billion in the 2023/24 financial year. In addition, the School Rebuilding Programme is transforming poor condition buildings at over 500 schools.</p><p>​​​It is the responsibility of those who run schools, such as academy trusts, local authorities and voluntary-aided school bodies, to manage the safety and maintenance of their schools based on local knowledge of their estates. They decide how to use annual funding provided, or when to apply to central programmes. Where there are serious issues with buildings that cannot be managed independently, the department provides additional support on a case-by-case basis.</p><p>This government introduced the Condition Data Collection (CDC), the first ever comprehensive survey of the school estate and one of the largest data collection programmes of its kind in Europe. The department’s evidence-led approach, following the James Review of Capital in 2011, has enabled the department to use consistent data on the condition of the school estate to inform capital allocations and funding policy. This means that the department targets more funding to where it is needed most, with schools in relatively poorer condition attracting more funding for their responsible body.</p><p>Almost all government funded schools in England were visited as part of the Condition Data Collection 1 (CDC1) programme between 2017 and 2019. Surveyors and engineers assessed the condition of multiple components of the schools' buildings and land within twelve primary building elements using an A-D rating. Key findings, including regional breakdowns, from the CDC1 can be found in the report, ‘Condition of School Buildings Survey – Key Findings’, which is available at: <a href="https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf" target="_blank">https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf</a>.</p><p>Significant capital investment has been provided since the CDC1 was carried out, and Condition Data Collection 2 (CDC2) is now in progress to provide updated information and will be completed by 2026. Early indications from the CDC2 data collection to date, and feedback from responsible bodies, showed that in almost every case where a D grade component was identified in the CDC1 report, it has since been addressed.</p><p>The list of schools that have been awarded a place on the School Rebuilding Programme can be found here: <a href="https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme" target="_blank">https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme</a>.</p><p>Funding for capital programmes up to the 2024/25 financial year comes from the department’s overall £19 billion capital budget set at the 2021 Spending Review. Capital budgets beyond 2024/25 will be determined through a Spending Review, in the normal way.</p>
answering member constituency East Hampshire more like this
answering member printed Damian Hinds more like this
grouped question UIN
18143 more like this
18145 more like this
18146 more like this
18147 more like this
18148 more like this
18149 more like this
18150 more like this
18151 more like this
question first answered
less than 2024-03-22T11:56:09.773Zmore like thismore than 2024-03-22T11:56:09.773Z
answering member
3969
label Biography information for Damian Hinds more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1695288
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Schools: Buildings more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, what recent estimate she has made of the total cost to the public purse of (a) repairing, (b) refurbishing and (c) rebuilding school buildings in the South West. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 18145 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-22more like thismore than 2024-03-22
answer text <p>​​​​Well-maintained, safe school buildings are a priority for the department to support a high-quality education for all children. The department has allocated over £15 billion since 2015 for keeping schools safe and operational, including £1.8 billion in the 2023/24 financial year. In addition, the School Rebuilding Programme is transforming poor condition buildings at over 500 schools.</p><p>​​​It is the responsibility of those who run schools, such as academy trusts, local authorities and voluntary-aided school bodies, to manage the safety and maintenance of their schools based on local knowledge of their estates. They decide how to use annual funding provided, or when to apply to central programmes. Where there are serious issues with buildings that cannot be managed independently, the department provides additional support on a case-by-case basis.</p><p>This government introduced the Condition Data Collection (CDC), the first ever comprehensive survey of the school estate and one of the largest data collection programmes of its kind in Europe. The department’s evidence-led approach, following the James Review of Capital in 2011, has enabled the department to use consistent data on the condition of the school estate to inform capital allocations and funding policy. This means that the department targets more funding to where it is needed most, with schools in relatively poorer condition attracting more funding for their responsible body.</p><p>Almost all government funded schools in England were visited as part of the Condition Data Collection 1 (CDC1) programme between 2017 and 2019. Surveyors and engineers assessed the condition of multiple components of the schools' buildings and land within twelve primary building elements using an A-D rating. Key findings, including regional breakdowns, from the CDC1 can be found in the report, ‘Condition of School Buildings Survey – Key Findings’, which is available at: <a href="https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf" target="_blank">https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf</a>.</p><p>Significant capital investment has been provided since the CDC1 was carried out, and Condition Data Collection 2 (CDC2) is now in progress to provide updated information and will be completed by 2026. Early indications from the CDC2 data collection to date, and feedback from responsible bodies, showed that in almost every case where a D grade component was identified in the CDC1 report, it has since been addressed.</p><p>The list of schools that have been awarded a place on the School Rebuilding Programme can be found here: <a href="https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme" target="_blank">https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme</a>.</p><p>Funding for capital programmes up to the 2024/25 financial year comes from the department’s overall £19 billion capital budget set at the 2021 Spending Review. Capital budgets beyond 2024/25 will be determined through a Spending Review, in the normal way.</p>
answering member constituency East Hampshire more like this
answering member printed Damian Hinds more like this
grouped question UIN
18143 more like this
18144 more like this
18146 more like this
18147 more like this
18148 more like this
18149 more like this
18150 more like this
18151 more like this
question first answered
less than 2024-03-22T11:56:09.82Zmore like thismore than 2024-03-22T11:56:09.82Z
answering member
3969
label Biography information for Damian Hinds more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1695289
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Schools: Buildings more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, what recent estimate she has made of the total cost to the public purse of (a) repairing, (b) refurbishing and (c) rebuilding school buildings in the West Midlands. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 18146 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-22more like thismore than 2024-03-22
answer text <p>​​​​Well-maintained, safe school buildings are a priority for the department to support a high-quality education for all children. The department has allocated over £15 billion since 2015 for keeping schools safe and operational, including £1.8 billion in the 2023/24 financial year. In addition, the School Rebuilding Programme is transforming poor condition buildings at over 500 schools.</p><p>​​​It is the responsibility of those who run schools, such as academy trusts, local authorities and voluntary-aided school bodies, to manage the safety and maintenance of their schools based on local knowledge of their estates. They decide how to use annual funding provided, or when to apply to central programmes. Where there are serious issues with buildings that cannot be managed independently, the department provides additional support on a case-by-case basis.</p><p>This government introduced the Condition Data Collection (CDC), the first ever comprehensive survey of the school estate and one of the largest data collection programmes of its kind in Europe. The department’s evidence-led approach, following the James Review of Capital in 2011, has enabled the department to use consistent data on the condition of the school estate to inform capital allocations and funding policy. This means that the department targets more funding to where it is needed most, with schools in relatively poorer condition attracting more funding for their responsible body.</p><p>Almost all government funded schools in England were visited as part of the Condition Data Collection 1 (CDC1) programme between 2017 and 2019. Surveyors and engineers assessed the condition of multiple components of the schools' buildings and land within twelve primary building elements using an A-D rating. Key findings, including regional breakdowns, from the CDC1 can be found in the report, ‘Condition of School Buildings Survey – Key Findings’, which is available at: <a href="https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf" target="_blank">https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf</a>.</p><p>Significant capital investment has been provided since the CDC1 was carried out, and Condition Data Collection 2 (CDC2) is now in progress to provide updated information and will be completed by 2026. Early indications from the CDC2 data collection to date, and feedback from responsible bodies, showed that in almost every case where a D grade component was identified in the CDC1 report, it has since been addressed.</p><p>The list of schools that have been awarded a place on the School Rebuilding Programme can be found here: <a href="https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme" target="_blank">https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme</a>.</p><p>Funding for capital programmes up to the 2024/25 financial year comes from the department’s overall £19 billion capital budget set at the 2021 Spending Review. Capital budgets beyond 2024/25 will be determined through a Spending Review, in the normal way.</p>
answering member constituency East Hampshire more like this
answering member printed Damian Hinds more like this
grouped question UIN
18143 more like this
18144 more like this
18145 more like this
18147 more like this
18148 more like this
18149 more like this
18150 more like this
18151 more like this
question first answered
less than 2024-03-22T11:56:10.087Zmore like thismore than 2024-03-22T11:56:10.087Z
answering member
3969
label Biography information for Damian Hinds more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1695291
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Schools: Buildings more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, what recent estimate she has made of the total cost to the public purse of (a) repairing, (b) refurbishing and (c) rebuilding school buildings in the North West. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 18147 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-22more like thismore than 2024-03-22
answer text <p>​​​​Well-maintained, safe school buildings are a priority for the department to support a high-quality education for all children. The department has allocated over £15 billion since 2015 for keeping schools safe and operational, including £1.8 billion in the 2023/24 financial year. In addition, the School Rebuilding Programme is transforming poor condition buildings at over 500 schools.</p><p>​​​It is the responsibility of those who run schools, such as academy trusts, local authorities and voluntary-aided school bodies, to manage the safety and maintenance of their schools based on local knowledge of their estates. They decide how to use annual funding provided, or when to apply to central programmes. Where there are serious issues with buildings that cannot be managed independently, the department provides additional support on a case-by-case basis.</p><p>This government introduced the Condition Data Collection (CDC), the first ever comprehensive survey of the school estate and one of the largest data collection programmes of its kind in Europe. The department’s evidence-led approach, following the James Review of Capital in 2011, has enabled the department to use consistent data on the condition of the school estate to inform capital allocations and funding policy. This means that the department targets more funding to where it is needed most, with schools in relatively poorer condition attracting more funding for their responsible body.</p><p>Almost all government funded schools in England were visited as part of the Condition Data Collection 1 (CDC1) programme between 2017 and 2019. Surveyors and engineers assessed the condition of multiple components of the schools' buildings and land within twelve primary building elements using an A-D rating. Key findings, including regional breakdowns, from the CDC1 can be found in the report, ‘Condition of School Buildings Survey – Key Findings’, which is available at: <a href="https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf" target="_blank">https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf</a>.</p><p>Significant capital investment has been provided since the CDC1 was carried out, and Condition Data Collection 2 (CDC2) is now in progress to provide updated information and will be completed by 2026. Early indications from the CDC2 data collection to date, and feedback from responsible bodies, showed that in almost every case where a D grade component was identified in the CDC1 report, it has since been addressed.</p><p>The list of schools that have been awarded a place on the School Rebuilding Programme can be found here: <a href="https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme" target="_blank">https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme</a>.</p><p>Funding for capital programmes up to the 2024/25 financial year comes from the department’s overall £19 billion capital budget set at the 2021 Spending Review. Capital budgets beyond 2024/25 will be determined through a Spending Review, in the normal way.</p>
answering member constituency East Hampshire more like this
answering member printed Damian Hinds more like this
grouped question UIN
18143 more like this
18144 more like this
18145 more like this
18146 more like this
18148 more like this
18149 more like this
18150 more like this
18151 more like this
question first answered
less than 2024-03-22T11:56:10.163Zmore like thismore than 2024-03-22T11:56:10.163Z
answering member
3969
label Biography information for Damian Hinds more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1695292
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Schools: Buildings more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, what recent estimate she has made of the total cost to the public purse of (a) repairing, (b) refurbishing and (c) rebuilding school buildings in the North East. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 18148 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-22more like thismore than 2024-03-22
answer text <p>​​​​Well-maintained, safe school buildings are a priority for the department to support a high-quality education for all children. The department has allocated over £15 billion since 2015 for keeping schools safe and operational, including £1.8 billion in the 2023/24 financial year. In addition, the School Rebuilding Programme is transforming poor condition buildings at over 500 schools.</p><p>​​​It is the responsibility of those who run schools, such as academy trusts, local authorities and voluntary-aided school bodies, to manage the safety and maintenance of their schools based on local knowledge of their estates. They decide how to use annual funding provided, or when to apply to central programmes. Where there are serious issues with buildings that cannot be managed independently, the department provides additional support on a case-by-case basis.</p><p>This government introduced the Condition Data Collection (CDC), the first ever comprehensive survey of the school estate and one of the largest data collection programmes of its kind in Europe. The department’s evidence-led approach, following the James Review of Capital in 2011, has enabled the department to use consistent data on the condition of the school estate to inform capital allocations and funding policy. This means that the department targets more funding to where it is needed most, with schools in relatively poorer condition attracting more funding for their responsible body.</p><p>Almost all government funded schools in England were visited as part of the Condition Data Collection 1 (CDC1) programme between 2017 and 2019. Surveyors and engineers assessed the condition of multiple components of the schools' buildings and land within twelve primary building elements using an A-D rating. Key findings, including regional breakdowns, from the CDC1 can be found in the report, ‘Condition of School Buildings Survey – Key Findings’, which is available at: <a href="https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf" target="_blank">https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf</a>.</p><p>Significant capital investment has been provided since the CDC1 was carried out, and Condition Data Collection 2 (CDC2) is now in progress to provide updated information and will be completed by 2026. Early indications from the CDC2 data collection to date, and feedback from responsible bodies, showed that in almost every case where a D grade component was identified in the CDC1 report, it has since been addressed.</p><p>The list of schools that have been awarded a place on the School Rebuilding Programme can be found here: <a href="https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme" target="_blank">https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme</a>.</p><p>Funding for capital programmes up to the 2024/25 financial year comes from the department’s overall £19 billion capital budget set at the 2021 Spending Review. Capital budgets beyond 2024/25 will be determined through a Spending Review, in the normal way.</p>
answering member constituency East Hampshire more like this
answering member printed Damian Hinds more like this
grouped question UIN
18143 more like this
18144 more like this
18145 more like this
18146 more like this
18147 more like this
18149 more like this
18150 more like this
18151 more like this
question first answered
less than 2024-03-22T11:56:10.243Zmore like thismore than 2024-03-22T11:56:10.243Z
answering member
3969
label Biography information for Damian Hinds more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1695294
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Schools: Buildings more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, what recent estimate she has made of the total cost to the public purse of (a) repairing, (b) refurbishing and (c) rebuilding school buildings in the East Midlands. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 18149 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-22more like thismore than 2024-03-22
answer text <p>​​​​Well-maintained, safe school buildings are a priority for the department to support a high-quality education for all children. The department has allocated over £15 billion since 2015 for keeping schools safe and operational, including £1.8 billion in the 2023/24 financial year. In addition, the School Rebuilding Programme is transforming poor condition buildings at over 500 schools.</p><p>​​​It is the responsibility of those who run schools, such as academy trusts, local authorities and voluntary-aided school bodies, to manage the safety and maintenance of their schools based on local knowledge of their estates. They decide how to use annual funding provided, or when to apply to central programmes. Where there are serious issues with buildings that cannot be managed independently, the department provides additional support on a case-by-case basis.</p><p>This government introduced the Condition Data Collection (CDC), the first ever comprehensive survey of the school estate and one of the largest data collection programmes of its kind in Europe. The department’s evidence-led approach, following the James Review of Capital in 2011, has enabled the department to use consistent data on the condition of the school estate to inform capital allocations and funding policy. This means that the department targets more funding to where it is needed most, with schools in relatively poorer condition attracting more funding for their responsible body.</p><p>Almost all government funded schools in England were visited as part of the Condition Data Collection 1 (CDC1) programme between 2017 and 2019. Surveyors and engineers assessed the condition of multiple components of the schools' buildings and land within twelve primary building elements using an A-D rating. Key findings, including regional breakdowns, from the CDC1 can be found in the report, ‘Condition of School Buildings Survey – Key Findings’, which is available at: <a href="https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf" target="_blank">https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf</a>.</p><p>Significant capital investment has been provided since the CDC1 was carried out, and Condition Data Collection 2 (CDC2) is now in progress to provide updated information and will be completed by 2026. Early indications from the CDC2 data collection to date, and feedback from responsible bodies, showed that in almost every case where a D grade component was identified in the CDC1 report, it has since been addressed.</p><p>The list of schools that have been awarded a place on the School Rebuilding Programme can be found here: <a href="https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme" target="_blank">https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme</a>.</p><p>Funding for capital programmes up to the 2024/25 financial year comes from the department’s overall £19 billion capital budget set at the 2021 Spending Review. Capital budgets beyond 2024/25 will be determined through a Spending Review, in the normal way.</p>
answering member constituency East Hampshire more like this
answering member printed Damian Hinds more like this
grouped question UIN
18143 more like this
18144 more like this
18145 more like this
18146 more like this
18147 more like this
18148 more like this
18150 more like this
18151 more like this
question first answered
less than 2024-03-22T11:56:10.32Zmore like thismore than 2024-03-22T11:56:10.32Z
answering member
3969
label Biography information for Damian Hinds more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1695295
registered interest false more like this
date less than 2024-03-12more like thismore than 2024-03-12
answering body
Department for Education more like this
answering dept id 60 more like this
answering dept short name Education more like this
answering dept sort name Education remove filter
hansard heading Schools: Buildings more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Education, what recent estimate she has made of the total cost to the public purse of (a) repairing, (b) refurbishing and (c) rebuilding school buildings in the East. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 18150 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2024-03-22more like thismore than 2024-03-22
answer text <p>​​​​Well-maintained, safe school buildings are a priority for the department to support a high-quality education for all children. The department has allocated over £15 billion since 2015 for keeping schools safe and operational, including £1.8 billion in the 2023/24 financial year. In addition, the School Rebuilding Programme is transforming poor condition buildings at over 500 schools.</p><p>​​​It is the responsibility of those who run schools, such as academy trusts, local authorities and voluntary-aided school bodies, to manage the safety and maintenance of their schools based on local knowledge of their estates. They decide how to use annual funding provided, or when to apply to central programmes. Where there are serious issues with buildings that cannot be managed independently, the department provides additional support on a case-by-case basis.</p><p>This government introduced the Condition Data Collection (CDC), the first ever comprehensive survey of the school estate and one of the largest data collection programmes of its kind in Europe. The department’s evidence-led approach, following the James Review of Capital in 2011, has enabled the department to use consistent data on the condition of the school estate to inform capital allocations and funding policy. This means that the department targets more funding to where it is needed most, with schools in relatively poorer condition attracting more funding for their responsible body.</p><p>Almost all government funded schools in England were visited as part of the Condition Data Collection 1 (CDC1) programme between 2017 and 2019. Surveyors and engineers assessed the condition of multiple components of the schools' buildings and land within twelve primary building elements using an A-D rating. Key findings, including regional breakdowns, from the CDC1 can be found in the report, ‘Condition of School Buildings Survey – Key Findings’, which is available at: <a href="https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf" target="_blank">https://assets.publishing.service.gov.uk/media/60af7cbbe90e071b54214c82/Condition_of_School_Buildings_Survey_CDC1_-_key_findings_report.pdf</a>.</p><p>Significant capital investment has been provided since the CDC1 was carried out, and Condition Data Collection 2 (CDC2) is now in progress to provide updated information and will be completed by 2026. Early indications from the CDC2 data collection to date, and feedback from responsible bodies, showed that in almost every case where a D grade component was identified in the CDC1 report, it has since been addressed.</p><p>The list of schools that have been awarded a place on the School Rebuilding Programme can be found here: <a href="https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme" target="_blank">https://www.gov.uk/government/publications/school-rebuilding-programme-schools-in-the-programme</a>.</p><p>Funding for capital programmes up to the 2024/25 financial year comes from the department’s overall £19 billion capital budget set at the 2021 Spending Review. Capital budgets beyond 2024/25 will be determined through a Spending Review, in the normal way.</p>
answering member constituency East Hampshire more like this
answering member printed Damian Hinds more like this
grouped question UIN
18143 more like this
18144 more like this
18145 more like this
18146 more like this
18147 more like this
18148 more like this
18149 more like this
18151 more like this
question first answered
less than 2024-03-22T11:56:10.587Zmore like thismore than 2024-03-22T11:56:10.587Z
answering member
3969
label Biography information for Damian Hinds more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this