1145690
registered interest false more like this
date less than 2019-09-25more like thismore than 2019-09-25
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Fuel Poverty: North Yorkshire more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, how many households in (a) York Central constituency, (b) City of York local authority area and (c) North Yorkshire are living in fuel poverty. more like this
tabling member constituency York Central more like this
tabling member printed
Rachael Maskell more like this
uin 290714 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-09-30more like thismore than 2019-09-30
answer text <p>The latest sub-regional fuel poverty statistics can be found here:</p><p> </p><p><a href="https://www.gov.uk/government/collections/fuel-poverty-sub-regional-statistics" target="_blank">https://www.gov.uk/government/collections/fuel-poverty-sub-regional-statistics</a>.</p> more like this
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
question first answered
less than 2019-09-30T15:37:55.5Zmore like thismore than 2019-09-30T15:37:55.5Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4471
label Biography information for Rachael Maskell more like this
1145530
registered interest false more like this
date less than 2019-09-24more like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Oil more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what assessment she has made of the effect on the energy supply of the downgrade in the forecast for oil demand growth in 2019. more like this
tabling member constituency Morley and Outwood more like this
tabling member printed
Andrea Jenkyns more like this
uin 290430 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Indigenous oil production was equivalent to around 70 percent of the UK’s oil demand in 2018 and plays an important role in meeting our energy needs. The UK also benefits from diverse sources of supply through access to a global market for crude oil and refined oil products. Growth in global oil demand is expected to be lower than originally forecast for 2019, helping to ensure there are healthy levels of global oil stocks and resilience to global oil supply disruptions.</p> more like this
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
question first answered
less than 2019-10-01T15:20:23.427Zmore like thismore than 2019-10-01T15:20:23.427Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4490
label Biography information for Dame Andrea Jenkyns more like this
1145547
registered interest false more like this
date less than 2019-09-24more like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Chippenham Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Chippenham Natural Gas Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290403 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
grouped question UIN
290404 more like this
290405 more like this
290406 more like this
290407 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.427Zmore like thismore than 2019-10-01T15:27:47.427Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145548
registered interest false more like this
date less than 2019-09-24more like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading West Burton Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of West Burton GT Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290404 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
grouped question UIN
290403 more like this
290405 more like this
290406 more like this
290407 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.497Zmore like thismore than 2019-10-01T15:27:47.497Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145549
registered interest false more like this
date less than 2019-09-24more like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Cottam Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) decommissioning date is of Cottam Coal Power Station; and what plans are in place to replace that capacity when the power station is decommissioned. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290405 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
grouped question UIN
290403 more like this
290404 more like this
290406 more like this
290407 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.577Zmore like thismore than 2019-10-01T15:27:47.577Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145550
registered interest false more like this
date less than 2019-09-24more like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Didcot B Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Didcot GT Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290406 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
grouped question UIN
290403 more like this
290404 more like this
290405 more like this
290407 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.64Zmore like thismore than 2019-10-01T15:27:47.64Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145551
registered interest false more like this
date less than 2019-09-24more like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Little Barford Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Little Barford GT Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290407 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
grouped question UIN
290403 more like this
290404 more like this
290405 more like this
290406 more like this
290408 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.717Zmore like thismore than 2019-10-01T15:27:47.717Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145553
registered interest false more like this
date less than 2019-09-24more like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Loch Carnan Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Loch Carnan, South Uist Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290408 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
grouped question UIN
290403 more like this
290404 more like this
290405 more like this
290406 more like this
290407 more like this
290409 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.797Zmore like thismore than 2019-10-01T15:27:47.797Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145554
registered interest false more like this
date less than 2019-09-24more like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Grain Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Grain GT Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290409 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
grouped question UIN
290403 more like this
290404 more like this
290405 more like this
290406 more like this
290407 more like this
290408 more like this
290410 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.873Zmore like thismore than 2019-10-01T15:27:47.873Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this
1145555
registered interest false more like this
date less than 2019-09-24more like thismore than 2019-09-24
answering body
Department for Business, Energy and Industrial Strategy more like this
answering dept id 201 more like this
answering dept short name Business, Energy and Industrial Strategy more like this
answering dept sort name Business, Energy and Industrial Strategy more like this
hansard heading Sutton Bridge Power Station more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Business, Energy and Industrial Strategy, what the (a) generation capacity and (b) estimated decommissioning date is of Sutton Bridge Natural Gas Power Station. more like this
tabling member constituency Kilmarnock and Loudoun more like this
tabling member printed
Alan Brown more like this
uin 290410 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2019-10-01more like thismore than 2019-10-01
answer text <p>Generation capacity information for GB can be located on the TEC Register on the National Grid ESO website at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.nationalgrideso.com%2Fdocument%2F149106%2Fdownload&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991952732&amp;sdata=A8FrzHurWMySTYT4zjecivZspgX5IZ6osF5KIGujfG0%3D&amp;reserved=0" target="_blank">https://www.nationalgrideso.com/document/149106/download</a></p><p> </p><p>Generation capacity information for NI can be located in the annual All-Island Generation Capacity Statement produced by the Transmission System Operators for Ireland and Northern Ireland, the most recent of which can be found at <a href="https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.eirgridgroup.com%2Fsite-files%2Flibrary%2FEirGrid%2FGeneration_Capacity_Statement_2018.pdf&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=MdDKvLyklDmG%2B%2FG3M4pnZCyq49Ufne%2FVpOdy%2B0%2Bjjts%3D&amp;reserved=0" target="_blank">http://www.eirgridgroup.com/site-files/library/EirGrid/Generation_Capacity_Statement_2018.pdf</a></p><p> </p><p>The Capacity Market provides an effective mechanism for bringing forward capacity in GB as and when it is needed. The Capacity Market registers (available at <a href="https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.emrdeliverybody.com%2FCM%2FRegisters.aspx&amp;data=02%7C01%7CShamim.Choudhury%40beis.gov.uk%7Cb0ce89e6f28f418f7a3c08d73141cd7b%7Ccbac700502c143ebb497e6492d1b2dd8%7C0%7C0%7C637032030991962734&amp;sdata=Hpo4fN%2B81MocmnaBo%2BIvIeY816tzELYb8cb6Hrgxyps%3D&amp;reserved=0" target="_blank">https://www.emrdeliverybody.com/CM/Registers.aspx</a>) provide a record of which capacity providers in GB have legal agreements requiring them to make their capacity available over coming years.</p><p> </p><p>Energy policy in Northern Ireland is largely a transferred (devolved) matter and a Capacity Market was introduced as part of the relaunched Single Electricity Market in October 2018.</p><p> </p><p>Decommissioning decisions are a commercial matter for the company concerned. Following consultation in November 2016 the Government confirmed its commitment to put an end to unabated coal power generation in GB from 2025.</p>
answering member constituency Spelthorne remove filter
answering member printed Kwasi Kwarteng more like this
grouped question UIN
290403 more like this
290404 more like this
290405 more like this
290406 more like this
290407 more like this
290408 more like this
290409 more like this
290411 more like this
290412 more like this
290413 more like this
290414 more like this
290415 more like this
290416 more like this
290417 more like this
290418 more like this
290419 more like this
290420 more like this
290421 more like this
290422 more like this
question first answered
less than 2019-10-01T15:27:47.95Zmore like thismore than 2019-10-01T15:27:47.95Z
answering member
4134
label Biography information for Kwasi Kwarteng more like this
tabling member
4470
label Biography information for Alan Brown more like this