1002220
registered interest false more like this
date less than 2018-11-05more like thismore than 2018-11-05
answering body
The Senior Deputy Speaker more like this
answering dept id 204 more like this
answering dept short name
answering dept sort name Senior Deputy Speaker (HoL) more like this
hansard heading Parliamentary Estate: Repairs and Maintenance more like this
house id 2 more like this
legislature
25277
pref label House of Lords more like this
question text To ask the Senior Deputy Speaker what is the estimated cost to the House of (1) restoration, (2) repair, and (3) fire protection work underway in (a) the Palace of Westminster, (b) Fielden House, and (c) Millbank House. more like this
tabling member printed
Lord Foulkes of Cumnock more like this
uin HL11241 more like this
answer
answer
is ministerial correction false more like this
date of answer less than 2018-12-04more like thismore than 2018-12-04
answer text <p>‘Restoration’ has been taken to include work currently underway on the Estate to restore or conserve areas of the historic building fabric, including but not limited to the restoration work in Westminster Hall and the Encaustic Tile project. It does not include the estimated costs of the Restoration and Renewal Programme. ‘Repair’ includes project works underway on the estate but does not include general day to day maintenance. Fire protection work costs are based on the Fire Life Safety Works Programme.</p><p> </p><table><tbody><tr><td><p> </p></td><td><p>Palace of Westminster</p></td><td><p>Millbank House</p></td><td><p>Fielden House</p></td></tr><tr><td><p>Restoration</p></td><td><p>External Courtyards Conservation work (Phase 1) current approved cost: £20.2m; Westminster Hall current approved cost: £12.1m (subject to review); Elizabeth Tower current approved cost: £61.1m (subject to review); Cast Iron Roofs current approved cost: £84.4m; Encaustic Tiles current approved cost: £14.3m.</p></td><td><p>There is no restoration work currently underway.</p></td><td><p>There is no restoration work currently underway.</p></td></tr><tr><td><p>Repair</p></td><td><p>Works to the Palace in 2017/18 totalled £2m; works in 2018/19 are forecast to cost £2.8m.</p></td><td><p>Works to 5 Great College Street and its integration into Millbank House total £42.9m.</p></td><td><p>Planning is underway for the refurbishment of Fielden House. Surveying work is expected to commence in December 2018. The surveying working is required to finalise the business case. Until it is finalised it is not possible to provide an estimate.</p></td></tr><tr><td><p>Fire Protection</p></td><td><p>The approved business cases forecast expenditure of £90m for fire safety work underway in the Palace of Westminster. The forecast expenditure of a project within the Fire Safety programme is currently being revised.</p></td><td><p>The cost of fire protection in the Great College Street area of Millbank House has been integrated into the project itself and therefore is included in the repair figure above. The cost of Fire Protection in 1&amp;2 Millbank is currently forecast at £1.6m excluding risk and optimism bias (OB) and £2.1m including risk and OB.</p></td><td><p>The cost of making Fielden House Fire Life Safety compliant will form part of the refurbishment project. Therefore, it is not possible currently to confirm how much it will cost.</p></td></tr></tbody></table>
answering member printed Lord McFall of Alcluith more like this
question first answered
less than 2018-12-04T13:10:58.93Zmore like thismore than 2018-12-04T13:10:58.93Z
answering member
4148
label Biography information for Lord McFall of Alcluith more like this
tabling member
579
label Biography information for Lord Foulkes of Cumnock more like this