answer text |
<p>National Grid is responsible for specifying and reviewing the technical requirements
for connection to, and use of, the National Electricity Transmission System. Wind
turbine Fault Ride Through requirements were introduced by National Grid in June 2005
following consultation.</p><p>National Grid and the Department for Business, Energy
and Industrial Strategy continue to engage with the Australian Electricity Market
Operator to understand the causes of the South Australia Blackout Event on 28<sup>th</sup>
September 2016 and identify any learning relevant to the GB National Electricity Transmission
System.</p>
|
|