Linked Data API

Show Search Form

Search Results

1016337
registered interest false more like this
date less than 2018-11-28more like thismore than 2018-11-28
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading High Speed 2 Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether he has made an assessment of the potential merits of using geotechnical baseline reports to assess the possible (a) settlement damage to and (b) strengthening required for buildings along the High Speed Two London tunnel route. more like this
tabling member constituency Hampstead and Kilburn more like this
tabling member printed
Tulip Siddiq remove filter
uin 196819 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>A geotechnical baseline report (GBR) is a contractual document that defines what the Contractor has to allow for in his price. The actual geotechnical parameters from HS2 project ground investigations have been and are being used for the assessment of “all” buildings impacted by the works including potential ground movements associated with excavations and to assess, in the rare event, any necessary remedial measures. For further information for Phases 1 &amp; 2a see HS2 Information Papers C3 &amp; C14 – Ground Settlement, respectively.</p> more like this
answering member constituency Wealden more like this
answering member printed Ms Nusrat Ghani more like this
question first answered
less than 2018-12-03T14:38:49.783Zmore like thismore than 2018-12-03T14:38:49.783Z
answering member
4460
label Biography information for Ms Nusrat Ghani more like this
tabling member
4518
label Biography information for Tulip Siddiq more like this
1016346
registered interest false more like this
date less than 2018-11-28more like thismore than 2018-11-28
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading High Speed 2 Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what his latest estimate is of the total cost of High Speed Two; and how much of that funding has been spent. more like this
tabling member constituency Hampstead and Kilburn more like this
tabling member printed
Tulip Siddiq remove filter
uin 196823 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>The total funding envelope of the High Speed 2 project was set at £55.7bn (2015 prices) as part of the 2015 Spending Review settlement.</p><p>The total spend to date is £5.5bn (nominal), inclusive of the financial years 2009-10 to 2017-18.</p> more like this
answering member constituency Wealden more like this
answering member printed Ms Nusrat Ghani more like this
question first answered
less than 2018-12-03T14:36:53.933Zmore like thismore than 2018-12-03T14:36:53.933Z
answering member
4460
label Biography information for Ms Nusrat Ghani more like this
tabling member
4518
label Biography information for Tulip Siddiq more like this
1016365
registered interest false more like this
date less than 2018-11-28more like thismore than 2018-11-28
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading High Speed 2 Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, whether he has had discussions with HS2 Ltd on the use of target cost contracts instead of geotechnical baseline reports; and what assessment he has made of the potential effect on the level of compensation arising from damage to vulnerable buildings along the High Speed Two construction route of excluding the use of those reports. more like this
tabling member constituency Hampstead and Kilburn more like this
tabling member printed
Tulip Siddiq remove filter
uin 196827 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>The actual geotechnical parameters from HS2 project ground investigations have been and are being used for the assessment of buildings impacted by the works. Geotechnical baseline reports (GBR) are not precluded by target cost contracts however their use is not considered relevant for the assessment of the impact of potential ground movement on buildings or associated compensation.</p> more like this
answering member constituency Wealden more like this
answering member printed Ms Nusrat Ghani more like this
question first answered
remove maximum value filtermore like thismore than 2018-12-03T14:53:21.353Z
answering member
4460
label Biography information for Ms Nusrat Ghani more like this
tabling member
4518
label Biography information for Tulip Siddiq more like this