Linked Data API

Show Search Form

Search Results

1019373
registered interest false more like this
date less than 2018-12-03more like thismore than 2018-12-03
answering body
Department of Health and Social Care more like this
answering dept id 17 more like this
answering dept short name Health and Social Care more like this
answering dept sort name Health and Social Care more like this
hansard heading Clinical Waste more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Health and Social Care, if he will estimate how much (a) anatomical and (b) cytotoxic waste the NHS (i) produced in (A) 2017 and (B) 2018 and (ii) will produce in (A) 2025 and (B) 2030. more like this
tabling member constituency Windsor remove filter
tabling member printed
Adam Afriyie more like this
uin 198202 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-12-11more like thismore than 2018-12-11
answer text <p>The following table shows the information that NHS Improvement hold for the waste produced by the National Health Service in 2017 and 2018. NHS Improvement does not currently hold a breakdown of waste into anatomical and cytotoxic.</p><p> </p><p>The data contained within this table relates only to England. As waste disposal is a devolved matter, devolved administrations should be contacted for figures in those nations.</p><p> </p><p>NHS Improvement and the Environment Agency are not in a position to estimate anatomical and cytotoxic waste figures in 2025 and 2030.</p><p> </p><table><tbody><tr><td><p> </p></td><td><p>Sum of Landfill disposal volume (Tonnes)</p></td><td><p>Sum of Incineration disposal volume (Tonnes)</p></td><td><p>Sum of Waste recycling volume (Tonnes)</p></td><td><p>Sum of Other recovery volume (Tonnes)</p></td></tr><tr><td><p>2017-18</p></td><td><p>58,152</p></td><td><p>74,730</p></td><td><p>107,848</p></td><td><p>183,502</p></td></tr><tr><td><p>2016-17</p></td><td><p>88,594</p></td><td><p>148,424</p></td><td><p>137,442</p></td><td><p>216,495</p></td></tr></tbody></table>
answering member constituency Wimbledon more like this
answering member printed Stephen Hammond more like this
question first answered
less than 2018-12-11T16:42:46.467Zmore like thismore than 2018-12-11T16:42:46.467Z
answering member
1585
label Biography information for Stephen Hammond remove filter
tabling member
1586
label Biography information for Adam Afriyie more like this
47349
registered interest false more like this
date less than 2014-04-07more like thismore than 2014-04-07
answering body
Department for Transport more like this
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what recent steps he has taken to improve transport connections between Windsor and London. more like this
tabling member constituency Windsor remove filter
tabling member printed
Adam Afriyie more like this
uin 195451 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2014-04-29more like thismore than 2014-04-29
answer text <p> </p><p>The programme to increase passenger capacity on the Windsor to Waterloo railway by 25% is now under way and will be completed in early 2015. 60 additional carriages are being incorporated into an extended and refurbished fleet of trains to operate as a maximum 10 carriage train length. The first additional vehicles are now in service. From May 2014, platform 20 of the former Waterloo International station will be brought into use for scheduled services. Construction of Crossrail is now half completed and electrification of the Great Western Main Line is also under way; the Slough to Windsor &amp; Eton Central line will be electrified by 2019. The Highways Agency is welcoming preliminary comments on the M4 Smart Motorway scheme between Junction 3 (Hayes) and Junction 12 (Theale) until the end of April 2014, and will conduct a formal public consultation on the scheme in the autumn. Subject to development consent and the final business case, construction could start in spring 2016.</p>
answering member constituency Wimbledon more like this
answering member printed Stephen Hammond more like this
question first answered
less than 2014-04-29T12:00:00.00Zmore like thismore than 2014-04-29T12:00:00.00Z
answering member
1585
label Biography information for Stephen Hammond remove filter
tabling member
1586
label Biography information for Adam Afriyie more like this