<p>From Highways England’s records that are readily available,</p><p> </p><p> </p><p>
</p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p /> <p> </p><p /> <p>(1) The
last major maintenance work at the junction of the M6 and the A38 (M), known as Spaghetti
Junction was undertaken in 1995.</p><p /> <p> </p><p /> <p> </p><p /> <p> </p><p />
<p>(2) The last major maintenance work at the elevated section of the M5 between junctions
1 and 2 was undertaken in 1987.</p><p /> <p> </p><p /> <p> </p><p /> <p> </p><p> </p><p>
</p><p> </p><p> </p><p> </p><p> </p><p> </p><p /> <p>On the matter of the annual maintenance
cost:</p><p /> <p> </p><p /> <p> </p><p /> <p> </p><p /> <p>The cost of maintaining
the motorway junction of the M6 with the A38(M), known as Spaghetti Junction was approximately
£8.2m for the 12 month period July 2014 to June2015.</p><p /> <p> </p><p /> <p> </p><p
/> <p> </p><p /> <p>Costs for earlier periods are not readily available.</p><p />
<p> </p><p /> <p> </p><p /> <p> </p><p /> <p>The cost of maintaining the elevated
section of the M5 between junctions 1 and 2 was approximately £2.4m for the 12 month
period July 2014 to June 2015.</p><p /> <p> </p><p /> <p> </p><p /> <p> </p><p />
<p>Costs for earlier periods are not readily available.</p><p /> <p> </p><p> </p>
|
|