<p>Solar projects recorded on the Renewable Energy Planning Database (REPD) in each
quarter since 2014 are in the following table. Please note that the management of
the REPD changed in October 2014 and the historical data for 2013 and 2014 Q1 is not
available.</p><p> </p><p>As part of the new contract for administering the REPD at
the start of Q4 2014, the data parameters were changed to increase the minimum installed
capacity from 0.001MW to 1MW. Therefore, the data shown from Q4 2014 onwards includes
only those schemes with an installed capacity 1MW or above until Q4 2018 when projects
over 150kW started to be included.</p>
|
|