Linked Data API

Show Search Form

Search Results

1111001
registered interest false more like this
date less than 2019-04-10more like thismore than 2019-04-10
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Level Crossings: Greenwich more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what discussions he has had with Network Rail on the proposed closure of the Angerstein pedestrian level crossing as a result of upgrade works. more like this
tabling member constituency Greenwich and Woolwich more like this
tabling member printed
Matthew Pennycook more like this
uin 243536 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>The Secretary of State for Transport has not had any discussions with Network Rail on the proposed closure of Angerstein pedestrian level crossing.</p><p> </p><p>The management of level crossings on the UK rail network is an operational matter for Network Rail, who are the infrastructure managers of Britain’s railways.</p> more like this
answering member constituency Harrogate and Knaresborough more like this
answering member printed Andrew Jones more like this
question first answered
less than 2019-04-15T10:07:53.32Zmore like thismore than 2019-04-15T10:07:53.32Z
answering member
3996
label Biography information for Andrew Jones more like this
tabling member
4520
label Biography information for Matthew Pennycook more like this
1111188
registered interest false more like this
date less than 2019-04-10more like thismore than 2019-04-10
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading East Coast Main Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, if his Department will carry out an economic assessment of the value of the East Coast Main Line to the UK economy; and if he will make a statement. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 243443 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>In 2017 Network Rail published their document “East Coast Main Line Route Study – Railway Investment Choices”. In respect of an economic assessment of the East Coast Main Line as a fast, high yield route connecting London with the North and Scotland, it was stated that a third of the UK population lives within 20 minutes of an ECML station; and together they produce 41% of the UK’s GDP (Source: Office of National Statistics Gross Value Added).</p><p> </p><p>A link to the Network Rail publication can be found here</p><p><a href="https://www.networkrail.co.uk/wp-content/uploads/2017/12/East-Coast-Main-Line-Route-Study.pdf" target="_blank">https://www.networkrail.co.uk/wp-content/uploads/2017/12/East-Coast-Main-Line-Route-Study.pdf</a></p> more like this
answering member constituency Harrogate and Knaresborough more like this
answering member printed Andrew Jones more like this
question first answered
less than 2019-04-15T10:29:25.193Zmore like thismore than 2019-04-15T10:29:25.193Z
answering member
3996
label Biography information for Andrew Jones more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1111189
registered interest false more like this
date less than 2019-04-10more like thismore than 2019-04-10
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading East Coast Main Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what plans his Department has to allocate funding to the East Coast Main Line in the Network Rail Control Periods CP6 and CP7; and if he will make a statement. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 243444 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>The Prime Minister has announced Control Period 6 investment of up to £780m in the East Coast Main Line. This will fund power supply upgrades between Doncaster and Edinburgh, a new rail junction near Peterborough, a new platform at Stevenage Station and improvements to the track layout at King’s Cross Station. The Department is working with stakeholders, including Transport for the North, to identify and assess further potential enhancements for the East Coast Main Line. We will take staged decisions to progress further enhancements through the Rail Network Enhancement Pipeline process.</p> more like this
answering member constituency Harrogate and Knaresborough more like this
answering member printed Andrew Jones more like this
question first answered
less than 2019-04-15T11:52:31.313Zmore like thismore than 2019-04-15T11:52:31.313Z
answering member
3996
label Biography information for Andrew Jones more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1111190
registered interest false more like this
date less than 2019-04-10more like thismore than 2019-04-10
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading East Coast Main Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what steps he is taking to improve infrastructure on the East Coast Main Line in preparation for the arrival of High Speed Two rolling stock; and if he will make a statement. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 243445 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>HS2 Ltd is currently identifying the works that may be required to accommodate HS2 services on the Conventional Rail Network from 2033. The initial assessment of areas where HS2 Ltd may need to undertake work is set out in the WDES, and work is ongoing to confirm which works will be needed. The works required will be detailed in the Phase 2b hybrid Bill, alongside the environmental assessment in the formal Environmental Statement, when the Phase 2b scheme is deposited in Parliament next year.</p><p> </p><p>The Volume 4 of the WDES is available here:</p><p> </p><p><a href="https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/745090/HS2_Phase_2b_Working_Draft_ES_Volume_4_Off-route_effects.pdf" target="_blank">https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/745090/HS2_Phase_2b_Working_Draft_ES_Volume_4_Off-route_effects.pdf</a></p><p> </p> more like this
answering member constituency Wealden more like this
answering member printed Ms Nusrat Ghani more like this
question first answered
less than 2019-04-15T09:39:29.31Zmore like thismore than 2019-04-15T09:39:29.31Z
answering member
4460
label Biography information for Ms Nusrat Ghani more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1111191
registered interest false more like this
date less than 2019-04-10more like thismore than 2019-04-10
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading East Coast Main Line more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what plans he has to help improve (a) resilience, (b) capacity and (c) journey times on the East Coast Main Line between York and Newcastle; and if he will make a statement. more like this
tabling member constituency Newcastle upon Tyne North more like this
tabling member printed
Catherine McKinnell more like this
uin 243446 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>The Department is investing up to £780m in Control Period 6 to upgrade the East Coast Main Line. In conjunction with the introduction of new fleets of trains for both London North Eastern Railway and TransPenninne Express, this will improve capacity and journey times along the length of the Line. The Department continues to work with Transport for the North to identify and assess further potential enhancements between York and Newcastle. The Statement of Funds Available that was announced on 12 October 2017 focusses on the operation, maintenance and renewal of the railway to improve reliability. Network Rail’s Strategic Business Plan 2019 to 2024 for the London North Eastern and East Midlands Route explains how this investment will be used to improve the resilience of the East Coast Main Line.</p> more like this
answering member constituency Harrogate and Knaresborough more like this
answering member printed Andrew Jones more like this
question first answered
less than 2019-04-15T12:00:07.403Zmore like thismore than 2019-04-15T12:00:07.403Z
answering member
3996
label Biography information for Andrew Jones more like this
tabling member
4125
label Biography information for Catherine McKinnell more like this
1111198
registered interest false more like this
date less than 2019-04-10more like thismore than 2019-04-10
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading A2: Garages and Petrol Stations more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, for what reason the sale of Tollgate Hotel Watling Street Gravesend Kent DA13 9RA to BP Oil UK Limited has been delayed. more like this
tabling member constituency Gravesham more like this
tabling member printed
Adam Holloway more like this
uin 243371 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>Highways England entered into a conditional contract with BP for the sale of Tollgate Hotel that was conditional on planning permission being granted for development. The planning applications submitted have been subject to a number of judicial reviews, which have delayed the sale. As a result, Highways England have now agreed with BP to move to an unconditional contract; this means the sale will no longer be dependent on gaining planning permission, and Highways England will now be able to move forward with the sale.</p><p>Given that Highways England will be entering into a new unconditional contract with BP for the sale of the property, they have no plans to remarket it at this time.</p> more like this
answering member constituency Hereford and South Herefordshire more like this
answering member printed Jesse Norman more like this
question first answered
less than 2019-04-15T12:56:28.643Zmore like thismore than 2019-04-15T12:56:28.643Z
answering member
3991
label Biography information for Jesse Norman more like this
tabling member
1522
label Biography information for Adam Holloway more like this
1110555
registered interest false more like this
date less than 2019-04-09more like thismore than 2019-04-09
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Railways: Tickets more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, how many amendments his Department has made to the rail ticketing and settlement agreement since the establishment of that scheme. more like this
tabling member constituency Cleethorpes more like this
tabling member printed
Martin Vickers more like this
uin 242792 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>The Ticketing and Settlement Agreement (TSA) is maintained and managed by the Rail Delivery Group (RDG) on behalf of the train operators. It is for the industry to propose changes to the TSA, and for Secretary of State to approve those changes where he is required to do so. The RDG has submitted to the Williams Rail Review its proposals for reform of the fares system, including reform of the TSA, and we are ready to work with the industry to consider how its proposals might work and be tested in the real world.</p><p> </p> more like this
answering member constituency Harrogate and Knaresborough more like this
answering member printed Andrew Jones more like this
grouped question UIN
242793 more like this
242794 more like this
question first answered
less than 2019-04-15T13:06:26.167Zmore like thismore than 2019-04-15T13:06:26.167Z
answering member
3996
label Biography information for Andrew Jones more like this
tabling member
3957
label Biography information for Martin Vickers more like this
1110556
registered interest false more like this
date less than 2019-04-09more like thismore than 2019-04-09
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Railways: Tickets more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what recent assessment he has made of the effectiveness of the rail ticketing and settlement agreement, and if he will make a statement. more like this
tabling member constituency Cleethorpes more like this
tabling member printed
Martin Vickers more like this
uin 242793 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>The Ticketing and Settlement Agreement (TSA) is maintained and managed by the Rail Delivery Group (RDG) on behalf of the train operators. It is for the industry to propose changes to the TSA, and for Secretary of State to approve those changes where he is required to do so. The RDG has submitted to the Williams Rail Review its proposals for reform of the fares system, including reform of the TSA, and we are ready to work with the industry to consider how its proposals might work and be tested in the real world.</p><p> </p> more like this
answering member constituency Harrogate and Knaresborough more like this
answering member printed Andrew Jones more like this
grouped question UIN
242792 more like this
242794 more like this
question first answered
less than 2019-04-15T13:06:26.213Zmore like thismore than 2019-04-15T13:06:26.213Z
answering member
3996
label Biography information for Andrew Jones more like this
tabling member
3957
label Biography information for Martin Vickers more like this
1110575
registered interest false more like this
date less than 2019-04-09more like thismore than 2019-04-09
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Railways: Bescot more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, what estimate Network Rail has made of the business rates that will be payable to Sandwell Metropolitan Borough Council in the event that planning consent is granted for a new sleeper factory at Bescot Rail Yard. more like this
tabling member constituency West Bromwich East more like this
tabling member printed
Tom Watson more like this
uin 242743 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>A proposal for a new facility in Bescot is being developed by Network Rail to produce the sleepers necessary for them to maintain, renew, and enhance our rail network. The facility is intended to make up the shortfall when an existing facility at Washwood Heath is closed to become an HS2 depot.</p><p> </p><p>Network Rail estimates that the proposed development will generate approximately £300,000 in annual business rates revenue payable to Sandwell Borough Council.</p> more like this
answering member constituency Harrogate and Knaresborough more like this
answering member printed Andrew Jones more like this
question first answered
less than 2019-04-15T10:38:39.877Zmore like thismore than 2019-04-15T10:38:39.877Z
answering member
3996
label Biography information for Andrew Jones more like this
tabling member
1463
label Biography information for Lord Watson of Wyre Forest more like this
1110576
registered interest false more like this
date less than 2019-04-09more like thismore than 2019-04-09
answering body
Department for Transport remove filter
answering dept id 27 more like this
answering dept short name Transport more like this
answering dept sort name Transport more like this
hansard heading Railways: Bescot more like this
house id 1 more like this
legislature
25259
pref label House of Commons more like this
question text To ask the Secretary of State for Transport, which sites were identified by Network Rail as its (a) second and (b) third choice preference for a new sleeper factory following the selection of Bescot Rail Yard as its preferred site; for what reasons those two sites were rejected; and if he will make a statement. more like this
tabling member constituency West Bromwich East more like this
tabling member printed
Tom Watson more like this
uin 242744 more like this
answer
answer
is ministerial correction false more like this
date of answer remove filter
answer text <p>A proposal for a new facility in Bescot is being developed by Network Rail to produce the sleepers necessary for them to maintain, renew, and enhance our rail network. The facility is intended to make up the shortfall when an existing facility at Washwood Heath is closed to become an HS2 depot.</p><p> </p><p>There were originally six sites identified as potential locations for a new sleeper factory. Following a comprehensive review, Bescot Down in Sandwell and Kingmoor Depot in Carlisle were shortlisted for final consideration.</p><p> </p><p>Kingmoor was subsequently discounted for a variety of reasons, including: a number of potentially significant environmental constraints such as land contamination; being located adjacent to several designated heritage assets as well as being within a world heritage site – significantly increasing development costs and reducing viability; and its geographical location in the north-west of England posing logistical challenges for transporting sleepers to projects based around the entire network.</p><p> </p><p>I have no plans to make a statement about the proposed facility.</p>
answering member constituency Harrogate and Knaresborough more like this
answering member printed Andrew Jones more like this
question first answered
less than 2019-04-15T10:15:09.807Zmore like thismore than 2019-04-15T10:15:09.807Z
answering member
3996
label Biography information for Andrew Jones more like this
tabling member
1463
label Biography information for Lord Watson of Wyre Forest more like this