<p>On 24 May 2011, the then Secretary of State confirmed that 261 schools would be
rebuilt, or have their condition needs met through the Priority School Building Programme
(PSBP). These schools were selected on the basis of their condition need.</p><p>For
delivery purposes, the 261 schools have been grouped into batches taking geography
and commercial viability into consideration. We have sought to prioritise the delivery
of those batches containing schools in the worst condition.</p><p>In June 2014, a
second phase of the PSBP was launched. The schools to be included in this second phase
of the PSBP will again be determined solely on the basis of their condition need.</p>
|
|