Linked Data API

Show Search Form

Search Results

711154
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 remove filter
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Great Western Main Line: Electrification more like this
house id 2 remove filter
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty’s Government, further to the answer by Lord Ahmad of Wimbledon on 14 March, whether the electrification of the Great Western main line will include improved internal lighting in passenger carriages. more like this
tabling member printed
Lord Hylton more like this
uin HL6042 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-03-21more like thismore than 2017-03-21
answer text <p>Two types of electric trains replace the existing diesel trains on the Great Western Main Line following electrification. Class 387 electric trains replace diesel commuter trains in the Thames Valley. They are brand new trains built by Bombardier to the most modern standards, including in respect of lighting and disabled accessibility. The first are already in service on the route between Hayes &amp; Harlington and Paddington. The other type of train is the Intercity Express, which replaces diesel trains on the long-distance routes from Paddington. This is also a brand new train, built by Hitachi, again to the most modern standards, including in respect of lighting and disabled accessibility.</p> more like this
answering member printed Lord Ahmad of Wimbledon more like this
question first answered
less than 2017-03-21T12:29:21.607Zmore like thismore than 2017-03-21T12:29:21.607Z
answering member
4210
label Biography information for Lord Ahmad of Wimbledon more like this
tabling member
2018
label Biography information for Lord Hylton more like this
711159
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 remove filter
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading East Coast Main Line: Repairs and Maintenance more like this
house id 2 remove filter
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty’s Government, in the light of disruption to services on the East Coast mainline, what recent discussions they have held with Network Rail on its maintenance programme; and when the existing overhead electric wires will be replaced. more like this
tabling member printed
Baroness McIntosh of Pickering more like this
uin HL6047 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-03-27more like thismore than 2017-03-27
answer text <p>Whilst the maintenance and renewal of rail infrastructure, including the overhead electricity supply, is a matter for Network Rail overseen by the independent regulator, the Office of Rail and Road, we have regular discussions with Network Rail throughout the year regarding their performance. Future plans for renewal of overhead lines on this route will be set out in Network Rail’s Strategic Business Plan later this year.</p> more like this
answering member printed Lord Ahmad of Wimbledon more like this
question first answered
less than 2017-03-27T13:24:29.193Zmore like thismore than 2017-03-27T13:24:29.193Z
answering member
4210
label Biography information for Lord Ahmad of Wimbledon more like this
tabling member
384
label Biography information for Baroness McIntosh of Pickering more like this
711173
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 remove filter
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading East Coast Main Line more like this
house id 2 remove filter
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty’s Government, in the light of the incident at Retford on the East Coast Main Line on Thursday 9 March, and given that only hybrid trains can use the diversionary routes that are available, whether they intend to review the decision to go for a mostly electric fleet for the line as part of the Inter City Express Programme; what financial resources are available in Control Period 5, 2014 to 2019, to improve the reliability of the infrastructure on the line; and what resources they plan to make available in Control Period 6, 2019 to 2024. more like this
tabling member printed
Lord Bradshaw more like this
uin HL6061 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-03-22more like thismore than 2017-03-22
answer text <p>There are no plans to review the make-up of the new East Coast fleet. Each electric set also has a small diesel engine so it can get passengers to the next station in the event of de-wirement or power loss.</p><p> </p><p>In Control Period 5, Network Rail plan to spend £3 billion (in 2012-13 prices) on maintaining and renewing the London and North East Route, which includes the East Coast Main Line. The planned spend for Control Period 6 will be finalised later this year.</p><p> </p> more like this
answering member printed Lord Ahmad of Wimbledon more like this
question first answered
less than 2017-03-22T12:09:14.007Zmore like thismore than 2017-03-22T12:09:14.007Z
answering member
4210
label Biography information for Lord Ahmad of Wimbledon more like this
tabling member
2483
label Biography information for Lord Bradshaw more like this
711174
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 remove filter
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Felixstowe Branch Line more like this
house id 2 remove filter
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty’s Government, further to the Written Answer by Lord Ahmad of Wimbledon on 14 March (HL5764), what assessment they have made of the extent to which the use of a rail replacement bus service in place of passenger trains at less busy times on the rail line between Ipswich and Felixstowe would fulfil the public service obligations of (1) the operator, and (2) Network Rail. more like this
tabling member printed
Lord Bradshaw more like this
uin HL6062 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-03-21more like thismore than 2017-03-21
answer text <p>No assessment has been made by the Department of the extent to which the use of rail replacement bus service in place for passenger trains at less busy times on the rail line between Ipswich and Felixstowe would fulfil the public service obligation of the operator, and Network Rail.</p> more like this
answering member printed Lord Ahmad of Wimbledon more like this
question first answered
less than 2017-03-21T12:30:08.803Zmore like thismore than 2017-03-21T12:30:08.803Z
answering member
4210
label Biography information for Lord Ahmad of Wimbledon more like this
tabling member
2483
label Biography information for Lord Bradshaw more like this
711185
registered interest false more like this
date remove filter
answering body
Department for Transport more like this
answering dept id 27 remove filter
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading High Speed 2 Line more like this
house id 2 remove filter
legislature
25277
pref label House of Lords more like this
question text To ask Her Majesty’s Government, further to the Written Answer by Lord Ahmad of Wimbledon on 9 March (HL5562), what assessment they have made of advice from SNCF quoted in the March edition of Railway Gazette International that operating above 320 km/h incurs significantly higher track maintenance costs. more like this
tabling member printed
Lord Berkeley more like this
uin HL6073 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2017-03-23more like thismore than 2017-03-23
answer text <p>HS2 Ltd has collaborated with several high speed rail Infrastructure Managers, including SNCF, to ascertain the implications of running trains at 360km/h.</p><p> </p><p>Using recommendations based on experiences of managing High Speed Lines in Europe, HS2 Ltd intends to incorporate specific components in the track design which will improve the system performance whilst utilising an Infrastructure Management System that determines asset performance and condition at all times.</p><p> </p><p>The combination of these factors and the use of innovative maintenance activities, that go beyond current best practice, should reduce the maintenance implications of running at these speeds.</p> more like this
answering member printed Lord Ahmad of Wimbledon more like this
question first answered
less than 2017-03-23T11:47:12.827Zmore like thismore than 2017-03-23T11:47:12.827Z
answering member
4210
label Biography information for Lord Ahmad of Wimbledon more like this
tabling member
3526
label Biography information for Lord Berkeley more like this