Linked Data API

Show Search Form

Search Results

1091274
registered interest false more like this
date less than 2019-03-19more like thismore than 2019-03-19
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Biofuels and Wind Power: Finance more like this
house id 1 remove filter
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy if he will make it his policy to create parity under Contract for Difference allocation rounds two and three between dedicated biomass with CHP and offshore wind; and if he will make a statement. more like this
tabling member constituency Stirling remove filter
tabling member printed
Stephen Kerr more like this
uin 234222 more like this
answer
answer
is ministerial correction false remove filter
date of answer remove maximum value filtermore like thismore than 2019-03-26
answer text <p>A draft budget notice was published in November 2018, which outlined the proposed Administrative Strike Prices (ASPs) for all technologies eligible to compete in the next allocation round, this notice can be found here: <a href="https://www.gov.uk/government/publications/contracts-for-difference-cfd-draft-budget-notice-for-the-third-allocation-round" target="_blank">https://www.gov.uk/government/publications/contracts-for-difference-cfd-draft-budget-notice-for-the-third-allocation-round</a></p><p> </p><p>In setting the ASPs, the government has drawn upon the latest generation cost data, while also considering market conditions, policy considerations and other technology specific factors in order to encourage new investment whilst ensuring value for money for consumers.</p><p> </p><p>The methodology used to determine the draft ASPs for the third allocation round is published here: <a href="https://www.gov.uk/government/publications/contract-for-difference-cfd-third-allocation-round-methodology-used-to-set-administrative-strike-prices" target="_blank">https://www.gov.uk/government/publications/contract-for-difference-cfd-third-allocation-round-methodology-used-to-set-administrative-strike-prices</a></p>
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
question first answered
less than 2019-03-26T15:27:40.297Zmore like thisremove minimum value filter
answering member
3974
label Biography information for Claire Perry more like this
tabling member
4604
label Biography information for Stephen Kerr more like this
1091275
registered interest false more like this
date less than 2019-03-19more like thismore than 2019-03-19
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Biofuels: Grangemouth more like this
house id 1 remove filter
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial, if he will provide an update on the delivery of the Grangemouth Renewable Energy Plant which was awarded a Contract for Difference in 2017 as part of CfD allocation round two. more like this
tabling member constituency Stirling remove filter
tabling member printed
Stephen Kerr more like this
uin 234223 more like this
answer
answer
is ministerial correction false remove filter
date of answer remove maximum value filtermore like thismore than 2019-03-26
answer text <p>The Low Carbon Contracts Company (LCCC) announced on 19 October 2018 its decision to terminate the contract for difference (CfD) awarded to Grangemouth Renewable Energy Plant for failing to make sufficient progress by the Milestone Delivery Date. The press release is available on the LCCC’s web site - <a href="https://www.lowcarboncontracts.uk/" target="_blank">https://www.lowcarboncontracts.uk/</a></p><p> </p><p>CfDs are private law contracts between a generator and the LCCC, and decisions relating to whether a generator has met its milestone requirement are for the LCCC.</p> more like this
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
question first answered
less than 2019-03-26T15:27:49.17Zmore like thismore than 2019-03-26T15:27:49.17Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
4604
label Biography information for Stephen Kerr more like this
1091276
registered interest false more like this
date less than 2019-03-19more like thismore than 2019-03-19
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Renewable Heat Incentive Scheme: Cost Effectiveness more like this
house id 1 remove filter
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what assessment he has made of the value for money of the renewable heat incentive subsidy mechanism; and if he will make a statement. more like this
tabling member constituency Stirling remove filter
tabling member printed
Stephen Kerr more like this
uin 234224 more like this
answer
answer
is ministerial correction false remove filter
date of answer remove maximum value filtermore like thismore than 2019-03-26
answer text <p>The Renewable Heat Incentive (RHI) compares favourably to other ways of saving carbon or generating renewable energy across the economy, contributes to our renewable targets, and plays a significant role in supporting supply chains in the renewable heating industry.</p><p> </p><p>The Department for Business, Energy and Industrial Strategy (BEIS), and prior to BEIS, the Department for Energy and Climate Change (DECC) has made regular assessments of value for money in the RHI subsidy mechanism. The latest scheme Impact Assessment was made in February 2018 and is available on GOV.UK.</p><p> </p><p>The RHI was reformed in 2017 and 2018 to focus on long-term decarbonisation, improve consumer protection, support supply chain growth and improve value for money for the taxpayer. These reforms included setting maximum heat demand limits for biomass, air source and ground source heat pumps in the Domestic RHI, removing wood drying as an eligible heat use for the Non-domestic scheme and giving Ofgem greater enforcement powers.</p>
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
question first answered
less than 2019-03-26T15:27:56.257Zmore like thismore than 2019-03-26T15:27:56.257Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
4604
label Biography information for Stephen Kerr more like this
1091278
registered interest false more like this
date less than 2019-03-19more like thismore than 2019-03-19
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Renewable Heat Incentive Scheme more like this
house id 1 remove filter
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, with reference to the Committee on Climate Change’s Biomass in a Low Carbon Economy Report published in November 2018 and the Department of Environment, Food and Rural Affairs’ Clean Air Strategy published in January 2019, what plans he has for the future of the renewable heat incentive. more like this
tabling member constituency Stirling remove filter
tabling member printed
Stephen Kerr more like this
uin 234226 more like this
answer
answer
is ministerial correction false remove filter
date of answer remove maximum value filtermore like thismore than 2019-03-26
answer text <p>In the Clean Air Strategy, the Government committed to consult on removing Renewable Heat Incentive Scheme support for new biomass installations in urban areas which are on the gas grid. The Government published the consultation <a href="https://beisgovuk.citizenspace.com/heat/rhi-biomass-combustion-in-urban-areas/" target="_blank">Renewable Heat Incentive: Biomass Combustion in Urban Areas</a>, seeking views on a number of proposals including the removal of RHI support for some or all or some new biomass boilers in urban areas, imposing geographical restrictions on biogas combustion and introducing regular maintenance checks on existing biomass boilers under the RHI. We will be publishing a government response to this consultation shortly.</p> more like this
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
question first answered
less than 2019-03-26T15:28:03.39Zmore like thismore than 2019-03-26T15:28:03.39Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
4604
label Biography information for Stephen Kerr more like this
1091281
registered interest false more like this
date less than 2019-03-19more like thismore than 2019-03-19
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading District Heating: Fuels more like this
house id 1 remove filter
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, information his Department holds on the fuel sources for district heating systems delivered under the Government’s Heat Networks Investment Programme from April 2019, and if he will make a statement. more like this
tabling member constituency Stirling remove filter
tabling member printed
Stephen Kerr more like this
uin 234229 more like this
answer
answer
is ministerial correction false remove filter
date of answer remove maximum value filtermore like thismore than 2019-03-26
answer text <p>In December 2018 we published in ‘<a href="https://www.gov.uk/government/publications/heat-networks-developing-a-market-framework" target="_blank">Heat networks: Developing a market framework</a>’ our estimate of the fuel sources that will be used in projects that will come forward under the Heat Network Investment Project. The assumed technology mix is displayed in the figure below. The estimate is based on analysis of HNIP pilot data and surveys of the project pipeline. The estimate is dynamic as it is assumed original CHP plants are replaced with lower-carbon systems at the end of their operational life.</p><p> </p><p>The estimated technology mix is 22% gas back-up boiler, 33% gas CHP, 20% EfW incinerator, 5% biomass, 10% heat pump and 10% waste heat recovery.</p><p> </p> more like this
answering member constituency Devizes more like this
answering member printed Claire Perry more like this
question first answered
less than 2019-03-26T15:28:10.713Zmore like thismore than 2019-03-26T15:28:10.713Z
answering member
3974
label Biography information for Claire Perry more like this
tabling member
4604
label Biography information for Stephen Kerr more like this