answer text |
<p>The Department does not estimate the future size of the transmission network. The
Electricity System Operator, along with Transmission Operators and Ofgem, is responsible
for the development of the network. The ESO is required to publish annual recommendations
for which transmission network reinforcement projects should receive investment, but
this does not include data on the length of projects. The latest recommendations,
published in the 'Beyond 2030' report, cover network needs up to the mid-2030s. The
report is available on the ESO's website.</p>
|
|